Text
.
.m U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION I
Report No.
79-12 Docket No.
50-318 License No.
DPR-69 Priority Category C
--
Licensee:
Baltimore Gas and Electric Company ATTN:
Mr. A. E. Lundvall, Jr.
Vice President, Supply P.O. Box 1475 Baltimore, Maryland 21203 Facility Name:
Calvert Cliffs, Unit 2 Inspection At:
_Lusby, Maryland Inspection Conducted:
September 24-26, 1979 Inspectors: 8 0 Yr/W hi,,h.29) f79 G. A. W<on
' dater date
,
date jdh
/ 3/[7 Approved by: /<
L. Tripp, Chief, Engineering Support date Section No. 1, RC&ES Branch Inspection Summary:
Inspection on September 24-26, 1979 (Report 79-12)
Areas Inspected:
Routine, unannounced inspection of inservice inspection activi-ties.
The inspection involved 16 inspector-hours onsite by one NRC inspector.
Results:
No items of noncompliance were identified.
.
1636 284 Region I Form 167 (August 1979)
7912210 3 3)
,
..
DETAILS 1.
Persons Contacted:
Baltimore Gas and Electric Company B. Denton, Operations Engineer W. Gibson, Nuclear Plant Engineering Performance J. Carroll, Supervisor Technical Support T. Snydnor, ISI Coordinator 2.
Inservice Inspection Activities The inspector audited the licensee's 10 year plan for inservice examination at Calvert Cliffs Unit 2.
This plan covers the 10 year interval from 4-1-77 until 4-1-87.
The licensee is presently in the first inservice examination period ending 8-1-80.
The inspector considered the above item with regard to 10 CFR 50.55a(g)
and the ASME Boiler and Pressure Vessel Code,Section XI.
1974 Edition, including the Summer 1975 Addenda and Calvert Cliffs Unit 2 Technical Specification 4.3.
The inspector audited the program to ascertain compliance in the following areas with the ASME Section XI Code.
Description of areas to be examined, the method of examinations
.
and extent of examinations are specified and consistent with requirements.
The intervals of inspection are specified and consistent with
.
licensee's commitments.
Justification for exceptions to codes and standards.
The following
.
is considered unresolved.
10 CFR 50.55a(g)(5)(iii) states:
"If the license has determined that conformance with certain code requirements is impractical for his facility, the licensee shall notify the Commission and submit infor-mation to support his determinations."
It has been determined by the licensee that certain exemptions will be necessary during the 10 year inspection interval.
The licensee is presently documenting these exemptions and will submit to NRR for disposition as allowed by 10 CFR 50.55a(g)(6)(1).
This item is unresolved pending submittal of these exemptions.
(79-12-01)
1636 285
,
.
To ascertain that the program specifies personnel qualifications
.
consistent with Regulatory Guide 1.58 and SNT-TC-1A.
Ascertain that the ISI program contains provisions for control of
.
records such as examination results, calibration data shcats, record of calibration blocks, personnel qualification, and recordable indications.
To determine that adequate record storage is provided and that records
.
are retrievable.
No items of noncompliance were identified.
3.
Exit Interview The inspector met with the licensee representatives (listed under Para-graph 1) at the conclusion of the inspection on September 26, 1979.
The inspector summarized the scope and findings of the Inspection as described in this report.
1536286'