IR 05000326/1984001
ML20197G678 | |
Person / Time | |
---|---|
Site: | University of California - Irvine |
Issue date: | 06/11/1984 |
From: | Ervin N, Norderhaug L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
To: | |
Shared Package | |
ML19269A246 | List: |
References | |
50-326-84-01, 50-326-84-1, NUDOCS 8406180108 | |
Download: ML20197G678 (1) | |
Similar Documents at University of California - Irvine | |
---|---|
Category:INSPECTION REPORT
MONTHYEARIR 05000326/19992011999-03-25025 March 1999
[Table view]Insp Rept 50-326/99-201 on 990223-25.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000326/19972011998-03-26026 March 1998 Insp Rept 50-326/97-201 on 971208-11.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000326/19930011993-03-23023 March 1993 Insp Rept 50-326/93-01 on 930216-26.No Violations Noted. Major Areas Inspected:Nrf Operations,Including Organization, Review & Audit,Experiments,Ro Requalification Training & Transportation Activities Emergency Preparedness Program IR 05000326/19900011990-03-0202 March 1990 Partially Withheld Insp Rept 50-326/90-01 on 900220-21 (Ref 10CFR2.790(d)).No Noncompliance Noted.Major Areas Inspected:Plans,Procedures & Reviews,Repts of Safeguards Events & Fixed Site Physical Protection of SNM IR 05000326/19890011989-09-26026 September 1989 Insp Rept 50-326/89-01 on 890828-31.Violations Noted.Major Areas Inspected:Reactor Operations,Health Physics,Emergency Planning Preparedness,Transportation Activities,Followup Items & Exit Interview ML20148B1111988-03-0303 March 1988 Insp Rept 50-326/88-01 on 880127-29.Violations Noted.Major Areas Inspected:Reactor Operations Program,Radiation Protection Program,Emergency Preparedness Program & Radioactive Matl Shipment & Receipt Program IR 05000326/19850011985-09-27027 September 1985 Insp Rept 50-326/85-01 on 850903-06.Violations Noted:Failure of Reactor Operation Committee to Conduct Quarterly Meetings & Implement Licensed Operators Requalification Program IR 05000326/20080021985-08-27027 August 1985 Insp Rept 50-346/85-13 on 850326-0802.Violation Noted: Failure to Issue Nonconformance Repts When Hanger Damage Identified & Inadequate QC & IE Bulletin 79-14 Insps Performed to Verify Hanger Installations IR 05000326/20040251985-05-30030 May 1985 Insp Repts 50-413/85-14 & 50-414/85-11 on 850326-0425. Violations Noted:Failure to Adequately Evaluate Results of Procedures & Failure to Meet Tech Spec Requirements for RHR Sys IR 05000326/19840011984-06-11011 June 1984 IE Safeguards Insp Rept 50-326/84-01 on 840319.No Violations Noted.Major Areas Inspected:General Requirements for Spent Nuclear Fuel Fixed Sites & Followup on Previous Insp Findings.Details Withheld (Ref 10CFR2.790) IR 05000326/19820021982-07-0606 July 1982 IE Safeguards Insp Rept 50-326/82-02 on 820510-0701. Noncompliance Noted:Failure to Make Verbal Rept within 1-h to NRC Operations Ctr & Submit Detailed Written Rept to NRC Regional Ofc in 5 Days.Portions Deleted IR 05000326/19820011982-04-14014 April 1982 IE Insp Rept 50-326/82-01 on 820323-24.Noncompliance Noted: Fuel Moved W/O Recording Estimate of Reactivity Effect of Adding Fuel IR 05000326/19800021980-12-0808 December 1980 IE Insp Rept 50-326/80-02 on 801029-30.Noncompliance Noted: Employees Not Instructed in Any Topics Prior to Working in Restricted Area & No Method to Insure Instruction of Workers IR 05000326/19800011980-07-0303 July 1980 IE Insp Rept 50-326/80-01 on 800519-21.Noncompliance Noted: Failure of Reactor Operations Committee to Meet & Conduct Quarterly Reviews at Required Frequency 1999-03-25 Category:NRC-GENERATED MONTHYEARIR 05000326/19992011999-03-25025 March 1999
[Table view]Insp Rept 50-326/99-201 on 990223-25.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000326/19972011998-03-26026 March 1998 Insp Rept 50-326/97-201 on 971208-11.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000326/19930011993-03-23023 March 1993 Insp Rept 50-326/93-01 on 930216-26.No Violations Noted. Major Areas Inspected:Nrf Operations,Including Organization, Review & Audit,Experiments,Ro Requalification Training & Transportation Activities Emergency Preparedness Program IR 05000326/19900011990-03-0202 March 1990 Partially Withheld Insp Rept 50-326/90-01 on 900220-21 (Ref 10CFR2.790(d)).No Noncompliance Noted.Major Areas Inspected:Plans,Procedures & Reviews,Repts of Safeguards Events & Fixed Site Physical Protection of SNM IR 05000326/19890011989-09-26026 September 1989 Insp Rept 50-326/89-01 on 890828-31.Violations Noted.Major Areas Inspected:Reactor Operations,Health Physics,Emergency Planning Preparedness,Transportation Activities,Followup Items & Exit Interview ML20148B1111988-03-0303 March 1988 Insp Rept 50-326/88-01 on 880127-29.Violations Noted.Major Areas Inspected:Reactor Operations Program,Radiation Protection Program,Emergency Preparedness Program & Radioactive Matl Shipment & Receipt Program IR 05000326/19850011985-09-27027 September 1985 Insp Rept 50-326/85-01 on 850903-06.Violations Noted:Failure of Reactor Operation Committee to Conduct Quarterly Meetings & Implement Licensed Operators Requalification Program IR 05000326/20080021985-08-27027 August 1985 Insp Rept 50-346/85-13 on 850326-0802.Violation Noted: Failure to Issue Nonconformance Repts When Hanger Damage Identified & Inadequate QC & IE Bulletin 79-14 Insps Performed to Verify Hanger Installations IR 05000326/20040251985-05-30030 May 1985 Insp Repts 50-413/85-14 & 50-414/85-11 on 850326-0425. Violations Noted:Failure to Adequately Evaluate Results of Procedures & Failure to Meet Tech Spec Requirements for RHR Sys IR 05000326/19840011984-06-11011 June 1984 IE Safeguards Insp Rept 50-326/84-01 on 840319.No Violations Noted.Major Areas Inspected:General Requirements for Spent Nuclear Fuel Fixed Sites & Followup on Previous Insp Findings.Details Withheld (Ref 10CFR2.790) IR 05000326/19820021982-07-0606 July 1982 IE Safeguards Insp Rept 50-326/82-02 on 820510-0701. Noncompliance Noted:Failure to Make Verbal Rept within 1-h to NRC Operations Ctr & Submit Detailed Written Rept to NRC Regional Ofc in 5 Days.Portions Deleted IR 05000326/19820011982-04-14014 April 1982 IE Insp Rept 50-326/82-01 on 820323-24.Noncompliance Noted: Fuel Moved W/O Recording Estimate of Reactivity Effect of Adding Fuel IR 05000326/19800021980-12-0808 December 1980 IE Insp Rept 50-326/80-02 on 801029-30.Noncompliance Noted: Employees Not Instructed in Any Topics Prior to Working in Restricted Area & No Method to Insure Instruction of Workers IR 05000326/19800011980-07-0303 July 1980 IE Insp Rept 50-326/80-01 on 800519-21.Noncompliance Noted: Failure of Reactor Operations Committee to Meet & Conduct Quarterly Reviews at Required Frequency 1999-03-25 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARIR 05000326/19992011999-03-25025 March 1999
[Table view]Insp Rept 50-326/99-201 on 990223-25.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000326/19972011998-03-26026 March 1998 Insp Rept 50-326/97-201 on 971208-11.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000326/19930011993-03-23023 March 1993 Insp Rept 50-326/93-01 on 930216-26.No Violations Noted. Major Areas Inspected:Nrf Operations,Including Organization, Review & Audit,Experiments,Ro Requalification Training & Transportation Activities Emergency Preparedness Program PNO-V-90-019, on 900417,earthquakes Measuring 4.6 on Richter Scale Measured 3 Miles West of Upland,Ca.On 900418,three Earthquakes Occurred in Northern California.No Visual Damage Occurred to Reactors in Area1990-04-18018 April 1990 PNO-V-90-019:on 900417,earthquakes Measuring 4.6 on Richter Scale Measured 3 Miles West of Upland,Ca.On 900418,three Earthquakes Occurred in Northern California.No Visual Damage Occurred to Reactors in Area IR 05000326/19900011990-03-0202 March 1990 Partially Withheld Insp Rept 50-326/90-01 on 900220-21 (Ref 10CFR2.790(d)).No Noncompliance Noted.Major Areas Inspected:Plans,Procedures & Reviews,Repts of Safeguards Events & Fixed Site Physical Protection of SNM PNO-V-90-008, on 900228,earthquake W/Richter Magnitude of 5.5 Occurred Near Upland,Ca.San Onofre Declared Unusual Event & Conducted Insp.Area Research Reactors Shut Down W/No Damage Resulting to Facilities1990-03-0101 March 1990 PNO-V-90-008:on 900228,earthquake W/Richter Magnitude of 5.5 Occurred Near Upland,Ca.San Onofre Declared Unusual Event & Conducted Insp.Area Research Reactors Shut Down W/No Damage Resulting to Facilities ML20005D6861989-11-24024 November 1989 Exam Rept 50-326/OL-89-01 on 891025-26.Exam Results:One Reactor Operator Passed Operational Exam,But Failed Written Portion ML20248D7421989-09-27027 September 1989 Notice of Violation from Insp on 890828-31.Violations Noted: Operator Monthly Maint Checklist for Sept 1988 Not Signed by Assistant Reactor Supervisor & Reactor Operations Committee Failed to Meet During Period 880819-890130 IR 05000326/19890011989-09-26026 September 1989 Insp Rept 50-326/89-01 on 890828-31.Violations Noted.Major Areas Inspected:Reactor Operations,Health Physics,Emergency Planning Preparedness,Transportation Activities,Followup Items & Exit Interview ML20148B1111988-03-0303 March 1988 Insp Rept 50-326/88-01 on 880127-29.Violations Noted.Major Areas Inspected:Reactor Operations Program,Radiation Protection Program,Emergency Preparedness Program & Radioactive Matl Shipment & Receipt Program ML20148B0931988-03-0303 March 1988 Notice of Violation from Insp on 880127-29.Violations Noted: Monthly Checklists Not Completed for Oct 1987 - Jan 1988 Period & Four Monthly Checklists Initiated or Completed from Jan 1986 & Sept 1987 Not Signed PNO-V-87-076, on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted1987-11-24024 November 1987 PNO-V-87-076:on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted PNO-V-86-041, on 860713,earthquake Measuring 5.7 on Richter Scale & Aftershocks Occurred Actuating Seismic Alarms.Insp Procedures Implemented.No Abnormal Condition Noted.Effects Also Felt at Listed Nonpower Reactors1986-07-14014 July 1986 PNO-V-86-041:on 860713,earthquake Measuring 5.7 on Richter Scale & Aftershocks Occurred Actuating Seismic Alarms.Insp Procedures Implemented.No Abnormal Condition Noted.Effects Also Felt at Listed Nonpower Reactors ML20205P2931986-05-0606 May 1986 Exam Rept 50-326/OL-86-01 on 860408-09.Exam Results:Two Reactor Operator & One Senior Reactor Operator Candidates Passed Written & Oral Exams ML20205E4221985-09-30030 September 1985 Notice of Violation from Insp on 850903-06 IR 05000326/19850011985-09-27027 September 1985 Insp Rept 50-326/85-01 on 850903-06.Violations Noted:Failure of Reactor Operation Committee to Conduct Quarterly Meetings & Implement Licensed Operators Requalification Program IR 05000326/20080021985-08-27027 August 1985 Insp Rept 50-346/85-13 on 850326-0802.Violation Noted: Failure to Issue Nonconformance Repts When Hanger Damage Identified & Inadequate QC & IE Bulletin 79-14 Insps Performed to Verify Hanger Installations IR 05000326/20040251985-05-30030 May 1985 Insp Repts 50-413/85-14 & 50-414/85-11 on 850326-0425. Violations Noted:Failure to Adequately Evaluate Results of Procedures & Failure to Meet Tech Spec Requirements for RHR Sys IR 05000326/19840011984-06-11011 June 1984 IE Safeguards Insp Rept 50-326/84-01 on 840319.No Violations Noted.Major Areas Inspected:General Requirements for Spent Nuclear Fuel Fixed Sites & Followup on Previous Insp Findings.Details Withheld (Ref 10CFR2.790) ML20058C6091982-07-0707 July 1982 Notice of Violation from Insp on 820510-0701 IR 05000326/19820021982-07-0606 July 1982 IE Safeguards Insp Rept 50-326/82-02 on 820510-0701. Noncompliance Noted:Failure to Make Verbal Rept within 1-h to NRC Operations Ctr & Submit Detailed Written Rept to NRC Regional Ofc in 5 Days.Portions Deleted ML20052B2261982-04-15015 April 1982 Notice of Violation from Insp on 820323-24 IR 05000326/19820011982-04-14014 April 1982 IE Insp Rept 50-326/82-01 on 820323-24.Noncompliance Noted: Fuel Moved W/O Recording Estimate of Reactivity Effect of Adding Fuel IR 05000326/19800021980-12-0808 December 1980 IE Insp Rept 50-326/80-02 on 801029-30.Noncompliance Noted: Employees Not Instructed in Any Topics Prior to Working in Restricted Area & No Method to Insure Instruction of Workers ML19341C4471980-12-0808 December 1980 Notice of Violation from Insp on 801029-30 IR 05000326/19800011980-07-0303 July 1980 IE Insp Rept 50-326/80-01 on 800519-21.Noncompliance Noted: Failure of Reactor Operations Committee to Meet & Conduct Quarterly Reviews at Required Frequency 1999-03-25 |
Inspection Report - University of California - Irvine - 1984001 | |
---|---|
Assessments
|
Text
~
-
.-
_
-
'$,
-
-
n
.
.
,,
..
_
The information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790.
'
,
-U.'S.
NUCLEAR REGULATORY COMMISSION
'
,~
}
Report No. 50-326/84-01 (IE-V-617)
^
Docket No. 50-326 Licensee No. R-116
.,-
,
,
-
. Licensee: ' University of California - Irvine
,
(
_
Irvine, California 92717
,,
. Nuclear Reactor Facility
-
Facility Name:
.
,
'
i j
Inspection at:
Irvine, California
'
'
^ Inspection Conducted: March 19, 1984
!
Date of Last Physical Security Inspection Visit: August 25 and 26, 1982
,,
- Typ.e of Inspection: Routine, Unannounced Physical' Security 6[///96/
Inspectors:
.
.
z-r
I.. f.'NoHielhaug,' Chief
.
.
Date Signed Safeguards and Emerge cy Preparedness Branch
,
,
Y l// h 'f 27, 0 t
a n
N. ErhinV Rdactdr Security Sp)ci'alist Date Sign'ed M/// /g4/
- Approved by:
+
-
- 2 L. R. LNoir21eVliaug',' Cliief
'j Date Signed
"
-
Safeguards and Emer 6 y Preparedness' Branch Inspection Summary
.
,
Areas Inspected: General Requirements for LSNM Fixed Sites (SNM Use and
, Storage Area Access Control, Detection Devices, Security Response) and-Follow-up on previous inspection findings. The inspection involved 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by two NRC inspectors.
Findings: No violations were identified.
,
-