IR 05000331/1985018

From kanterella
Jump to navigation Jump to search
Physical Security Insp Rept 50-331/85-18 on 850624-27.No Noncompliance Noted.Major Areas Inspected:Unresolved Items, Mgt Effectiveness,Security Organization & Records & Repts. Details Withheld (Ref 10CFR73.21)
ML20129D905
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 07/11/1985
From: Creed J, Kniceley J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20129D886 List:
References
50-331-85-18, NUDOCS 8507160681
Download: ML20129D905 (1)


Text

m f~

a a

i U.S. NUCLEAR REGULATORY COMMISS!0N

REGION III

Report No. 50-331/85018(DRSS)

Docket No. 50-331 License No. DPR-49 Li:ensee: Iowa Electric Light and Power Company Post Office Box 351 Cedar Rapids, IA 52406 Facility Name: Duane Arnold Energy Center Inspection At: Duane Arnold Energy Center, Palo, IA Inspection Conducted: June 24-27, 1983 Date of Last Physical Security Inspection: March 5-8, 1985 Type of Inspection: Unannounced Physical Security Inspection Inspector: ,

U. R. Kniceley kG

'

h/

[

Date Y

Physical Security Inspector Approved By: h h J/. j1. Creed, Chief

Date

SWeguards Section Inspection Summary Inspection on June 24-27, 1985 (Report No. 50-331/85018(DRSS))

Areas Inspected: Included a review and followup of Unresolved-Items; Management Effectiveness; Security Organiz3 tion; P.ecords and Reports; Locks, Keys and Combinations; Security System Power Supply; Lighting; Compensatory Measures; Assessment Aids; Access Control - Personnel; Access Control -

Vehicles; and Communication. fhe inspection involved 31 inspector-hours by one NRC inspector. The inspection began during the day shif Results: The licensee was found to be in compliance with NRC requirements within the areas examined during this inspectio (Details - UNCLASSIFIED )

8507160681 850712 PDR ADOCK 05000331 0 PDR: t; closure contains Upon separation this p?ge is Decontrolled