U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION I
Report No.
50-322/82-09 Docket No.
50-322 License No. CPPR-95 Safeguards Group IV Licensee:
Long Island Lighting Company ATTN:
Mr. M. S. Pollock Vice President-Nuclear 175 East Old Country Road Hicksville, New York 11801 Facility Name:
Shoreham Nuclear Power Station Inspection At:
Wading River, New York Inspection Conducted: April 25-29,1982 Date of last Physical Protection Inspection:
March 15-17, 1982 P gopera,tional Secur}ty Program Review Type of Inspection:
y 7h/62 Inspector:
---
R. J ailey, P 1 Fratect n Inspector
'dat6 Approvedby[
4WN
[ MO3 Anthony T. God hief, Safegu ection,
/ dat'e Technical rams Branch Inspection Summary:
Preoperational Security Program Review on April 25-29, 1982 (Report No.
50-322/82-09)
Areas Reviewed:
Preoperational inspection to evaluate progress on the proposed Physical Security Plan; Security Organization-(Personnel) and (Response); Security a$$ Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys, and
- g Combinations; Physical Barriers - (Protected Area) and (Vital Areas); Security go System Power Supply; Lighting; Assessment Aids; Access Control - (Personnel) and oo (Vehicles); Detection Aids (Protected Area) and (Vital Areas); Alarm Stations S$
and Communications. Also provided aid to the NRC Division of Nuclear Material m
Safety and Safeguards' Plant Protection Analyst in his confirmatory site evaluation.
o onco The security program review involved 38 inspector hours on site by one NRC oo region based inspector. The program review was begun during regular hours; 10 o83 inspection hours were accomplished during off shift periods.
@go'
Results:
,
The plant protection analyst completed the confirmatory site evaluation of the security program.
Several areas required additional upgrading to satisfy NRC requirements.
Region I comments concerning the proposed physical security plan were discussed and evaluated for inclusion into the plan before its final approval.