IE Safeguards Insp Rept 50-322/82-09 on 820425-29.No Noncompliance Noted.Major Areas Inspected:Physical Security Plan,Security Organization,Records & Repts,Testing & Maint, Locks,Keys & Combination.Details Withheld (Ref 10CFR73.21)
ML20062C609
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 07/16/1982
From: Bailey R, Gody A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20062C594 List:
References
50-322-82-09, 50-322-82-9, NUDOCS 8208050299
Download: ML20062C609 (1)


Text

.

,

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION I

Report No.

50-322/82-09 Docket No.

50-322 License No. CPPR-95 Safeguards Group IV Licensee:

Long Island Lighting Company ATTN:

Mr. M. S. Pollock Vice President-Nuclear 175 East Old Country Road Hicksville, New York 11801 Facility Name:

Shoreham Nuclear Power Station Inspection At:

Wading River, New York Inspection Conducted: April 25-29,1982 Date of last Physical Protection Inspection:

March 15-17, 1982 P gopera,tional Secur}ty Program Review Type of Inspection:

y 7h/62 Inspector:

---

R. J ailey, P 1 Fratect n Inspector

'dat6 Approvedby[

4WN

[ MO3 Anthony T. God hief, Safegu ection,

/ dat'e Technical rams Branch Inspection Summary:

Preoperational Security Program Review on April 25-29, 1982 (Report No.

50-322/82-09)

Areas Reviewed:

Preoperational inspection to evaluate progress on the proposed Physical Security Plan; Security Organization-(Personnel) and (Response); Security a$$ Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys, and

  • g Combinations; Physical Barriers - (Protected Area) and (Vital Areas); Security go System Power Supply; Lighting; Assessment Aids; Access Control - (Personnel) and oo (Vehicles); Detection Aids (Protected Area) and (Vital Areas); Alarm Stations S$

and Communications. Also provided aid to the NRC Division of Nuclear Material m

Safety and Safeguards' Plant Protection Analyst in his confirmatory site evaluation.

o onco The security program review involved 38 inspector hours on site by one NRC oo region based inspector. The program review was begun during regular hours; 10 o83 inspection hours were accomplished during off shift periods.

@go'

Results:

,

The plant protection analyst completed the confirmatory site evaluation of the security program.

Several areas required additional upgrading to satisfy NRC requirements.

Region I comments concerning the proposed physical security plan were discussed and evaluated for inclusion into the plan before its final approval.