IR 05000317/1982008

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Repts 50-317/82-08 & 50-318/82-08 on 820412-16.No Noncompliance Noted.Major Areas Inspected: Security Plan & Implementation Procedures & Security Organization.Details Withheld (Ref 10CFR73.21)
ML20053D137
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/18/1982
From: Cogan N, Gody A, Mckeown L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20053D128 List:
References
50-317-82-08, 50-317-82-8, 50-318-82-08, 50-318-82-8, NUDOCS 8206040115
Download: ML20053D137 (1)


Text

.

.

-

,

,

U.S. NUCLEAR REGULATORY COMMISSION Region I 50-317/82-08 Report Nos. 50-318/82-08 l

50-317 DPR-53 i

Docket Nos. 50-318 License Nos. DPR-69 Safeguards Group IV Licensee: Baltimore Gas and Electric Company P.O. Box 1475 Baltimore, Maryland 21203 Facility hame:

Calvert Cliffs Nuclear Powein k ota,r Inspection At:

Lusby, Maryland

)

((,c'AIuds i

J

.

ryggg2/

8E Inspection Conducted:

A ril 12-16,1982

-

3)

pars)y

/

a Date of Last Physical Protection Inspection:

Sep%dnber 28 - October 2,1981 Type of Inspection:

Routine, Unannounced Physical Protection kk Inspectors:

idom d41-

,

isa M. McKeown,' Physical Protection date(Aigned Inspector

.

i

/bM as 0 Azfdl 6 /$53---

Nancy J afan,psicalProtection date signed Inspe tor Approved by:

  1. 4/

kM*8d

.

A. M. Gody, 'hief, 9 guards Section, dat6 signed Technical Progra s

ranch D$

Inspection Summary:

gga.

Routine, unannounced physical protection inspection on April 12-16, 1982 go (Combined Inspections 50-317/82-08 and 50-318/82-08)

eno Areas Inspected:

Included a Site Orientation; review of the Security Plan and n

Implementing Procedures; Security Organization (Management, Personnel, Response);

-:c oo Security Program Audit; Records and Reports; Testing and Maintenance; Locks, gQ Keys, and Combinations; Access Controls (Packages) and Detection Aids (Vital

Areas). Also included a followup to previously identified violations and OE unresolved items. The inspection involved 68 inspector hours onsite by two mae NRC region-based inspectors. The inspection was initiated during regular duty hours; 7 inspector-hours were performed during offshift periods.

Results: The licensee was found to be in compliance with NRC requirements in

._ WARNING: PWtMJXQtMN103pAtttad.

, EECTION 147 ATOMIC ENERGY ACI l954.

THE INFORMATION ON THIS PAGE Is nEEMEn TO BES-F1-82-57 VIDIarIONS OF TIIE PROTECIION APPROPRIATE FOR PUBLIC DISCLOSURE PURSUANT TO Copy of Co g p f pies RMUIREMENTS OF 10 CFR 73.21 10 CFR 73,21 lL SUBJECT TO CIVIMO @JgWsteaanme n 9es