Biennial Problem Identification and Resolution Inspection Report 05000338/2019011 and 05000339/2019011
ML19350B977
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/16/2019
From: Bradley B
NRC/RGN-II/DRP/RPB4
To: Stoddard D
Virginia Electric & Power Co (VEPCO)
P. Niebaum, RII/DRP
References
IR 2019011
Download: ML19350B977 (20)


Text

December 16, 2019

SUBJECT:

NORTH ANNA POWER STATION, UNITS 1 AND 2 - BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000338/2019011 AND 05000339/2019011

Dear Mr. Stoddard:

On November 7, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed a problem identification and resolution inspection at your North Anna Power Station, Units 1 and 2. On November 7, 2019 the NRC inspectors discussed the results of this inspection with Mr. Jim Jenkins and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspection team reviewed the stations corrective action program and the stations implementation of the program to evaluate its effectiveness in identifying, prioritizing, evaluating, and correcting problems, and to confirm that the station was complying with NRC regulations and licensee standards for corrective action programs. Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.

The team also evaluated the stations processes for use of industry and NRC operating experience information and the effectiveness of the stations audits and self-assessments.

Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.

Finally, the team reviewed the stations programs to establish and maintain a safety-conscious work environment and interviewed station personnel to evaluate the effectiveness of these programs. Based on the teams observations and the results of these interviews the team found no evidence of challenges to your organizations safety-conscious work environment. Your employees appeared willing to raise nuclear safety concerns through at least one of the several means available. No NRC-identified or self-revealing findings were identified during this inspection.

A licensee-identified violation which was determined to be of very low safety significance is documented in this report. We are treating this violation as a non-cited violation (NCV)

consistent with Section 2.3.2 of the Enforcement Policy.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Bradley J. Davis, Chief Reactor Projects Branch 4 Division of Reactor Projects

Docket Nos. 05000338 and 05000339 License Nos. NPF-4 and NPF-7

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000338 and 05000339

License Numbers:

NPF-4 and NPF-7

Report Numbers:

05000338/2019011 and 05000339/2019011

Enterprise Identifier:

I-2019-011-0030

Licensee:

Virginia Electric and Power Company

Facility:

North Anna Power Station, Units 1 and 2

Location:

Mineral, VA

Inspection Dates:

October 21, 2019 to November 08, 2019

Inspectors:

A. Beasten, Resident Inspector (Team Leader)

G. Eatmon, Resident Inspector

P. Niebaum, Senior Project Engineer

J. Steward, Resident Inspector

Approved By:

Bradley J. Davis, Chief

Reactor Projects Branch 4

Division of Reactor Projects

Commented [EG1]: Does the TL get identified?

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a biennial problem identification and resolution inspection at North Anna Power Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. A licensee-identified non-cited violation is documented in report section: 71152

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

Commented [EG2]: what about the LIV?

Commented [NP3R2]: Not reqd per IMC 0611

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

OTHER ACTIVITIES - BASELINE

71152B - Problem Identification and Resolution Biennial Team Inspection (IP Section 02.04)

  • Corrective Action Program Effectiveness: The inspectors assessed the corrective action programs effectiveness in identifying, prioritizing, evaluating, and correcting problems.
  • Operating Experience, Self-Assessments and Audits: The inspectors assessed the effectiveness of the stations processes for use of operating experience, audits and self-assessments.
  • Safety Conscious Work Environment: The inspectors assessed the effectiveness of the stations programs to establish and maintain a safety-conscious work environment.

INSPECTION RESULTS

Assessment 71152B Corrective Action Program Assessment: Based on the samples reviewed, the team determined that the licensees corrective action program (CAP) complied with regulatory requirements and self-imposed standards. The licensees implementation of the CAP adequately supported nuclear safety.

Effectiveness of Problem Identification: The inspectors determined that the licensee was effective in identifying problems and entering them into the CAP at the appropriate threshold. This conclusion was based on a review of the requirements for initiating condition reports (CRs) as described in licensee procedure PI-AA-200, "Corrective Action Program,"

and the site's management expectation that employees were encouraged to initiate condition reports. Additionally, site management was actively involved in the corrective action program and focused appropriate attention on significant plant issues. The inspectors performed walk downs, reviewed CRs, and reviewed system health trending for Diesel Generators and emergency AC power, the Service Water System, and the Low Head Safety Injection System. Based on the inspectors' reviews and walk downs of accessible portions of those systems, the inspectors determined that deficiencies were being identified and placed in the CAP.

Effectiveness of Problem Prioritization and Evaluation: Based on the review of CRs sampled by the inspection team during the onsite period, the inspectors concluded that problems were prioritized and evaluated in accordance with the CAP requirements described in procedure PI-AA-200. The inspectors determined that adequate consideration was given to system or component operability and associated plant risk. The inspectors determined that plant personnel had generally conducted cause evaluations in compliance with the licensees CAP procedures, including appropriate cause determinations, and performed adequate levels of analysis based on the significance of the issues being evaluated.

Effectiveness of Corrective Actions: Based on a review of corrective action documents, interviews with licensee staff, and verification of completed corrective actions, the inspectors determined that corrective actions were effective, timely, and commensurate with the safety significance of the issues. For significant conditions adverse to quality, the corrective actions directly addressed the cause and effectively prevented recurrence. The inspectors reviewed performance indicators, CRs, and effectiveness reviews, as applicable, to verify that the significant conditions adverse to quality had not recurred. Effectiveness reviews for corrective actions to preclude repetition (CAPRs) were sufficient to ensure corrective actions were properly implemented and were effective.

Assessment 71152B Operating Experience, Self-Assessments, and Audits: The inspectors examined the licensee's program for obtaining and using industry operating experience. This included a review of procedure PI-AA-100-1007, "Operating Experience Program," selected corrective action program action requests, and the licensees operating experience (OE) database to assess the effectiveness of how external and internal OE data was evaluated at the plant. Additionally, the inspectors selected OE documents such as NRC generic communications, licensee event reports, vendor notifications, and plant internal OE items which had been issued since July 2017 to verify that the licensee had appropriately evaluated each notification for applicability to the station, and whether issues identified through these reviews were entered into the CAP.

The inspectors determined that the scopes of assessments and audits were adequate. Self-assessments were generally detailed and critical. The inspectors verified that condition reports (CRs) were created to document areas for improvement and findings resulting from self-assessments and verified that actions had been completed consistent with those recommendations. Audits of the quality assurance program appropriately assessed performance and identified areas for improvement. Generally, the licensee performed evaluations that were technically accurate.

The inspectors determined that the station's processes for the use of industry and NRC operating experience information and for the performance of audits and self assessments were effective and complied with all regulatory requirements and licensee standards. The implementation of these programs adequately supported nuclear safety. The inspectors concluded that operating experience was adequately evaluated for applicability and that appropriate actions were implemented to address lessons learned as needed. The inspectors determined that the licensee was effective at performing self-assessments and audits to identify issues at a low level, properly evaluated those issues, and resolved them commensurate with their safety significance.

Assessment 71152B Safety Conscious Work Environment: Based on a sample of 25 individuals interviewed from a cross-section of plant employees, the inspectors found no evidence of challenges to the safety conscious work environment. Employees interviewed appeared knowledgeable of avenues to raise safety concerns and appeared willing to raise nuclear safety concerns through at least one of the several means available.

Licensee-Identified Non-Cited Violation 71152B This violation of very low safety significance was identified by the licensee and has been entered into the licensee corrective action program and is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Violation: North Anna Technical Specifications 5.4, Procedures, paragraph 5.4.1 required in part that written procedures shall be established, implemented and maintained covering the applicable procedures recommended in Regulatory Guide (RG) 1.33, Rev. 2, Appendix A, dated February 1978. RG 1.33, Quality Assurance Program Requirements (Operations),

Rev. 2, Appendix A, section 9.b required in part that preventive maintenance schedules should be developed to specify inspections of equipment. Licensee Procedure 0-MPM-1207-04, Annual Pumping of Security and Electrical Cable Vaults, Rev. 10, implemented this requirement for certain safety related (SR) medium voltage cables. Contrary to the above, the licensee failed to inspect (SR) medium voltage cables susceptible to water submergence in accordance with this procedure. Licensee procedure 0-MPM-1207-04 required annual pumping and inspections of SR medium voltage cables susceptible to submergence to prevent long term submergence of electrical cables which could lead to cable degradation. According to the licensee, the annual inspections have not occurred since 2016.

Significance/Severity: Green. This violation was screened to Green, very low safety significance in accordance with IMC 0609, Appendix A, The Significance Determination Process (SDP) for Findings at Power, dated June 19, 2012, Exhibit 2, Mitigating Systems Screening Questions because all of the screening questions were answered No.

Corrective Action References: This issue was documented in the licensees corrective action program (CAP) as condition report (CR) 1133235.

Minor Violation 71152B Minor Violation: The NRC identified a minor violation of 10 CFR 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the licensees failure to ensure that instructions, procedures, or drawings were appropriate for the circumstances. Specifically, the licensee failed to ensure that maintenance procedure 0-MPM-0452-18, Visual Inspection of Damper for Condition of External Duct Work, Operator, Hardware and Operation, and the model preventive maintenance (PM) work orders (WO) included adequate instructions for inspection of the Control Room and Emergency Switchgear Air Handlers.

Following a failure of the main control room chiller fan discharge damper to open when the fan was started, the licensee revised maintenance procedure 0-MPM-0452-18 to include instructions for mechanical inspection of the damper linkages. The inspectors reviewed the maintenance procedure and observed that the Note added prior to step 6.2.3 in the procedure failed to direct action to use a wrench to test for tightness.

Screening: The inspectors determined the performance deficiency was minor. The performance deficiency was screened in accordance with Inspection Manual Chapter 0612 Appendix B. The inspectors determined the performance deficiency was minor because no subsequent failures of the main control room chiller discharge dampers have occurred. This issue was captured in CR 11135344.

Enforcement:

This failure to comply with 10 CFR 50, Appendix B, Criterion V constitutes a minor violation that is not subject to enforcement action in accordance with the NRCs Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On November 7, 2019, the inspectors presented the biennial problem identification and resolution inspection results to Mr. Jim Jenkins and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71152B

Calculations

CT-EQUAL-000-

GQE-06.02-G01

71152B

Calculations

NA-EQUAL-000-

PQE-06.02-P01

71152B

Corrective Action

Documents

ACE 013252

ACE 3066417

ACE 3070837

ACE 3056632

ACE 3084650

ACE 3151216

Apparent Cause Evaluation

71152B

Corrective Action

Documents

CA 3031034

CA 3049131

CA 3056633

CA 3065939

CA 3069003

CA 3070099

CA 3070100

CA 3070231

CA 3070232

CA 3075045

CA 3075050

CA 3151215

CA 3154355

CA 3166734

CA 3166959

CA 3168772

CA 3168774

CA 7298545

CA 7310582

CA 7312500

CA 7374628

CA 7376776

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CA 7395457

CA 7433019

CA 7459183

CA 7474370

CA 7482599

CA 7482608

CA 7486588

CA 7488252

CA 7488254

CA 7492892

CA 7498661

CA 7510589

CA 7512926

CA 7517194

CA 7517205

CA 7517219

CA 7517220

CA 7517221

CA 7518983

CA 7519648

CA 7520768

CA 7525374

CA 7584424

CA 7587968

CA 7593188

CA 7605944

CA 7608868

CA 7610872

CA 7616221

CA 7631022

CA 7631762

CA 7631763

CA 7639127

CA 7642350

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CA 7646744

CA 7649215

CA 7656339

CA 7658212

CA 7660850

CA 7671240

CA 7695557

CA 7695558

71152B

Corrective Action

Documents

CR 1113558

CR 1119927

CR 1129587

CR 1131745

Part 21 Evaluations

71152B

Corrective Action

Documents

CR 525801

CR 549139

CR 577960

CR 1001891

CR 1036687

CR 1036795

CR 1052292

CR 1056554

CR 1057223

CR 1057418

CR 1058722

CR 1062578

CR 1062579

CR 1066949

CR 1073360

CR 1076695

CR 1078223

CR 1078405

CR 1078504

CR 1078722

CR 1079201

CR 1079241

Commented [SJ4]: Evaluations is not spelled correctly

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR 1079363

CR 1082177

CR 1083343

CR 1083517

CR 1083602

CR 1083620

CR 1083636

CR 1083803

CR 1084460

CR 1084876

CR 1085033

CR 1085065

CR 1087430

CR 1089154

CR 1089699

CR 1091753

CR 1091778

CR 1092314

CR 1093119

CR 1093692

CR 1093769

CR 1097015

CR 1097201

CR 1097721

CR 1097753

CR 1098252

CR 1098808

CR 1098816

CR 1099558

CR 1103503

CR 1103691

CR 1103698

CR 1103788

CR 1104560

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR 1109736

CR 1109741

CR 1110081

CR 1113055

CR 1113581

CR 1114435

CR 1114785

CR 1114816

CR 1115132

CR 1116471

CR 1116532

CR 1116553

CR 1117127

CR 1117324

CR 1117941

CR 1119937

CR 1120227

CR 1120570

CR 1120826

CR 1120845

CR 1123419

CR 1123421

CR 1123476

CR 1123701

CR 1123824

CR 1124170

CR 1124871

CR 1124877

CR 1124966

CR 1125173

CR 1125645

CR 1125681

CR 1125934

CR 1126297

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR 1126809

CR 1127060

CR 1127144

CR 1127280

CR 1127555

CR 1127630

CR 1128297

CR 1128633

CR 1128717

CR 1129074

CR 1129857

CR 1130277

CR 1130290

CR 1131509

CR 1131558

CR 1131745

CR 1132414

CR 1132861

CR 119857

71152B

Corrective Action

Documents

DTI-CA-3049490

71152B

Corrective Action

Documents

LEE 7298545

LEE 7315898

LEE 7374629

LEE 7379723

LEE 7419976

LEE 7480479

LEE 7630987

LEE 7646819

LEE 7656340

Level of Effort Evaluation

71152B

Corrective Action

Documents

PIR 1130044

PIR 1116952

PIR 1116837

PIR 1115560

Part 21 evaluations for applicability

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

PIR 1112352

PIR 1110540

71152B

Corrective Action

Documents

Resulting from

Inspection

203300380

203300386

203300387

203300388

203300390

203300394

203300395

203300396

203300849

Work Orders

71152B

Corrective Action

Documents

Resulting from

Inspection

CR 1134006

CR 1134008

CR 1134012

CR 1134013

CR 1134014

CR 1134015

CR 1134019

CR 1134020

CR 1134022

CR 1134073

CR 1134083

CR 1134095

CR 1134097

CR 1134100

CR 1134102

CR 1134103

CR 1134104

CR 1134106

CR 1134107

CR 1134108

CR 1134111

CR 1134123

CR 1134125

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR 1134147

CR 1134150

CR 1134443

CR 1134657

CR 1135103

CR 1135106

CR 1135251

CR 1135302

CR 1135339

CR 1135344

71152B

Engineering

Evaluations

ETE-NA-2019-

013

ETE-NA-2018-

011

ETE-NA-2019-

030

ETE-NA-2015-

0054

71152B

Miscellaneous

Service Water System Health Report

Q2-2019

71152B

Miscellaneous

Service Water System Top Issues List

07/08/2019

71152B

Miscellaneous

Safety Injection System Health Report

Q2-2019

71152B

Miscellaneous

1-LOG-6F

Main Control Room Chiller Operating Logs

24

71152B

Miscellaneous

2-AR-K-E1

Annunciator Response Procedure for RWST HI Level

71152B

Miscellaneous

EE007, SW002,

EG002

Service Water System Maintenance Rule Scoping Functions

71152B

Miscellaneous

SDBD-NAPS-SW

Service Water System Design Basis Document

71152B

Miscellaneous

Serial No.17-343

Dominion Energy Letter to the NRC, "Commitments for

Resolution of Anchor Darling Double Disc Gate Valve Part 21

Issues."

August 31,

2017

71152B

Miscellaneous

Serial No. 17-

343A

Dominion Energy Letter to NRC, "Anchor Darling Double

Disc Gate Valve Information and Status."

December

18, 2017

71152B

Miscellaneous

Serial No.18-238

Dominion Energy Letter to the NRC, "Updated Anchor

December

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Darling Double Disc Gate Valve Information and Repair

Status."

19, 2018

71152B

Operability

Evaluations

CA 7355047

Service Water Pump House Missile Vulnerability

08/22/2019

71152B

Procedures

0-GEP-52

Conduct of Post Modification Testing

71152B

Procedures

0-MPM-0452-18

Visual Inspection of Damper for Condition of External Duct

Work, Operator, Hardware and Operation

Revision 4

71152B

Procedures

0-MPM-0806-02

Inspection of Control Room Chillers

71152B

Procedures

EC-AA-110

Identifying and Addressing Nuclear Safety and Quality

Concerns

71152B

Procedures

ER-AA-MRL-10

Maintenance Rule Program

71152B

Procedures

ER-AA-MRL-100

Implementing Maintenance Rule

71152B

Procedures

ER-AA-PRS-1001 Plant Health Committee

71152B

Procedures

ER-AA-SYS-1001

System Health Report

71152B

Procedures

OP-AA-102

Operability Determination

71152B

Procedures

PI-AA-100-1003

Self Evaluation and Trending

71152B

Procedures

PI-AA-100-1004

Self-Assessments

71152B

Procedures

PI-AA-100-1007

Operating Experience Program

71152B

Procedures

PI-AA-200

Corrective Action

71152B

Procedures

PI-AA-300

Cause Evaluation

71152B

Procedures

PI-AA-300-3000

Emergent Issue Response

71152B

Procedures

PI-AA-300-3001

Root Cause Evaluation

71152B

Procedures

PI-AA-300-3004

Cause Evaluation Methods

71152B

Procedures

PI-AA-300-3006

Equipment Apparent Cause Evaluation

71152B

Procedures

PI-AA-300-3007

Level of Effort Evaluation

71152B

Procedures

RM-AA-101

Record Creation, Transmittal, and Retrieval

71152B

Self-Assessments

Maintenance Dept Self Evaluation

July 2019

71152B

Self-Assessments

Emergency Plan Department Self Evaluation Monthly Report

August 2019

71152B

Self-Assessments Audit 17-05

Corrective Action, Independent Review and License

Commitments

08/10/2017

71152B

Self-Assessments Audit 17-07

Inservice Inspection, Inservice Testing and Appendix J

71152B

Self-Assessments Audit 17-09

Nuclear Fuel Management and Procurement and MPS

Refueling

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71152B

Self-Assessments Audit 17-10

Offsite Dose Calculation Manual/Radiological Environmental

Monitoring Program/Environmental Protection Plan

2/08/2018

71152B

Self-Assessments Audit 18-02

Emergency Preparedness

04/16/2018

71152B

Self-Assessments Audit 18-04

Radiological Protection, Process Control Program, and

Chemistry

07/10/2018

71152B

Self-Assessments Audit 18-05

Design Control and Engineering Programs

71152B

Self-Assessments Audit 18-06

Materials and Procurement

09/20/2018

71152B

Self-Assessments Audit 18-07

Document Control, Records, & Procedures

10/31/2018

71152B

Self-Assessments Audit 19-02

Emergency Preparedness

04/17/2019

71152B

Self-Assessments Audit 19-04

Fire Protection, QA Program Implementation and MPS

Refueling

71152B

Self-Assessments Audit 19-05

Corrective Action, Independent Review, and License

Commitments

07/22/2019

71152B

Work Orders

203285593

59080637301

59102472901

59102738867

59102744173

59102776679

59102880719

59103139979

59103140339

203130034

203131880

203140912

203268300

203269312

203275983

203285346

203285591

203290138

203291616

203292714

59403012702