U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-331/83-12(DRSMP)
Docket No. 50-331 License No. DPR-49 Safeguards Group IV Licensee:
Iowa Electric Light and Power Company Post Office Box 351 Cedar Rapids, IA 52406 Facility Name: Duane Arnold Energy Center Inspection'At: Duane Arnold Energy Centet, Palo, IA Inspection Conducted: June 27 through July 1, 1983 Date of Last Physical Security Inspection: December 6-10, 1982 Type of Inspection: Routine, Unannounced Physical Protection Inspectors:
e 7-Md3 s
s
,
G. L. Pirtle /
/
Date Physical Protection Specialist
.
]-15~53
.
M vn B. W. Stapleton /
Date Physical Protection Specialist
. Approved By:
9 d-kcA.<
}N J. R. Creed, CDJefV Date Safeguards Section Inspection Summary Inspection on June 27, through July 1, 1983 (Report No. 50-331/83-12(DRMSP))
Areas Inspected:
Included a review of Security Plan and Implementing Pro-cedures; Security Organization - Management, Personnel, and Response; Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys, and Combinations; Physical Barriers - Protected and Vital Areas; Security System Power Supply; Lighting; Assessment Aids; Access Control - Personnel, Packages, and Vehicles; Detection Aids - Protected and Vital Areas; Alarm Stations; Communications; General Requirements - Training and Qualification Plan; Training and Qualification Plan Additional Requirements for Power Reactors; Physical Protection of Safeguards Information, Independent Inspection Effort; and Follow-up on Previous Items. The inspection involved 83 inspector-hours Enclosure Centalas 8308030395 830728 Upon Separation This PDR ADOCK 05000311 o
PDR Page is Decontrolled
.-
.
-
-
-
-
u.
.
e by two NRC inspectors. Nineteen of the 83 inspection-hours were accomplished during off-shift periods. The inspection began during the day shift.
Results: The ifcensee.was found to be in compliance with NRC requirements within the areas examined, except as noted below:
.
Alarm Stations: A security computer safeguards capability required by the security plan could ha circumvented.
All previous items of noncompliance, unresolved issues, and items of concern were closed. Two unresolved issues were noted during this inspection. They will be forwarded to HQ NRC for resolution. Several observations were noted which did not constitute noncompliance with the security plan. The licensee's actions were responsive to the observations.