IR 05000326/1999201 | 25 March 1999 | Insp Rept 50-326/99-201 on 990223-25.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support | |
IR 05000326/1997201 | 26 March 1998 | Insp Rept 50-326/97-201 on 971208-11.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support | |
ML20248D742 | 27 September 1989 | Notice of Violation from Insp on 890828-31.Violations Noted: Operator Monthly Maint Checklist for Sept 1988 Not Signed by Assistant Reactor Supervisor & Reactor Operations Committee Failed to Meet During Period 880819-890130 | |
IR 05000326/1989001 | 26 September 1989 | Insp Rept 50-326/89-01 on 890828-31.Violations Noted.Major Areas Inspected:Reactor Operations,Health Physics,Emergency Planning Preparedness,Transportation Activities,Followup Items & Exit Interview | |
ML20148B111 | 3 March 1988 | Insp Rept 50-326/88-01 on 880127-29.Violations Noted.Major Areas Inspected:Reactor Operations Program,Radiation Protection Program,Emergency Preparedness Program & Radioactive Matl Shipment & Receipt Program | |
ML20148B093 | 3 March 1988 | Notice of Violation from Insp on 880127-29.Violations Noted: Monthly Checklists Not Completed for Oct 1987 - Jan 1988 Period & Four Monthly Checklists Initiated or Completed from Jan 1986 & Sept 1987 Not Signed | |
PNO-V-87-076, on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted | 24 November 1987 | PNO-V-87-076:on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted | Earthquake |
PNO-V-86-041, on 860713,earthquake Measuring 5.7 on Richter Scale & Aftershocks Occurred Actuating Seismic Alarms.Insp Procedures Implemented.No Abnormal Condition Noted.Effects Also Felt at Listed Nonpower Reactors | 14 July 1986 | PNO-V-86-041:on 860713,earthquake Measuring 5.7 on Richter Scale & Aftershocks Occurred Actuating Seismic Alarms.Insp Procedures Implemented.No Abnormal Condition Noted.Effects Also Felt at Listed Nonpower Reactors | Earthquake |
ML20205P293 | 6 May 1986 | Exam Rept 50-326/OL-86-01 on 860408-09.Exam Results:Two Reactor Operator & One Senior Reactor Operator Candidates Passed Written & Oral Exams | Shutdown Margin Fuel cladding |
ML20205E422 | 30 September 1985 | Notice of Violation from Insp on 850903-06 | |
IR 05000326/1985001 | 27 September 1985 | Insp Rept 50-326/85-01 on 850903-06.Violations Noted:Failure of Reactor Operation Committee to Conduct Quarterly Meetings & Implement Licensed Operators Requalification Program | |
IR 05000326/2008002 | 27 August 1985 | Insp Rept 50-346/85-13 on 850326-0802.Violation Noted: Failure to Issue Nonconformance Repts When Hanger Damage Identified & Inadequate QC & IE Bulletin 79-14 Insps Performed to Verify Hanger Installations | |
IR 05000326/2004025 | 30 May 1985 | Insp Repts 50-413/85-14 & 50-414/85-11 on 850326-0425. Violations Noted:Failure to Adequately Evaluate Results of Procedures & Failure to Meet Tech Spec Requirements for RHR Sys | Boric Acid Hydrostatic |
IR 05000326/1984001 | 11 June 1984 | IE Safeguards Insp Rept 50-326/84-01 on 840319.No Violations Noted.Major Areas Inspected:General Requirements for Spent Nuclear Fuel Fixed Sites & Followup on Previous Insp Findings.Details Withheld (Ref 10CFR2.790) | |
ML20058C609 | 7 July 1982 | Notice of Violation from Insp on 820510-0701 | |
IR 05000326/1982002 | 6 July 1982 | IE Safeguards Insp Rept 50-326/82-02 on 820510-0701. Noncompliance Noted:Failure to Make Verbal Rept within 1-h to NRC Operations Ctr & Submit Detailed Written Rept to NRC Regional Ofc in 5 Days.Portions Deleted |