IR 05000335/1993300

From kanterella
Jump to navigation Jump to search
Forwards Requalification Exam Rept 50-335/93-300 Conducted During Wk of 930118.Simulator Fidelity Rept,Written Exam Questions & Answer Keys Also Encl
ML17227A724
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/02/1993
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17227A725 List:
References
NUDOCS 9302160153
Download: ML17227A724 (4)


Text

February 2, 1993 Florida Power and Light Company ATTN:

Mr. J.

H. Goldberg President

- Nuclear P. 0.

Box 14000 Juno Beach, FL 33408-0420 Gentlemen:

SUBJECT'T.

LUCIE NUCLEAR PLANT REOUALIFICATION EXAMINATION REPORT NO. 50-335/93-300 This refers to the Nuclear Regulatory Commission (NRC) administered requal-ification retake examinations led by James H.

Moorman during the week of January 18, 1993.

These examinations were administered to employees of your company who currently hold licenses to operate the St. Lucie Nuclear Plant.

At the conclusion of these examinations, the examination questions and preliminary findings were discussed with those members of your staff identified in the Examination Report, Enclosure l.

Since these exams were administered to operators who had failed previously administered requalification examinations, an evaluation of the St. Lucie licensed operator requalification program was not conducted.

A Simulator Fidelity Report is provided as Enclosure 2.

A copy of the written examination questions and answer keys is included in this report as Enclosure 3.

In accordance with 2.790 of the Commission's regulations, a copy of this letter and the enclosures will.be placed in the NRC Public Document Room.

Should you have any questions concerning this examination, please contact us.

Sincerely, (Original signed by T. A. Peebles)

Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety Enclosures:

l.

Examination Report 50-335/93-300 2.

Simulator Fidelity Report 3.

Written Examinations and Answer Keys (Document Control Desk Only)

(cc w/encls 1 and 2 - see page 2)

9302160153 930202 PDR ADOCK 05000335 PDR

Florida Power

& Light Co.

February 2, 1993 cc w/encls 1 and 2:

D. A. Sager Site Vice President St.

Lucie Nuclear Plant P. 0.

Box 128 Ft. Pierce, FL 34954-0128 R.

E. Grazio, Director Nuclear Licensing Florida Power and Light Company P. 0.

Box 14000 Juno Beach, FL 33408-0420 G. J.

Boissy Plant General Manager St.

Lucie Nuclear Plant P. 0.

Box 128 Ft. Pierce, FL 34954-0128 Harold F. Reis, Esq.

Newman II Holtzinger 1615 L Street, NW Washington, D.

C.

20036 John T. Butler, Esq.

Steel, Hector and Davis 400 Southeast Financial Center Miami, FL 33131-2398 Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, FL 32301 (cc w/encls cont'd

- see page 3)

Florida Power 5, Light Co.

February 2, 1993 cc w/encls 1 and 2:

Jack Shreve Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Madison Avenue, Room 812 Tallahassee, FL 32399-1400 Robert G. Nave, Director Emergency Management Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 James V. Chisholm County Administrator St.

Lucie County 2300 Virginia Avenue Fort Pierce, FL 34982 Charles B. Brinkman Washington Nuclear Operations ABB Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Pat Fincher Training Superintendent St.

Lucie Nuclear Plant P. 0.

Box 128 Ft. Pierce, FL 33954 bcc w/encls 1 and 2:

J. Norris, NRR A. Gibson, DRS K. Landis, DRP M. Ernstes, DRS J.

Moorman, DRS Operator Licensing Branch, NRR U.S. Nuclear Regulatory Commission ATTN:

Mr. S. Elrod, St. Lucie Senior Resident Inspector 7585 South Highway AIA Jensen Beach, FL 33457 (bcc w/encls cont'd

- see page 4)

Florida Power

& Light Co.

February 2, 1993 bcc w/encls 1, 2, and 3:

Document Control Desk bcc w/o encls:

IMS, RII RII:

R RI I:DRS JMo rm

jm/sd MErnstes 01/~,

~o l /93 doc <name:

g: $1 agstluci egr300rpt. jhm RII:

KL is OP ( /93 RI I:DR T

les Og/~/93