IR 05000331/1985018
| ML20129D905 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 07/11/1985 |
| From: | Creed J, Kniceley J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML20129D886 | List: |
| References | |
| 50-331-85-18, NUDOCS 8507160681 | |
| Download: ML20129D905 (1) | |
Text
f~
m a
a i
U.S. NUCLEAR REGULATORY COMMISS!0N
REGION III
Report No. 50-331/85018(DRSS)
Docket No. 50-331 License No. DPR-49 Li:ensee:
Iowa Electric Light and Power Company Post Office Box 351 Cedar Rapids, IA 52406 Facility Name:
Duane Arnold Energy Center Inspection At:
Duane Arnold Energy Center, Palo, IA Inspection Conducted: June 24-27, 1983 Date of Last Physical Security Inspection:
March 5-8, 1985 Type of Inspection:
Unannounced Physical Security Inspection Inspector:
kG h
[
Y
,
/
Date U. R. Kniceley
'
Physical Security Inspector Approved By: h h
8 J/. j1. Creed, Chief Date SWeguards Section Inspection Summary Inspection on June 24-27, 1985 (Report No. 50-331/85018(DRSS))
Areas Inspected:
Included a review and followup of Unresolved-Items; Management Effectiveness; Security Organiz3 tion; P.ecords and Reports; Locks, Keys and Combinations; Security System Power Supply; Lighting; Compensatory Measures; Assessment Aids; Access Control - Personnel; Access Control -
Vehicles; and Communication.
fhe inspection involved 31 inspector-hours by one NRC inspector.
The inspection began during the day shift.
Results:
The licensee was found to be in compliance with NRC requirements within the areas examined during this inspection.
(Details - UNCLASSIFIED )
8507160681 850712 PDR ADOCK 05000331
PDR:
t; closure contains Upon separation this p?ge is Decontrolled