Edwin I Hatch Nuclear Plant, Units 1 & 2 - Security Baseline Inspection Report 05000321/2025401 & 05000366/2025401
ML25323A450
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 11/20/2025
From: Jannette Worosilo
NRC/RGN-II/DFFI
To: Coleman J
Southern Nuclear Operating Co
References
IR 2025401
Download: ML25323A450 (1)


Text

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 & 2 - SECURITY BASELINE INSPECTION REPORT 05000321/2025401 AND 05000366/2025401

Dear Jamie M. Coleman:

On September 17, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Edwin I. Hatch Nuclear Plant, Units 1 & 2 and discussed the results of this inspection with Terrence Gibson and other members of your staff. The results of this inspection are documented in the enclosed report.

Due to the temporary cessation of government operations, which commenced on October 01, 2025, the NRC began operating under its Office of Management and Budget-approved plan for operations during a lapse in appropriations. Consistent with that plan, the NRC operated at reduced staffing levels throughout the duration of the shutdown. However, the NRC continued to perform critical health and safety functions and make progress on other high-priority activities associated with the ADVANCE Act and Executive Order 14300. On November 13, 2025, following the passage of a continuing resolution, the NRC resumed normal operations.

However, due to the 43-day lapse in normal operations, the Office of Nuclear Reactor Regulation granted the Regional Offices an extension on the issuance of the calendar year 2025 inspection reports that should have been issued by November 13, 2025, to December 31, 2025. The NRC resumed the routine cycle of issuing inspection reports on November 13, 2025.

No findings or violations of more than minor significance were identified during this inspection.

November 20, 2025 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket Nos. 05000321 and 05000366 License Nos. DPR-57 and NPF-5

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000321 and 05000366

License Numbers:

DPR-57 and NPF-5

Report Numbers:

05000321/2025401 and 05000366/2025401

Enterprise Identifier:

I-2025-401-0053

Licensee:

Southern Nuclear Operating Co., Inc.

Facility:

Edwin I. Hatch Nuclear Plant, Units 1 & 2

Location:

Baxley, GA

Inspection Dates:

September 15, 2025 to September 17, 2025

Inspectors:

J. Brown, Senior Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Nuclear Security Branch

Division of Fuels, Radiological Safety, and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Edwin I. Hatch Nuclear Plant, Units 1 & 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1)

  • TIER I: 02.01 (b, c, d); 02.02 (a, c, d, e, f); 02.03 (a); 02.04 (a, c, d, e); 02.05 (a).
  • TIER II: 02.06 (c); 02.08 (a); 02.08 (c); 02.08 (e).
  • TIER III: 02.09.

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p(2) since the last performance of this IP.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) November 2024 - August

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified that no proprietary information was retained or documented in this report.

  • On September 17, 2025, the inspectors presented the security baseline inspection results to Terrence Gibson and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR 11142407

CR 11144200

CR 11146875

CR 11163211

CR 11165605

CR 11167034

CR 11167217

CR 11174995

CR 11177252

CR 11184474

CR 11192028

CR 11196530

Corrective Action

Documents

CR 11197248

Corrective Action

Documents

Resulting from

Inspection

CR 11212578

Miscellaneous

SEC 2024

Audit Report Fleet

05/14/2024

2SS-SEC-033-0

Security Lock and Key Control

Version 3.3

NMP-AD-013

Control of Safeguards Information

Version 6.0

71130.02

Procedures

NMP-SE-023

Personnel Authorization and Badging

Version 6.3

Corrective Action

Documents

Resulting from

Inspection

CR 11214095

71151

Miscellaneous

NEI 99-02

Revision 8