IR 05000331/1983001

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-331/83-01 on 830426-0625.No Noncompliance Noted
ML20024D434
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 07/18/1983
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Leslie Liu
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML20024D435 List:
References
NUDOCS 8308050023
Download: ML20024D434 (2)


Text

pr-

'

.

.

JUL 181983 Docket No. 50-331 Iowa Electric Light and Power Company ATTN:

Mr. Lee Liu President and Chief Executive Officer IE Towers P. O. Box 351 Cedar Rapids, IA 52406 Gentlemen:

This refers to the routine safety inspection conducted by Mr. L. S. Clardy of this office on April 26 through June 25, 1983, of activities at the Duane Arnold Energy Center authorized by NRC Operating License No. DPR-49 and to the discussion of our findings with Mr. D. Mineck at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during the course of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the NRC Public Document Room unless you notify this office, by telephone, within ten days of the date of this letter and submit written application to withhold information contained therein within thirty days of the date of this letter.

Such application must be consistent with the re-quirements of 2.790(b)(1).

If we do not hear from you in this regard within the specified periods noted above, a copy of this letter and the enclosed inspection report will be placed in the Public Document Room.

Ill l

8308050023 830718 p,/

PDR ADOCK 05000331 G

PDR

. - _

-

_

.

.

..

.

...

-

-

.

.

s Iowa Electric Light and

JUL 181983 Power Company We will gladly discuss any questions you have concerning this inspection.

Sincerely,

" Original signed by W. D. Shafer" W. D. Shafer, Chief Projects Branch 2 Enclosure:

Inspection Report

No. 50-331/83-07(DPRP)

,

cc w/ encl:

D. Mineck, Plant Superintendent

Nuclear

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Thomas Houvenagle, Iowa

,

Commerce Commission

.

-

i

f

J

l

!

,

i

RIII

RIII

kh(0./2

dh

Walker $/

d

Clardy/db

07/13/83

g

.

.

..

.. -.. -. -.

-. _... _ _ _.

-

.

.

..

. _

_ _.. _,. _ _. - - - -.