IR 05000331/1985031

From kanterella
Jump to navigation Jump to search
Physical Security Insp Rept 50-331/85-31 on 851021-24. Violation Noted But Met 10CFR,Part 2,App C,Section VA Criteria as Licensee Identified Item.No Notice of Violation Issued.Details Withheld (Ref 10CFR73.21)
ML20136F172
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 11/19/1985
From: Christoffer G, Creed J, Madeda T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20136F165 List:
References
50-331-85-31, NUDOCS 8511220054
Download: ML20136F172 (2)


Text

. . .

, e U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-331/85031(DRSS)

Docket No. 50-331 License No. DPR-49 Licensee: Iowa Electric Light and Power Company Post Office Box 351 Cedar Rapids, IA 52406 Facility Name: Duane Arnold Energy Center Inspection At: Duane Arnold Energy Center, Palo, IA Inspection Conducted: October 21-24, 1985 Date of Last Physical Security Inspection: June 24-27, 1985 Type of Inspection: Unannounced Physical Security Inspection Inspectors: .h " /Y8f

%$.)M.Christoffer Date y P6ysical Security Inspector QMuB J. Madeda a/n4r Date ysical Security Inspector Approved By: [ /fk Date y.R. Creed, Chief-safeguards Section Inspection Summary Inspection on October 21-24, 1985 (Report No. 50-331/85031(DRSS))

. Areas Inspected: Included a review and followup of Unresolved Items; Management Effectiveness; Security Organization; Security Program Audit; Records and Reports; Testing and Maintenance; Physical Barriers - Protected and Vital Areas; Assessment Aids; Access Control - Personnel, Packages and Vehicles; Communications; Personnel Training and Qualifications - General Requirements and Safeguards Contingency Plan Implementation Review. The inspection involved 54 inspector-hours by two NRC inspectors. The inspection began during the dayshif Enclosure contains SAFEGUARDS ItiFORttATIO!

F511220054 e51119 Upon separation this PDR ADOCK 05000331 page is Decontrolled O PDR

. _

_ _ - _ . _ . __ -. - -

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ - _ - _ _ _ _

, O Results: One violation was noted during the inspection. The violation met the criteria in 10 CFR Part 2, Appendix C, Section V.A. as a licensee identified item. Therefore, a Notice of Violation was not issue Testing and Maintenance - Failure to conduct maintenance in a timely manne (Details - UNCLASSIFIED )

l Lt.cirure cor.tains UJEGUAES I;!FactATIC.'!

Upon separation this paga is Decontrolled 2