IR 05000331/1990021
| ML20062G902 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 11/21/1990 |
| From: | Creed J, Kniceley J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML20062G895 | List: |
| References | |
| 50-331-90-21, NUDOCS 9012030071 | |
| Download: ML20062G902 (1) | |
Text
_ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _.
'
!
i
'
N',..
U.S. NUCLEAR REGULATORY COMMISSION
'
REGION II:
!
Report No. 50-331/90021(DRSS)
i License No. DPR-49
,
f Licensee:
Iowa Electric Light-and Power Company P.O. Box 351 Cedar Rapids IA 52406 i
Inspection At: Duane Arnold Energy Center, Palo, Iowa Inspection Conducted: October 29 through November 8, 1990
'*
N'
Inspector:
QW 4 h
'
U a es R. Kniceley Date Physical Security Inspector
,
.
Approved By: $%g/
n
/
'
dames R.; Creed, Chief Date
Safeguards Section Inspection Summary
,
. Inspection on October 29 through November 8, 1990 (Repott No. 50-331/90021(DRSS))
Areas Inspected:~koutine, unannounced physical security inspection involving:
~
Management Support and Effectiveness; Protected and Vital Area Barriers, Detection and Assessment; Protected and Vital Area Access Controls; Compensatory Measures; Personnel Training and Qualifications and review of previous inspection findings. A management meeting was held on November 8, 1990 to discuss.the result of a recent inspection.
.
_Re sult s:.The licensee was found'to be in compliance with NRC requirements in the areas examined.
Four previously identified items were reviewed and closed.-
The licensee's protected area alarm system, barriers, and CCTV upgrade projects were completed.
Inspection results.showed these systems to he adequately installed and effectively utilizeo to meet regulatoiy requirements.
In addition, an individual.was hired to augment security training, and a shift
. lieutenant was assigned Fitness-For-Duty adrainistrative responsibilities to-
,
assist security management.
The licensee's performance meets regulatory requirements and the security-program is adequately being implemented and managed.
L
Encloc.ure contains SAFEGUARDS INFCTO!ATION 9o11 4 P n Separation tisis
- gh20A?$871cx c5049$2 P8N h NeontrolleJ O
I