September 9, 2019

SUBJECT:

NORTH ANNA POWER STATION, UNITS 1 AND 2 - U.S. NUCLEAR

REGULATORY COMMISSION SECURITY INSPECTION REPORT

05000338/2019412 AND 05000339/2019412

Dear Mr. Stoddard:

On August 8, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your North Anna Power Station, Units 1 and 2 and discussed the results of this inspection with Mr. E. Hendrickson and other members of your staff. The results of this inspection are documented in the enclosed report.

No NRC-Identified or self-revealing findings were identified during the inspections.

This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room, in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Binoy Desai, Chief Plant Support Branch

Division of Reactor Safety

Docket Nos. 50-338 and 50-339 License Nos. NPF-4 and NPF-7

Enclosure:

NRC IR 05000338/2019412 and 05000339/2019412

Inspection Report

Docket Nos:

05000338 and 05000339

License Nos:

NPF-4 and NPF-7

Report Nos:

05000338/2019412 and 05000339/2019412

Enterprise Identifier:

I-2019-412-000

Licensee:

Virginia Electric and Power Company

Facility:

North Anna Power Station, Units 1 and 2

Location:

North Anna, VA

Dates:

August 5-8, 2019

Inspectors:

John Tornow, Physical Security Inspector

Randy Patterson, Physical Security Inspector

Approved by:

Binoy Desai, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting a Baseline Security Inspection at North Anna Power Station,

Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight

Process is the NRCs program for overseeing the safe operation of commercial nuclear power

reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

NRC and self-revealed findings, violations, and additional items are summarized in the table

below.

List of Findings and Violations

No findings were identified.

INSPECTION SCOPE

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for

Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and

records, observed activities, and interviewed personnel to assess licensee performance and

compliance with Commission rules and regulations, license conditions, site procedures, and

standards.

SAFEGUARDS

71130.04 - Equipment Performance, Testing, and Maintenance (1 Sample)

The inspectors evaluated the security testing and maintenance program. The following

elements were evaluated from this IP dated January 1, 2019.

Tier I:

all 38 requirements

Tier II:

4 requirements 02.09 (a); 02.12 (a); 02.13 (a), (d)

Tier III:

2 requirements 02.14; 02.15 (a)

71130.07 - Security Training (1 Sample)

The inspectors evaluated the nuclear security training program. The following elements were

evaluated from this IP dated January 1, 2019.

Tier I:

all 16 requirements

Tier II:

8 requirements 02.05 (a), (b), (c), (d); 02.06 (a), (b); 02.09 (a)

Tier III:

5 requirements 02.10, 02.11(a); 02.13 (a), (b), (c)

EXIT MEETINGS AND DEBRIEFS

On August 8, 2019, the inspectors presented the Baseline Security Inspection results to Mr. Eric

Hendrixson and other members of the licensee staff.

DOCUMENTS ISSUED

Inspection

Procedure

Type

Designation

Description of Title

Revision & Date

71130.07

Procedures

NOS Audit 19-01

Security

On-the-Job Trainer and Task Performance

Evaluator Lesson Plan

Rev 7

Security Self-Assessment

June 13, 2019

Security 2019 Written Exam A, B, and C

SY-AA-TR-101-

Nuclear Security Training Program

Rev 11

SY-AA-TR-103

Critical Task Qualification and Re-

Qualification Failure Actions

Rev 2

SY-AA-TR-104

Task Performance Evaluation

Rev 1

71130.04

Procedures

SY-AA-TR-201

Security Drills and Exercise

Rev 10

SY-AA-TR-102

Weapons Accountability, Testing, and

Maintenance

Rev 7

SY-AA-116

Maintenance, Testing, and Calibration

Rev 0

SY-AA-120,

Operability Testing

Rev 1

SY-AA-121

Central / Secondary Alarm Station

Operations

Rev 0

SY-AA-132

Communications

Rev 0

SY-AA-122

Security Officer Equipment

Rev 1

71130.04

Condition

Reports

18-1107334, 19-1122477, 19-1122633,19-1122461, 19-1123889, 19-1124416,

19-1121951, 18-1104198, 18-1105740, 19-1128533

71130.07

Condition

Reports

19-1114294, 19-1122927, 19-2261565, 18-1111711, 19-1113704, 19-1127915,

19-1119937, 19-7658185, 19-1128542, 19-7658211