| Issue date: | 11/01/1979 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| Shared Package | |
| ML19211A920 | List: |
| References | |
| NUDOCS 7912210319 | |
| Download: ML19211A919 (2) | |
See also: IR 05000318/1979012
Text
Wc,,
- g>n atoog'o
UNITED STATES
E I
( ('gg
NUCLEAR REGULATORY COMMISSION
3 .? \\ g' h
E
REGION I
o,, D 5 /
631 PARK AVENUE
%;'O.....f
KING OF PRUSSIA, PENNSYLVANIA 19406
NN 011m
Docket No. 50-318
Baltimore Gas and Electric Company
ATTN:
Mr. A. E. Lundvall, Jr.
Vice President, Supply
P. O. Box 1475
Baltimore, Maryland 21203
Gentlemen:
Subject:
Inspection No. 50-318/79-12
This refers to the inspection conducted by G. Walton of this office on September
24-26, 1979, at Calvert Cliffs Nuclear Power Plant Unit 2, Lusby, Maryland of
activities authorized by NRC License No. DPR-69 and to the discussions of our
findings held by G. Walton with Mr. Denton at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20
days to this office to withhold such information from public disclosure.
Any
such application must be accompanied by an affidavit executed by the owner of
the information, which identifies the document or part sought to be withheld,
and which contains a statement of reasons which addresses with specificity the
items which will be considered by the Commission as listed in subparagraph (b)
(4) of Section 2.790.
The information sought to be withheld shall be incorpo-
rated as far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified period, the report will be
placed in the Public Document Room.
1636 282
7912210
31
.
2
Baltimore Gas and Electric
2
Company
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
T
s
-
lRoert . Carlson,
hief
Reactor Construction and Engineering
Support Branch
Enclosure:
Office of Inspection and Enforcement
Inspection Report No. 50-318/79-12
cc w/ encl:
R. M. Douglass, Manager, Quality Assurance
L. B. Russell, Chief Engineer
W. Gibson, General Supervisor, Operations QA
R. C. L. Olson, Senior Engineer
K. H. Sebra, Principal Enginere
1636 283