Security Baseline Inspection Report 05000321/2025402 and 05000366/2025402
ML25349A623
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/17/2025
From: Jannette Worosilo
NRC/RGN-II/DFRSS/NSB
To: Coleman J
Southern Nuclear Operating Co
References
IR 2025402
Download: ML25349A623 (0)


Text

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 & 2 - SECURITY BASELINE INSPECTION REPORT 05000321/2025402 AND 05000366/2025402

Dear Jamie M. Coleman:

On December 12, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Edwin I. Hatch Nuclear Plant, Units 1 & 2 and discussed the results of this inspection with Terrence Gibson and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket Nos. 05000321 and 05000366 License Nos. DPR-57 and NPF-5

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000321 and 05000366

License Numbers:

DPR-57 and NPF-5

Report Numbers:

05000321/2025402 and 05000366/2025402

Enterprise Identifier:

I-2025-402-0033

Licensee:

Southern Nuclear Operating Co., Inc.

Facility:

Edwin I. Hatch Nuclear Plant, Units 1 & 2

Location:

Baxley, GA

Inspection Dates:

September 30, 2025 to December 12, 2025

Inspectors:

L. Jones, Senior Reactor Inspector

Approved By:

Jannette G. Worosilo, Chief

Nuclear Security Branch

Division of Fuels, Radiological Safety, and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting a security baseline inspection at Edwin I. Hatch Nuclear Plant, Units

1 & 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the

NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer

to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for

Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and

records, observed activities, and interviewed personnel to assess licensee performance and

compliance with Commission rules and regulations, license conditions, site procedures, and

standards.

SAFEGUARDS

71130.14 - Review of Power Reactor Target Sets

The inspectors evaluated the Security Target Set Program. The following elements were

evaluated:

Review of Power Reactor Target Sets (1 Sample)

(1)

Inspection Requirements: [03.01, 03.02, 03.03, 03.04, 03.05]

Section 03.01 Review of Events and Logs

The inspector reviewed corrective action program entries since the last Target Set

inspection that concern the target set identification, development, and maintenance

program.

Section 03.02 Target Set Identification and Development Process Review

The inspector assessed the licensee's documentation and maintenance of the

process used to develop and identify complete and accurate target sets as required

by 10 CFR Part 73.55 by reviewing applicable portions of procedures and samples of

records and conducting interviews with responsible personnel and plant employees.

Section 03.03 Verification of Target Sets Changes

The inspector reviewed changes to the licensees documented target sets since the

last Target Set inspection. The inspector verified that any design modifications and

procedure or configuration changes that have occurred were appropriately

documented in the site's target sets.

Section 03.04 Verification of Complete and Accurate Target Sets

The inspector interviewed licensee personnel and reviewed a sample of target sets

for reactor operation and for modes other than operation. The inspector reviewed

assumptions used in the licensees development of its target sets.

Section 03.05 Physical Protection Program Review

The inspector verified that the licensee performed a review of target sets for

accuracy, completeness, and applicability at least every 24 months and as otherwise

required, documented the results and recommendations, and entered findings in the

sites corrective action program (CAP).

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On December 12, 2025, the inspectors presented the security baseline inspection

results to Terrence Gibson and other members of the licensee staff.