Forwards Insp Repts 50-329/73-10 & 50-330/73-10 on 731106-08,15,20 & 21.Noncompliance Noted
ML19329F638
Person / Time
Site: Midland
Issue date: 12/17/1973
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML17198A089 List:
References
NUDOCS 8007070422
Download: ML19329F638 (2)


Text

. - - -

-._ _ _

_ _ _ _

_ _ _ _

_ _ _ _

.__ - _ - -. _ _ _

__ _ _ _ _ - _ _ _

UNITED STATES

..'

e5 ATOMIC ENERGY COMMISSION

,

{r /

gg DIRECTORATE OF REGULATORY OPERATIONS

/

REGION lif o%rts o' "p 799 ROOSEVELT ROAD TELEPHONE GLEN ELLYN, ILLINOIS 60137 (312)828-2660 DEC 17 1973 Consumers Power Company Docket No. 50-329 ATTN Mr. Stephen H. Howell Docket No. 50-330 Vice President 1945 Parnall Road Jackson, Michigan 49201 Gentlemen This letter refers to the inspections conducted by Directorate of Regulatory Operations, Region III representatives on November 6-8,15, and 20-21,1973, relative to the Midland Plant Units 1 and 2, authorized by AEC Construction Permits No. CPPR-81 and CPPR-82. This also refers to the telephone discussions held with you and Mr. Kessler on November 9,1973, and to the meeting held with you and other members of your staff at the conclusion of the inspection on November 21, 1973.

Areas examined during the inspection are identified in the enclosed inspection report. Within these areas, the inspection consisted of selective examination of procedures and records, interviews with plant personnel, and observations by the inspectors. A copy of the enclosed inspection report was provided to Mr. H. R. Reis, Consumers Power Company's consultant lawyer, on December 14, 1973. At the same time, a copy of the report was mailed to Mr. Myron M. Cherry.

During this inspection, it was determined that certain of the activities

'

under your Construction Permit appear to be in violation of AEC regulatf.ons, the Midland Plant Preliminary Safety Analysis Report, and certain Bechtel Corporation specifications. The apparent violations and references to the pertinent requirements are listed under Enforcement Action in the Summary of Pindings Section of the enclosed inspection report.

In view of the circumstances associated with these violations and the subse-quant issuance of the Show Cause Order by the Director of Regulation, on December 3, 1973, this report has been referred to our Regulatory Operations Headquarters staff for further review, evaluation, and possible action. Tou will be informed of the results of this review.

)

l h

80 07070 h2

.

- _ _ _

__

_ - _ _ - _ _

__

.

..

'

.

.

,

Consumers Power Company-2-DEC 17 1973 As discussed with Mr. Keeley by Mr. Vetter of my staff, it is my understanding that Consumers Power Company has waived their review of the report for pro-prietary information and that this waiver vill be confirmed by you in writing.

Accordingly, a copy of the enclosed report has been placed in the AEC's Public Document Poom.

No reply to this latter is necessary; however, should you have any questions concerning this inspection, we will be glad to discuss them with you.

Sincerely yours,

.

Ja:nes C. Kappler

-

Regional Director

.

Enclosure RO Inspection Rpt No. 050-329/73-10 and No. 050-330/73-10 cc Mr. A. H. Aymond, President and Chairman of the Board bec: RO Chief, FS&EB RO:HQ (4)

Licensing (4)