IR 05000335/1993022
| ML17228A421 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 12/29/1993 |
| From: | Sinkule M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Goldberg J FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 9401240031 | |
| Download: ML17228A421 (5) | |
Text
FORD 1 I
REGULATORY INFORMATION DISTRIBUTION SYSTEM <RIDS)
ACCESSION NBR: 9401240031 DOC. DATE: 93/12/29 NOTARIZED:
NO FACIL; 50-335 St.
Lucie Plant.
Unit ii Florida Power 5 Light Co.
50-389 St.
Lucie Planti Unit 2i Florida Potoer h Light Co.
AUTH. NAME AUTHOR AFFILIATION INKULE.M. V.
Region 2 (Post 820201)
REC IP. NAME RECIPIENT AFFILIATION QOLDBERQi J. H.
Florida Power h Light Co.
SUBJECT:
Ack receipt of 931220 ltr informing NRC of steps taken to correct violations noted in insp repts 50-335/93-22 Sc 50-389/93-22.
DISTRIBUTION CODE:
IE019 COPIES RECEIVED LTR ENCL SIZE:
TITLE: Qeneral (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:
DOCKET ¹ 05000335 05000389 INTERNAL'XTERNAL:
RECIPIENT ID CODE/NAME PD2-2 PD ACRS AEOD/DSP/ROAB AEOD/TTC NRR/DORS/OEAB NRR/DR IL/RPEB NRR/PMAS/ILPB 1 NUDOCS-ABSTRACT OQC/HDS3 RES/HFB EQSQ/BRYCE> J. H.
NSIC COPIES LTTR ENCL
1
1
1
RECIPIENT ID CODE/NAME NORRIS'
AEOD/DEIB AEOD/DSP/TPAB DEDRO NRR/DRCH/HHFB NRR/DRSS/PEPB NRR/PMAS/ILPB2 OE DIR g~HhQ VI~LE
RQN2 FILE
NRC PDR COPIES LTTR ~ ENCL NOTE TO ALL RIDS RECIPIENTS:
PLEASE HELP US TO REDUCE O'ASTE! CONTACT THE DOCUMEYT COYTROL DESK.
ROOM PI-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTIOY LISTS FOP. DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL
Docket Nos.:
50-335, 50-389 License Nos.:
DPR-67, NPF-16 Florida Power and Light Company ATTN:
Mr. J.
H. Goldberg President
- Nuclear P. 0.
Box 14000 Juno Beach, FL 33408-0420 Gentlemen:
SUBJECT:
REPORT NOS. 50-335/93-22 AND 50-389/93-22 Thank you for your response of December 20, 1993, to our Notice of Violation issued on November 22, 1993, concerning activities conducted at your St. Lucie facility.
We have evaluated your response and found that it meets the requirements of 10 CFR 2.201.
We will examine the implementation of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely, cc:
D. A. Sager Vice President St.
Lucie Nuclear Plant P. 0.
Box 128 Ft. Pierce, FL 34954-0128 H.
N. Paduano, Manager Licensing and Special Projects Florida Power and Light Company P. 0.
Box 14000 Juno Beach, FL 33408-0420
.
(cc cont'd - See page 2)
Marvin V. Sinkule, Chief Reactor Projects Branch
Division of Reactor Projects 940i24003i 93i229 PDR ADOCK 05000335
Florida Power and Light Company (cc cont'd)
C.
L. Burton Plant General Manager St.
Lucie Nuclear Plant P. 0.
Box 128 Ft. Pierce, FL 34954-0128 Harold F. Reis, Esq.
Newman
& Holtzinger 1615 L Street, NW Washington, D.
C.
20036 John T. Butler, Esq.
Steel, Hector and Davis 400 Southeast Financial Center Miami, FL 33131-2398 Bill Passetti Office of Radiation Control
'epartment of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 Jack Shreve Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Hadison Avenue, Room 812 Tallahassee, FL 32399-1400 Joe Hyers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Thomas R. L. Kindred County Administrator St. Lucie County 2300 Virginia Avenue Ft; Pierce, FL 34982 DEC 29 l993 b..:
Charles B. Brinkman Washington Nuclear Operations ABB Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 3300 Rockville, MD 20852 (See page 3)
Florida Power and Light Company bcc:
K. Landis, RII J. Norris, NRR NRC Resident Inspector U.S. Nuclear Regulatory Comm.
7585 South Highway AIA Jensen Beach, FL 34957-2010 OEC 29 1993 RI 'P R
in:tj 12/~+93 R
.RP L
dis 12/~s/93
t t
II