March 2, 2007
SUBJECT:
ANNUAL ASSESSMENT LETTER - CALVERT CLIFFS NUCLEAR POWER PLANT (REPORT 05000317/2007001 AND 05000318 /2007001)
Dear Mr. Spina:
On February 12, 2007, the NRC staff completed its performance review of Calvert Cliffs Nuclear Power Plant (Calvert Cliffs). Our technical staff reviewed performance indicators (PIs)
for the most recent quarter and inspection results for the period from January 1 through December 31, 2006. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as "Exempt from Public Disclosure in accordance with 10 CFR 2.390" will include the physical protection review and resultant inspection plan.
Overall, Calvert Cliffs Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Unit 1 performance for the third and fourth quarters of 2006 was within the Regulatory Response column of the NRCs Action Matrix, based on one finding of low to moderate safety significance (White) identified in September 2006. The White finding involved an incorrect circuit breaker setting that impacted operability of the "1A" emergency diesel generator. The supplemental inspection for this finding was completed in January 2007 and based on the positive results, this finding will be removed from consideration in the performance assessment process after the second quarter of 2007. All PIs for Unit 1 indicate performance at a level requiring no additional NRC oversight (Green). Unit 2 performance for the most recent quarter, as well as for the first three quarters of 2006, was within the Licensee Response Column of the NRC's Action Matrix, based on all Green inspection findings and all PIs. Therefore, we plan to conduct reactor oversight process (ROP)
baseline inspections at Units 1 and 2. We also plan to conduct additional ROP inspections based on your planned Unit 2 reactor vessel head replacement and containment sump modification.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2008. The inspection plan is provided to allow for the resolution of
any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Brian McDermott at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
David C. Lew, Director Division of Reactor Projects Docket Nos. 50-317, 50-318 License Nos. DPR-53, DPR-69 Enclosure: Calvert Cliffs Inspection / Activity Plan cc w/encl:
M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Senior Counsel, Constellation Generation Group, LLC J. Gaines, Director, Licensing Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel P. Birnie, Esquire, Co-Director, Maryland Safe Energy Coalition R. Hickok, NRC Technical Training Center State of Maryland (2)
Calvert Cliffs Inspection / Activity Plan 01/01/2007 - 06/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2007 08:27:49 Report 22
71007
- U2 RX HEAD REPLACEMENT Other Routine 01/08/2007 04/13/2007
71007 IP Reactor Vessel Head Replacement Inspection Other Routine 01/09/2007 01/12/2007
71007 IP Reactor Vessel Head Replacement Inspection Other Routine 04/01/2007 04/13/2007
71007 IP Reactor Vessel Head Replacement Inspection
- ISFSI CONSTRUCTION INSPECTION Other Routine 01/08/2007 01/12/2007 1, 2 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants
SUP
- SUP EDG Supplemental Program 01/22/2007 01/26/2007
95001 IP Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area
71121
- OCC RAD SAFETY Baseline Inspections 01/29/2007 02/02/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 01/29/2007 02/02/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 01/29/2007 02/02/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment
- MAINTENANCE RULE Baseline Inspections 01/29/2007 02/02/2007 1, 2 7111112B IP Maintenance Effectiveness
71007
- U2 RX HEAD REPLACEMENT Other Routine 02/05/2007 03/28/2007
71007 IP Reactor Vessel Head Replacement Inspection
71121
- OCC RAD PROT Other Routine 03/05/2007 03/09/2007
71007 IP Reactor Vessel Head Replacement Inspection Baseline Inspections 03/05/2007 03/09/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/05/2007 03/09/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 03/05/2007 03/09/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment
7111108P
- U2 INSERVICE INSPECTION Baseline Inspections 03/12/2007 03/16/2007
7111108P IP Inservice Inspection Activities - PWR
TI-166
- CONTAINMENT SUMP MODIFICATIONS Safety Issues 03/26/2007 04/04/2007
2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
MODS
- MODS & 50.59 Baseline Inspections 04/16/2007 04/20/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 04/16/2007 04/20/2007 1, 2 7111117B IP Permanent Plant Modifications
7112201
- PUB RAD SAFETY - RETS Baseline Inspections 04/23/2007 04/27/2007 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems
TRI FIRE
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 06/11/2007 06/15/2007 1, 2 7111105T IP Fire Protection [Triennial]
Baseline Inspections 06/25/2007 06/29/2007 1, 2 7111105T IP Fire Protection [Triennial]
71121
- OCC RAD SAFETY Baseline Inspections 08/13/2007 08/17/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Calvert Cliffs Inspection / Activity Plan 01/01/2007 - 06/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2007 08:27:49 Report 22
71121
- OCC RAD SAFETY Baseline Inspections 08/13/2007 08/17/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 08/13/2007 08/17/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 08/13/2007 08/17/2007 1, 2 71151 IP Performance Indicator Verification
- PI&R Baseline Inspections 08/27/2007 08/31/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 09/10/2007 09/14/2007 1, 2 71152B IP Identification and Resolution of Problems
7111111B
- L.O. REQUAL. PROG. + P/F REVIEW Baseline Inspections 11/26/2007 11/30/2007 1, 2 7111111B IP Licensed Operator Requalification Program
7112202
- PUB RAD SAFETY - RADWASTE Baseline Inspections 10/01/2007 10/05/2007 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 10/01/2007 10/05/2007 1, 2 71151 IP Performance Indicator Verification
7111401
- EP EXERCISE & PI VERIFICATION Baseline Inspections 10/29/2007 11/02/2007 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 10/29/2007 11/02/2007 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/29/2007 11/02/2007 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 10/29/2007 11/02/2007 1, 2 71151-EP03 IP Alert & Notification System
5/16 EXM
- OPERATOR LICENSING INITIAL EXAMS Not Applicable 04/21/2008 04/25/2008
U01633 CALVERT CLIFFS UNIT 1 & 2 INITIAL EXAM (FY08)
Not Applicable 05/19/2008 05/23/2008
U01633 CALVERT CLIFFS UNIT 1 & 2 INITIAL EXAM (FY08)
7111107B
- HEAT SINK INSP Baseline Inspections 02/04/2008 02/08/2008 1, 2 7111107B IP Heat Sink Performance
7111108P
- U1 INSERVICE INSPECTION Baseline Inspections 02/18/2008 02/22/2008
7111108P IP Inservice Inspection Activities - PWR Baseline Inspections 02/25/2008 02/29/2008
7111108P IP Inservice Inspection Activities - PWR
71121
- OCC RAD SAFETY Baseline Inspections 02/25/2008 02/29/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 02/25/2008 02/29/2008 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 02/25/2008 02/29/2008 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment
TI-166
- CONTAINMENT SUMP MODIFICATION INSPECTION Safety Issues 03/10/2008 03/14/2008
2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
7111121
- CDBI Baseline Inspections 06/02/2008 06/06/2008 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 06/16/2008 06/20/2008 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 06/23/2008 06/27/2008 1, 2 7111121 IP Component Design Bases Inspection This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Brian McDermott at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
David C. Lew, Director Division of Reactor Projects Docket Nos. 50-317, 50-318 License Nos. DPR-53, DPR-69 Enclosure: Calvert Cliffs Inspection / Activity Plan cc w/encl:
M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer President, Calvert County Board of Commissioners C. W. Fleming, Senior Counsel, Constellation Generation Group, LLC J. Gaines, Director, Licensing Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel P. Birnie, Esquire, Co-Director, Maryland Safe Energy Coalition R. Hickok, NRC Technical Training Center State of Maryland (2)
Distribution w/encl: (via E-mail)
S. Collins, RA M. Dapas, DRA J. Lamb, RI OEDO M. Kowal, NRR D. Pickett, PM, NRR M. David, PM, NRR (Backup)
B. McDermott, DRP B. Fuller, DRP S. Kennedy, DRP, SRI C. Newgent - Resident OA Region I Docket Room (with concurrences)
RidsNrrDirsIpab@nrc.gov Institute of Nuclear Power Operations (INPO)
DOCUMENT NAME: S:\\ROP-7 EOC Review\\2006 ROP-7 Annual Assessment Letters\\PDF Merged files\\Annual Assessment Letter Calvert Cliffs.wpd SUNSI Review Complete: BJM (Reviewers Initials)
After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME BFuller BMcDermott DLew DATE 3/01/07 3/01/07 3/01/07 OFFICIAL RECORD COPY