IR 05000329/1973005

From kanterella
Jump to navigation Jump to search
Insp Repts 50-329/73-05 & 50-330/73-05 on 730626-28.No Noncompliance Noted.Major Areas Inspected:Restoration & Requalification of Site Stored Components,Rebar Tie Wire Review, & Soil Analysis & Wire Sampling Program
ML19331A396
Person / Time
Site: Midland
Issue date: 07/16/1973
From: Erb C, Rohrbacher R, Vetter W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19331A395 List:
References
50-329-73-05, 50-329-73-5, NUDOCS 8007160956
Download: ML19331A396 (14)


Text

O

.~

~

-

'

..

.

.

n

'

V U. S. ATOMIC ENERGY COMMISSION DIRECTORATE OF REGULATORY OPERATIONS

REGION III

Report of Construction Inspection RO Inspection Report No. 050-329/73-05 RO Inspection Report No. 050-330/73-05 Licensee: Consumers Power Company 212 W. Michigan Avenue Jackson, Michigan 49201 Midisnd Plant, Units 1 and 2 License No. CPPR-61 Midland, Michigan License No. CPPR-82 Category: A Type of Licensee:

PWR (B&W) Unit 1: 650 Mwe, Unit 2: 818 Mwe Type of Inspection:

Special, Announced (Rectart of construction)

j Date of Inspection:

June 26-28, 1973

Date of Previous Inspection: June 14-15, 1973 w

"

-

Principal Inspector:

R. A. Rohrbacher 7-/3-73 (Date)

Ged&

'[!/ S 7J Accompanying Inspector:

C. M. Erb f(Datf Other Accompany'ng Personnel: None b / d - 7.2 Reviewed By:

W. E. Vetter, Chief a

Reactor Construction Branch (Date)

- s 80.07160

$[

-,-s

,

,_f-,

-

. -..

,.,,

_ _

,,, _ _, -..,,

-,,-..,.%__m.,-7_,.,_

.g e,. _. ~ _

,...,,-,.r,-

3,,,,

.-,

w-.

,-

_

.

-.,. -

~~-

.

..

.

.

O SUPJnARY OF FINDINGS'

Enforcement Action A.

Violations No violations of AEC requirements were identified.

B.

Safety Matters No significant safety items were identified.

Licensee Action on Previously Identified Enforcement Matters No previously identified enforcement matter-remained unresolved at the time of this inspection.

Design Changes No design changes were identified.

Unusual Occurrences ()

No unusual occurrences were identified.

Other Significar.t Findings i

A.

Current Findings 1.

Facility Status

,

The licensee estimated current project status as follows.

Activity

% Completion, Engineering 30-35%

Site construction 1-2%

2.

Construction Work to be Performed During Period Ending September 30, 1973 a.

Continue removal of temporary enclosures, removal of straw, and general site clean-up to allow construction activities to continue.

b.

Continue clean-up and restoration, inspection of existing materials and complete approximately during the latter part g

of July 1973.

-.2-

.

-r-e-.

g-w

-*

,,,.---e- + - -

ys, a-


,-e

--,-vm<e-,-,.

w vw -.-

ww,

,.-

,--e.w..----%-+----v,- -,

,--wy.-w----ww-w------- - - - -...- - -

-r-w

--- - - - - -- - -+

_

-

.-

.

.

-

.

.

-

.($

\\--

c.

Batch plant operations to include check out and testing of equipment, calibrating of scales, and other weighing and measuring devices - also to include synchronizing men-o-tizers and weights for print-outs.

d.

Plant is expected to be ready for operation by mid-July. Mix designs and testing of materials will be accomplished after Pittsburgh Testing Lab. arrives at the site on or about

,-

July 9, 1973 for interim testing.

All trucks presently at

'

the site are expected to be checked out and in proper condition by mid-July 1973.

-

e.

Waterproof membrane will be cleaned up, repaired or replaced as required.

It is anticipated that this will take place in July.

f.

Reactor Building No. 2 concrete activities during the reporting period will include form erection, rebar and e= bedded metal installation and placing concrete in the tendon access gallery and base slab.

g.

Reactor Building No. 1 concrete activities for the reporting period will include form erection, embedded metal and rebar installation and placing concrete in the base slab.

h.

Auxiliary Building concrete activities will include form erection, e= bedded =etal and rebar installation and concrete i

,

placement frem line D to line G, elevation 568' to elevation 573'.

i. Reactor Building No. 1 liner plate activities will include initiation and pursuance of erection of jigs and fabrication of the first lift from elevation 593' to elevation 673'.

k.

The subcontract earthwork activities will include recondition-ing of the NE dike, preparation and backfill for the laydown

,

area and preliminary work on the access road modifications.

'

3.

Licensee-Contractor QA/QC Personnel The following quality assurance, quality control and quality-related personnel are expected to be at the Midland construction site during the period from July 1, 1973, to Septe=ber 30, 1973.

a.

Consumers Power Company C. Q. Hills, Quality Assurance Ad=inistrator R. E. Whitaker, Quality Assurance Engineer 3-

' V

-

.

a

- -.

-,

, -,

n

,- -

r

- -. - - - -

-,,.

e wm--

-

-- - -, - --- --

~ -.

- - - - - - -

.

-

_..

.

%

.

s

.

.

.

/-

-

(ns -)

W. E. Kessler, Project Manager s

M. P. Hanson, Project Engineer R. L. Teuteberg, Assistant Project Engineer T. C. Cooke, Project Superintendent B. H. Peck, Field Supervisor (Mechanical)

D. R. Keating, Field Engineer (Mechanical)

J. L. Corley, Civil Supervisor b.

Bechtel Corporation E. E. Felton, Project Superintendent J. I. Dotson, Project Quality Assurance Engineer H. Lilligh, Quality Assurance Engineer F. W. Joyce, Quality Control Supervisor C. E. Kinney, Project Field Quality Control Engineer T. C. Valenzano, Project Field Engineer R. R. Grote, Lead Field Civil Engineer K. F. Pulito, Lead Field Mechanical Zngineer J. P. Newcomb, Senior Engineer H. L. Hondorp, Engineer (Metallurgist)

,

c.

' Changes

/~(

G. L. Richardson is to be assigned to the Midland Project prior to September 30, 1973, as a Quality Assurance Engineer for the k.

Bechtel Corporation.

m I

4.

Nonconformances Consumers Power Company did not issue any nonconfor=ance reports during the month of June, 1973.

.

During the inspection, a need for issuance of nonconformance reports was not in evidence, and the licensee stated that no nonconformance reports were required or issued.

5.

Present Activities t

Although new construction had not begun during the current inspec-tion, about 50 people are at the site doing preconstruction and restoration work in preparation for the restart of construction.

The work in progress included the removal of protective enclosures and materials from existing concrete slabs and structures, site clean-up, preliminary non-Class I earthwork, renovation and testing activities at the concrete batch plant, inspection of construction work completed prior to construction shutdown in December of 1970,

and the inspection of =aterials and components stored on, or near, the construction site during the construction shut-down period.

Ou-4-

,

.

.-.

-

-

-

,...

-

-

..

--

-.

.

-

..

..

.

.

.

k/

Both Consumers Power Cocpany (CP) and the Bechtel Corporation s

(Bechtel) have established construction offices a; the site.

.

B.

Unresolved Matters 1.

Restoration and_Pequalification of Site Stored Components Carbon steel components stored outside at the site have rusted to varying degrees. Work and quality control procedures are being developed by CP to verify that all components used will meet applicable requirements. This matter re=ains open pending review of completed procedures and an evaluation of procedure implementation.

(Paragraph 1)

2.

Evaluation of Rebar Tie Wire Significant deterioration of some tie wire holding exposed reinforcing steel in place 1s such that the required support function during concrete placement is subject to question.

Inspection of the wire and serviceability evaluation are planned by the licensee.

This matter will be reviewed during a sub-sequent inspection.

(Paragraph 2)

C.

Status of Previously Reported Unresolved Matters

\\,

Bichtel Corporation Organization for the Midland Project (R0 Inspec-

' tion Reports No. 050-329/73-02 and 050-330/72-02)

i In response to a request from RO:III during the referenced inspection, CP provided RO:III with a modified Bechtel organization chart.

After a review of this chart (which was received by RO:III on thy 7,1973),

and discussions with CP and Bechtel personnel during the current inspection, it was not clear to RO:III that all requirements of 10 CFR 50, Appendix B, Criterion I, were met.

This matter remains open pending further clarification and/or changes.

(Paragraph 5)

Management Interview A.

The following persons attended the management interview at the con-i clusion of the inspection:

Consumers Power Company W. E. Kessler, Project Manager

.

C. Q. Hills, Quality Assurance Administrator T. C. Cooke, Project Superintendent R. E. Whitaker, Field Quality Assurance Engineer i

~

~

.

'

-

-

.

-

.

.

.

-.

.. -

.

-

-

...

.

_.. _

-

.

.

--

.

... -

- _... _ -

. -..

L

.

'

Bechtel Corporation *

E. E. Felton, Project Superintendent J. I. Dotson, Project-Quality Assurance C. E. Kinney, Project Field Quality Control Engineer

  • Part time B.

Matters discussed and comments, on the part of management personnel, were as follows:

1.

The present condition of the concrete structures placed prior to the cessation of construction activities in 1970 was discusaed.

The inspector stated that a visual inspection of placed concrete, currently exposed (some concrete is yet to be uncovered) for the i

Auxiliary Building and Reactor Buildings No. 1 and 2, was made and the results of this inspection, and conclusions on the part i

of the inspectors, were consistent with the results and conclusions

'

contained in a Bechtel report on this subject. The inspector further stated that the concrete observed appeared to be in good condition and that additional existing concrete would be inspected when form removal and cleanup is completed.

CP stated that

,

(

specit '.ists from Bech tel will be used on a continuing basis to

,

examine and evaluate aoncrete and rebar.

In response to a question concerning severe rusting of rebar

.

tie wire, a representative of CP said that the tie wire would be I

inspected and that continued use of the wire would depend upon the results of inspection and evaluation.

2.

Procedures to requalify rusted carbon steel components (plate,

pipe, rebar, penetration, etc.) were discussed.

CP stated that

plans ar being made to requalify these components. The' liner plates are to be transported to a jig to facilitate cleaning 'and dimens onal checks. The requalifying plan includes QC inspection

.

prior to use or installation and, unless all applicable requirements

-

l are met, the plates are to be classified as nonconformin6 material and processed in accordance with 10 CFR Part 50, Appendix B.

,

'

3.

The CP program covering soil analysis and stored material wipe

',

sampling was discussed.

CP stated that this program was started l

in 1970 but halted during the construction shutdown. CP further stated that this program-would be reinitiated, and that full evaluation of ~ results would be performed and documented.

4.

In response to a request, CP indicated that copies of all repe-ts

.

related to the results of work performed to determine the affect of the environment on meterials, components and structures during the construction delay would be sent to RO:III.

n

.

m SS

-

,

,,.~,_m

.,.,,-.,-,..,_,._,.,,._....~._m_.,._

,,_,4,..

._,.___.,,y

.-,.,-r~_m,-m.m

,_,..__._,...-..,

-..,- -,

,_

_ __

_.

..

O

\\~ -

5.

The current Bechtel organization for the Midland project was discussed with CP and Bechtel~ representatives.

Following discussion, the inspector stated that he more fully understood the Bechtel organization chart but that it was not clear that all requirements of 10 CFR 50, Appendix B, Criterion I, were being met.

Additional discussions on this matter are planned.

(Paragraph 5)

6.

In response to a question regarding concrete batch plant status, CP stated that Champion, Inc., personnel were reactivating and requalifying the plant, and that calibration of measaring equipment and evaluation of previously stored materials (such as fly ash) for suitability were in progress.

.

i

-

-

!

Os-

_ 7-m

.

r w

--,

wm

--, - - -

e-.-

v.--,

y---e=---ew=,-+

-

,-+w,.---

%---=---we.----


w-.

  • e.-e,-

-ew,--**--w- -, - -,4e.,w--

--e.-----e

,

e---

<-+-,.-a,.-,-----

i

_n.,

s_...

.

w.

-

-

l O(~,/

REPORT DETAILS Persons Contacted The following persons, in addition to individuals listed under the Management Interview Section of this report, were contacted during the inspection.

Consumers Power Company B. H. Peck, Field Supervisor (Mechanical)

Champion, Inc.

P. E. Schmansky, General Superintendent L. P. McConnell, Electrical and Safety Engineer Bechtel Corporation H. L. Hondorp, Engineer (Metallurgist)

R. L. Mcdonald, Senior Corrosion Engineer

,

Results of Inspection (-

.

(s,)

1.

Restoration and Requalification of Site Stored Components

,

Carbon steel construction materials and components stored outside at the site have rusted to varying degrees.

Extensive rusting was in evidenc.e on surfaces where water had collected. The rust appears to be fairly uniform on the surface with no evidence of severe pitting. The licensee has arranged for specialists from Bechtel to inspect these components and to determine whether or not the components can be restored within the parameters of the original specification requirements.

The following Class I (Q-listed) compon nts were visually examined by the RO inspectors during the inspection of yard storage areas.

a.

Curved wall plates (containment liner) with attached reinforcing bars.

'

b.

Containment penetration components.

c.

Polar crane trolley.

d.

Polar crane wall support steel and connecting track beams.

!

O-8-

,

(v)

'

l l

l -

.

.

-

.

.

.

- -

.

-

. - - -.

- -

-.

-

-

. - -, - - _ - -

-

.

.. - -

.....

~

.

...

.

,f s

-

\\' '/

Surfaces of the above co=ponents to be installed within the contain=ent building, with the exceptica of the outside surface of the liner plate, care coated with a protective coating (Carbozine 11 or similar coating)

prior to shipnent to the site. This coating prevented, or greatly inhibited, rusting of the coated surfaces of these co=ponents.

Approxi=ately 24 stainless steel pipe sections (2",

4", and 24" in diameter) were visually inspected in a warehouse. The pipe sections were free of surface ~ dirt, end caps were in place, identification = arks visible, and the pipe was covered with plastic sheets.

A representative of the licensee stated that all Q-listed =aterials and co=ponents stored at the site during the construction shutdown period are to be inspected, restored, and requalified prior to use <

installation.

The develop =ent of procedures to do the above work is in progress.

2.

Evaluation of Rebar Tie Wire The inspector noted that the tie wire used to hold the reinforcing steel bars in place contained varying amounts of surface rust. Rather severe rusting on some of these wires indicated possible weakness due to loss of material. A representative of the licensee stated that the subject wire

'

would be exa=ined and tested, as ne_eded, to assure that, during construction activities including concrete placement, the required in=obility of rebar f-ss (

)

would be maintained.

\\/

3. ' Soil Analysis and Wire Sampling Progra I

CP initiated the subject sa=pling progra= early in 1970. Data were collected in the Spring of 1970 and in the Su==er of 1971. The intent of this progrr.= vas to identify the existence, and amounts of, chloride and os.aer airborne contaminants, which =ay have co=e into contact with stored =etallic co=ponents during the construction shutdown.

CP stated that this progra= vould be brought up to date in ter=s of data analysis and continuing sampling.

4.

Condition of Existing Structures and Stored Components The status of the i=plementation of the CP program to deter =ine the current quality of structures and co=ponents subject to environ = ental conditions during the construction shutdown appears in the attached Appendix A of this report.

5.

Bechtel Organization for the Midland Project Subsequent to the previous inspection (Manage =ent Meeting with CP on April 17, 1973), CP sent RO:III a modified Bechtel organization cF.

-9-v

--.

-

--.

-.

.-

._

-

- -

... -

--

. _

~~-

- - - -. -

- -

.

~

.

. -

OU for the Midland project.

Although this modified chart was a little more detailed than the previous one, it was more confusing because six types of reporting and directing responsibility lines were used.

Explanation and discussion of this chart with CP and Bechtel' personnel during the aurrent inspection provided some clarification. A Bechtel representative

.

stated that t's QA engineers do monitor and audit the work of the QC engineers. Ac ?xplanation of the QA portion of the chart was fairly clear and appe.. red to meet'the requirements of 10 CFR 50, Appendix B.

However, the chart shows the Project Field QC Engineer (to whom the QC engineers report) reporting directly to the Project Superintendent.

This Project Superintendent has cost and scheduling responsibilities.

That is, he has construction (craft) superintendents, a materials supervisor and fis1d engineers under his direction.

A represent.ative of Bechtel stated that the QC engineers inspect, check and otherbise verify correctness of work performed by others (employees of subcontractors), but they also perform the same QC function for other Bechtel subgroups that ultimately report to the same project superintendent.

Consequently, the QC engineers do not appear to be free from influence and control'of groups doing the work.

Conversely, a project superintendent who has QC engineers working for him does exercise some controlling and directing function over them.

This remains an open issue to be resolved-during the next site inspection, currently scheduled to performed on

,

July-18 - 20, 1973.

O

,

i

%

Y J

.

T 10 -

-

g N

.

.

,

, --_. -.., -,. - -. - - -,,,. -.,

.- -

-

,-

.,,,n

-,

.--,-p.,,,

--a

.-

-g,a

-.m_

-,.m.,

,,w, e.-o--

,

e r-w--

4-n - - -, -

,,

.

.. _. -.

- -.-

-

.

.-.

,

.

,-~\\

.

(_)

APPENDIX A Status of Implementation of Condition 1 of ALAB-106 1.

Identification Previously completed construction work related to nuclear safety (Q-listed)

has been identified by CP, and the listing has been grouped under the following headings: Auxiliary-Building, Reactor Building No. 1, Reactor Building No. 2, and Site Excavation and Backfill.

It was determined from a visual inspection that this listing appears to represent the actual construction completed prior to the construction shutdown in late ',970.

Materials and components (Q-listed) stored at the site since cessation of construction have been categorized by the licensee. - During the inspection of these stored Q-listed items, the inspectors determined that the listings appeared to be correct and that components were readily identified by reference to component markings.

Stainless steel piping was observed to be stored under plastic in a warehouse.

2.

Evaluation of Present Condition

.

a.

Concrete Work A report, titled " Interim Report on the Initial Examination of In-Place Materials, May 8 and 10, 1973" dated May 21, 1973, produced

,

by F. W. Joyce, Supervising Civil Specialist, Bechtel (San Francisco)

'

was reviewed.

This report included the results of a visual inspection of the exposed structural concrete of the Auxiliary Building. A drawing, which mapped visually significant cracks, was examined also.

A visual exar ation of the concrete structures and water stops included in the above report indicated that the report results and conclusions were consistent with conditions observed by the RO inspector.

- An affidavit generated by F. W. Joyce, dated June 15, 1973, regarding a June 14, 1973, inspection of concrete in the Unit 1 Tendon Access Gallery, referencing an inspection performed by Joyce, R. Grote and F Kapla (all employeee of Bechtel) was reviewed.

The results and conclusions in this affidavit were also in agreement with conditions observed and conclusions reached by the RO inspectors during the curren: inspection That is, the cracks are of the normal shrinkage

.

type and are not expected to adversely affect the structural soundness

,

i of the Unit 1 Tendon Access Gallery walls.

\\

,.

.

.

,

-

,,---sv---

r

-

-re--

-ew,--

-+-

we-=---,oe e---

w e

.-e,-------r--

w w-e

,v--,---

- -,, ~,

ne-

,

w-

,..--,.,-----v,-

,w~--,--,m-es

-,~w,,-s

_

--

..

.

.

.-

,

.

_.

.

-

_

w i

.

'

.

.

.

f N-b., Concrete Batch Plant The RO inspector observed that the concrete batch plant and concrete

.

delivery trucks were in the process of renovation, testing, and

'

requalification.

Scales and other measuring devices were being checked and recalibrated. This work was being done by Champion, Inc.,

'

personnel. The licensee stated that test mfxing is scheduled to be

'

performed in early July, 1973, and that Pittsburgh Testing Laboratory personnel will be at the site at this time to sample and test the mixes.

c.

Reinforcing Steel The licensee stated that two specialists from the Bechtel San Francisco office were presently onsite to examine reinforcing steel (exposed embedded and stored) to determine the serviceability of the steel based on a determination of corrosion and material loss.

The RO inspectors visually examined the rebar in place for the Unit 2

-

Tendon Access Gallery walls. Except for surface rusting, the rebar appeared to be sound, free of severe pitting, and adequate for use. The licensee stated that inspection and testing of this (and other) rebar, as well as rebar tie wire, would be tested to verify that all applicable re,quirements are met prior to concrete placement in this area. To Os this end, the licensee stated that the CP chief metallurgist and chief civil engineer would be at the site during the week of July 2, 1973, to examine rebar, concrete and other materials.

i d.

Earth Work

~

The licensee stated that some soil borings were made during the week of June 11, 1973, by Soils Materials and Engineering, with representa-tivas of Bechtel present, but that the results of soil analysis were not available yet.

Some preliminary earth work (not Q-listed) has been started.

e.

Containment Liner Plate Coating A report titled " Interim Report on the Initial Examination of Liner

'

Plate Coatings, May 1 and 2, 1973," dated May 18,1973, by H. L.

,

Hondorp, Engineer (Metallurgist), Bechtel, was reviewed. This report

includes the results of an inspection by Messrs. Newcomb, Grote and

,

Hondorp (all of Bechtel) and a Mr. Hinson (a Coating Specialist j

representing the Carboline Company) was reviewed in detail.- A visual examination of about 25 liner plates by RO:III inspectors during the l

current inspection provide results consistent with the results, and

- O 2-

-

1 a

,

.

..._...,.....c-

. -... -,, ~,.

.. -. - - - -.


,,....c~

_m.,,.m.c-,--n.,,-~,.

. - -. -.,,, -.

,_-._~,--,--w,

,m.e-

.

-.

....

,~

,. r

.

  • *.

.

.

.'

- s',

.

--

conclusions, contained in this report identified earlier in this paragraph; i.e, the protective coating inhibited rusting, all coated areas of the plates examined will require some surface preparation, and liner plates not examined will require examination to determine the extent of required rework.

f.

Containmer.t Liner Plate The licensee indicated that only a preliminary examination of the containment liner plates had been completed. He added that all liner plates would be thorouFhly reinspected and identified as restorable or reject.

If determined to be restorable, the plate is to be requalified on the basis of a special QC inspection.

Procedures to implement the above activity are being develeped.

g.

Other Embedded and Stored Materials and Components Components such as anchor bolts, polar crane supports, post-tensioning

-

materials, cadweld material, are to be inspected, examined and measured, as appropriate, prior to use or installation.

During the inspection of the storage areas, it was observed that

,

miscellaneous stored material and components were properly stacked off the ground and covered (if required).

,

It was further observed that new metal identification tags had been used to replace some plastic-over-paper tags which are becoming i

difficult to read.

,

e 3-

-

l l

.

w

,-

sw,

w p+

x

~

-,e-n r

,a-4e---w

---,-,-ww--,,

~r~ww-,

ew

-.+w

"em-w--

w---

er-e,

-ewww-

---,-,--,--------.,v,w-s-

,,---e-


+--r-,--.

UNITED STATES O

,.{

!.

ATOMIC ENERGY COMMISSION

.

,

DlVislON OF COMPLlANCE

MEGION lli tr$ on 799 ROOSEVELT ROAD TELEPHONC GLEN ELLYN, ILLINOIS 60137 (3:2) ase-:sao

.

050-329/73-05 A.

RO Inspection Report No.

050-330/73-05 July 16, 1973 Transmittal Dm.e

Distribution:

Distribution:

RO Chief, FS&EB RO Chief, FS&EB R0:HQ (5)

RO:HQ (4)

DR Cen*~al Files L:D/D for Fuel & Materials Regulatory Standards (3)

DR Central Files Licensing (13)

RO Files RO Files B.

RO Inquiry Report No.

Transmittal Date

.

Distribution:

Distribution:

RO Chief, FS&EB RO Chief, FS&EB RO:HQ (5)

RO:HQ DR Central Files DR "entral Files Regulatory Standards (3)

R0 Files Licensing (13)

RO Files C.

Incident Notification From:

l (Licensee & Docket No. (or License No.)

Transmittal Date

Distribution:

Distribution:

RO Chief, FS&EB RO chief, FS&EB RO:HQ (4)