IR 05000338/2022402

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000338/2022402 and 05000339/2022402
ML22242A142
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 08/31/2022
From: Jannette Worosilo
NRC/RGN-II/DRS/PSB1
To: Stoddard D
Virginia Electric & Power Co (VEPCO)
References
IR 2022402
Download: ML22242A142 (7)


Text

SUBJECT:

NORTH ANNA POWER STATION - SECURITY BASELINE INSPECTION REPORT 05000338/2022402 AND 05000339/2022402

Dear Mr. Stoddard:

On August 4, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at North Anna Power Station and discussed the results of this inspection with Mr. James H.

Jenkins and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000338 and 05000339 License Nos. NPF-4 and NPF-7

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000338 and 05000339

License Numbers:

NPF-4 and NPF-7

Report Numbers:

05000338/2022402 and 05000339/2022402

Enterprise Identifier:

I-2022-402-0023

Licensee:

Virginia Electric and Power Company

Facility:

North Anna Power Station

Location:

Mineral, Virginia

Inspection Dates:

August 01,2022 to August 04, 2022

Inspectors:

J. Wallo, Senior Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at North Anna Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1) Tier I: All Requirements

Tier II: (02.06 a-c, 02.07 a, 02.08, a, b, f, e)

Tier III: (02.09)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following

procedure elements: Security Plan Changes

(1) The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2)since the last performance of this IP.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) August 2021 through August

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On August 4, 2022, the inspectors presented the security baseline inspection results to Mr. James H. Jenkins and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

203760

SY-AA-106

Control of Safeguards Information, Security Related

Information, and CUI

Revision 19

SY-AA-118

Owner Controlled Area Access Control

Revision 2

Procedures

SY-AA-119

Protected Area Access Control

Revision 4

71130.02

Work Orders

203335359

2/21/2022

71130.09

Procedures

SY-AA-103

Security Plan & Procedure Review Process

Revision 14

1196789

1199610

202494

Corrective Action

Documents

203956

71151

Miscellaneous

Various Licensee

Performance

Indicator

Documents