IR 05000315/1992003

From kanterella
Jump to navigation Jump to search
Insp Repts 50-315/92-03 & 50-316/92-03 on 920203-0306.No Violations Noted.Major Areas Inspected:Electrical Distribution Sys Functional Insp
ML17329A483
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/21/1992
From: Gardner R, Westberg R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML17329A482 List:
References
50-315-92-03, 50-315-92-3, 50-316-92-03, 50-316-92-3, NUDOCS 9205050084
Download: ML17329A483 (50)


Text

+)

U.

S.

NUCLEAR REGULATORY COMMISSION REGION II I Report Nos.

50-315/92003(DRS),;

50-316/92003(DRS)

Docket Nos.

50-315; 50-316 I

Licensee:

Indiana Michigan Power Company 1 Riverside Plaza Columbus, OH 43216 License Nos.

DPR-58; DPR-74 Facility Name:

D.

C.

Cook Nuclear Power Plant Inspection At:

Stevensville, HI Inspection Conducted:

February 3 through March 6, 1992 Inspection Team:

R. Westberg, Team Leader S.

Burgess, Assistant Team Leader J. Neisler, Reactor Inspector W. Scott, Reactor Inspector NRC Consultants:

0. Hazzoni, Atomic Energy of Canada, Ltd.

(AECL)

G.

Cha, AECL S.

Leelananda, AECL e

~

Approved By:

9, ~

L R. A.

berg, Team Lead Plant Systems Section Date ApprOVed By:

R. l1. 4v."<"'-

R.

N. Gardner, Chief Plant Systems Section Date Ins ection Summar Ins ection on Februar 3 throu h March

1992 Re ort Nos.

315 92003 DRS Special electrical distribution system functional inspection in accordance with Temporary Instruction (TI) 2515/107 (25107).

Results:

The team determined the electrical distribution system was functional and engineering and technical support was adequate.

A summary of strengths and weaknesses in system design and engineering support is provided in the Executive Summary of this report.

Four unresolved items were identified regarding completion of the EDG load study (Section 3. 1. 14), monitoring of degraded grid conditions (Section 3. 1. 19),

dc short circuit calculations (Section 3.2.2),

and ac fuses in dc applications (Section 3.2.4).

Six open items were identified regarding completion of 4kv short circuit calculations (Se'ction 3. 1. 11), revision of procedure to preclude operation at voltage higher than equipment rating (Section 3. 1. 18), completion of calculations for 9205050084

'720421 PDR ADOCK 05000315 G

PDR

Results Continued:

I 120Vac circuits (Section 3.2.6), reanalysis of fuel oil motion during design basis events (Section 3.3. 1), seismic analysis of buried portion of fuel oil piping (Section 3.3.2),

and testing of air flow to 2CD EDG control panels (Section 3.3.4).

Four previously identified inspection Findings were close SUMMARY REPORTS.

PROVIDE IMPEDAHCES FOR THE FOLLOWIHG TRAHSFORMERS:

1AB, 1CD, 101AB, 101CD, 2AB, 2CD, 201AB, 201CD.

PROVIDE DOCUMENTATIOH OF FAST TRAHSFER ON 2/1/86 (2CD XFMR) AND 3/13/91 (UNIT 2 TRIP DURING ICE STORM).

PROVIDE A COPY OF FSAR SECTION 1.7 (CODES AND STANDARDS).

PROVIDE A COPY OF THE FOLLOWING MODIFICATIOH PACKAGES: RFC-1298, 2?39, AND 2944.,

PROVIDE A NETWORK STABILITY STUDY TO CONFIRM THE FSAR STATEMENT THAT..."LOSS OF ONE OR BOTH UNITS WILL NOT PERTURB THE EXTERNAL GRID TO THE EXTENT THAT OFFSITE POWER WILL NOT BE AVAILABLE."...

PROVIDE A

NETWORK STABILITY STUDY FOR THE PRESEHT DAY CONDITIONS FORTHE MOST CRITICAL EVEHTS CHALLENGING SYSTEM STABILITY. INCLUDE MOSTCRITICAL FAULT LOCATIONS, INCLUDING FAULTS AT THE D.C.COOK SWITCHYD'LOSS OF LOAD, LOSS OF GENERATION, AND CRITICAL CLEARING TIMES.

PROVIDE FUEL OIL SAMPLING PROCEDURES.

PROVIDE THE RELIABILITYDATA FOR PRESENT DAY CONDITIONS OF THE OFFSITE NETWORK.

PROVIDE AN UP TO DATE LIST OF ELECTRICAL CALCULATIONS INCLUDING DATES AND REVISION NUMBERS.

PROVIDE A LISTING OF NON SAFETY RELATED (NSR) CIRCUITS CONNECTED TO THE CLASS 1E BUSES.

PROVIDE A COMPLETE AHALYSIS OF THE COMPLIANCE OF THE D.C.

COOK PLT.WITH USNRC'S REGULATORY GUIDES.

PROVIDE A COMPLETE ANALYSIS OF THE COMPLIANCE OF THE D.C.COOKE PLANTWITH IEEE STANDARDS AND GUIDES.

PROVIDE DETAILS ON THE PROTECTION (IF ANY) AGAINST THE POSSIBILITY OF OVERLOADING AN EDG WHICH IS BEING TESTED, WHEN A LOSS OF OFFSITE POWER (LOOP)

OCCURS.

INDICATE THE EFFECT (IF ANY) OF A COINCIDENT EDG TEST ON ONE UNIT, WITH AN ACCIDENT ON tHE OTHERUNIT, AND A LOOP.COHSIDER THE TIME DELAY ( IF ANY) CAUSED IN THE STARTING OF THE EDG ON THE ACCIDENT UNIT, AND RELATE THE TIME DELAY TOTHE MAXIMUM TIME ESTABLISHED IN THE ACCIDENT ANALYSIS FOR THE PLANT..

REFERENCE QUESTION 84.DID YOU REVISE THE SAMPLING DATA SHEET?

FORM 12'tHP LAB 041-6A REVISION 16 IS DIFFERENT THAN ALL THE OTHERS (12 THP LAB 041.6 REVISION 14).

WHERE IS THE SAMPLING DATA FOR AB DSL DAY TK LSX-700(

CD DSL DAY TK LSX-701, AB DSL LO LSX 702(

AND CD DSL LO LSX 703?

REFERENCENCE QUESTION 84.

ON YOUR DRAWING SERIES 1-2 5151, YOU LABELED THE EDG FUEL OIL STARAGE TANKS (BURIED) AS

"AB~'ND

"CD".ON YOUR DATA SHEETS, THESE TANKS ARE LABELED N DSL FO TANK AND S DSL FO TANK.WHICH CORRESPONDS TO WHICH?

I ASSUME "NORTH" IS "CD".IS THIS CORRECT?

PROVIDE VOLTAGE DROP CALCULATIONS ON THE 120VAC ESS LOADS.ALSO PROVIDE MANUFACTURERS DATA ON THE 120VAC DEVICES (RATED CURRENT, MAX/MIN OPERATING VOLTAGES, ETC).

PROVIDE MANUFACTURER S DATA ON CABLES USED IN THE DC SYSTEMS (CABLE INSULATION TYPES'EMPERATURE RAT I HG g AMPACI TY g ETC)

PROVIDE VOLTAGE DROP CALCULATIONS FOR DC OPERATED EQUIPMENT AHD DEVICES IH THE ESS SYSTEMS (MOTORS, CIRCUIT'REAKER COMPONENTS, SOLENOID VALVES, MOVS, ETC).

PROVIDE BATTERY TESI'ROCEDURES FOR CAPACITY TESTS AND PERFORMANCE TESTS.

ALSO PROVIDE THE LATEST CAPACITY AND PERFORMANCE TEST RESULTS FOR UNIT

BATTERIES AB, CD, AND k.

WHAT TYPE OF CONTROL ROOM INDICATION IS INSTALLED TO NOTIFY THE OPERATOR THAT THE EDG LOCAL/REMOTE SWITCH IS IN THE

"LOCAL" POSITION?

PROVIDE THE SURVEILLNCE PROCEDURE THAT VERIFIES THE EDG FUEL TRANSFER PUMP OPERATION.

ARE THE EDG LOAD BANK TEST BREAKERS (5HK250S)

CLASS 1E?

PROVIDE TAP SETTINGS'OR 4160/600V TRANSFORMERS (11A, 118, 11C,21A,218,21C,21D).

WERE THERE ANY CRID INSTABILITY PROBLEMS IN THE LATE 1980'S?

'WHAT WERE THEY AND WHAT WAS THE RESOLUTIOH?

WHAT INDICATION IS AVAILABLEWHEN THE EDG IS PLACED IN LOCAL COHTROL?

'WHAT INDICATION IS AVAILABLEWHEN THE EDG IS IN MANUAL REGULATION?

THE VOLTMETER ON 4KV CUBICLE T11D12 READS 65 VOLTS; IS THIS ACCURATE?

WHAT IS THE PT RATIO?

2

177.

178.

179.

180.

181.

182.

183.

184.

185.

186.

187.

188.

'89.

190.

191.

192.

193.

194.

195.

196.

7.

0.

201.

202.

203.

204.

205.

206.

207.

208.

209.

210.

211.

212.

213.

BUS 11B AND 110 (600V) VOLTMETERS READ 350 V.IS THIS ACCURATE?

IS THE VM READING PHASE TO NEUTRAL?

REFERENCE QUESTION 85.

FUEL OIL COHSUMPTIOH RATE OF 4.29 GPH 'WAS CALCULATED BASED Ok THE GUARENTEE RATE OF 0.368 LB/BHI'ER HP AT FULL LOAD. 'WERE THERE ANY FUEL OIL CONSUMPTIOH RATES RECORDED THROUGH OUT THE OPERATING LIFE OF THESE EDGS TO SUBSTANTIATE OR CONFIRH THE GUARENTEE RATE?

IF HOT, lJHY NOT?

REFERENCE QUESTION 87.

PROVIDE THE CALCULATION THAT ESTABLISHES THE STORAGE CAPCAITY OF THE 60000 GAL STORAGE TANK (I.E.,

USABLE VOLUME, RESERVE, LEVAI. ALARM SET POINTS).

REFERENCE QUESTIOH 88.

PER STORAGE TANK SET POINTS SHEET 5 OF 5, DATED 1/30/92. 12-LLA-100 AB LAH 5'-5" ABOVE TANK CENTER LINE. 12-LLA-101 CD LAL 2'.-11.5" ABOVE TAHK CENTER LINE. PER DRA'IJING NO. 2-5151 LLA 100 AB LAH 5'-5" ABOVE TANK CENTER LINE.LA.101 CD LAL 3'-4" ABOVE TAHK CENTER LINE.WHY ARE THE LAL VALUESDIFFERENT?

'WHICH IS CORRECT'?

WHAT ARE THE FREE VOLUME, USABLE VOLUME, AND RESERVE FOR THE TWO LOW LEVEL ALARM POINTS?

PROVIDE THE FOLLOWING DRAWINGS OH 120VAC DISTRIBUTION SCHEME 001 12051 19)

001 12050 1 1 ~

001 12052

DO THE TWO TR!P COILS OH THE SWITCHYARD BREAKERS HAVE SEPARATE RELAYS?

WHAT IS THE MAXIMUM SWITCHYARD BREAKER CLEARING TIME USING BACKUP RELAYING?

" DOES COOK PLANT HAVE CATHODIC PROTECTION ON BURIED TAHKS?

RAT 4KV BUS BARS DO NOT APPEAR TO BE PROTECTED FROM LIGHTNING. HAS THIS BEEN STUDIED AND IF SO

'WHAT ARE THE RESULTS?

PROVIDE SWITCHYARD GROUHD GRID CALCULATIOHS.

PROVIDE BUS RATINGS (CONTINOUS CURRENT, SHORT-CIRCUIT RATINGS)

FOR DC DISTRIBUTION PANELS TDCD, MDCD, AHD 1-DCN.

ALSO PROVIDE fUSE COORDINATION CURVES FOR BATTERY/CHARGER FUSES TO ALL DOWNSTREAM FUSES INCLUDING TIE FUSES BETWEEN TRAIN

"A" AND TRAIN "B".

WHAT IS THE CURRENT LIMITING SETTING Ok THE SAFETY RELATED BATTERY CHARGERS?

ON THE GRID IHVERTERS, DO YOU REDUCE DC INPUT VOLTAGE AND VERIFY THAT OUTPUT VOLTAGE AND FREQUENCY ARE ACCEPTABLE.

YOU TEST THE EDG FUEL OIL TRANSFER PUMPS FOR AUTOMATIC START?

PROVIDE A COPY OF SPR91.0996 AND DEDICATION PLAN HP-0057.

PROVIDE COPIES OF COMPLETED PROCEDURES>(LAST TIME THE PROCEDURE WAS PERFORMED):

12 MHP 5021.082 001, 2-OHP 4023.001.007/

1-EHP SP RFC 2883 AB, 1-MHP SP.137.

WHAT IS THE CLASS IE BATTERY CHARGER(S)

CURRENT LIMITING SETPOINT?

PROVIDE A LISTING OF LATE AND PAST DUE PMS AND CALIBRATIONS FOR THE EDG.

(PM HUMBER, SHORT DESCIPTION OF, TASK, DATE DUE)

PROVIDE COPIES OF PROBLEM REPORTS:

89-0268, 91-0688, 91.0808.

PROVIDE COPIES OF THE FOLLOWING COMPLETED JOS:

A23409, B41602, B21659, A006465.

ARE THE INVERTERS TESTED TO VERIFY REQUIRED OUTPUT VOLTAGE/FREQUENCY WITH A LOW VOLTAGEDC INPUT (210VDC)?

PROVIDE COPIES IF SIGNIFICANT PROBLEM REPORT PACKAGES FOR:

SPR 90.2013, SPR 90-047(

SPR 90.1966.

PROVIDE A COPY OF FSAR SECTION 2.96 AND 2.91.

REFERENCE QUESTION 98.

SYSTEM DESCRIPTION DCC-HV 101 REVISION 3 DATED 1/15/92 PAGE 7 OF 30 STATES" DIESEL GENERATOR ROOMS ARE BASED UPON MAIHTAIHING THE ROOM AT MIN OF 60 DEGREES F

AND AT A MAX OF 130 DEGRESS F,

lJITH THE INTERIOR OF THE CONTROL PANELS MAINTAINEDAT A MAX OF 104 DEGREES F.

PER HV-DGS-3JI4, THE ROOM TAKES AIR (WHICH COULD BE 130 DEGRESS MAX)

AND DISTRIBUTES IT TO THE THRESS PAHELS, WHICH ARE TO BE MAINTAINED AT 104 DEGREES MAX. HOW IS THIS POSSIBLE?

ARE PLANT AND SWITCHYARD GROUNDING GRIDS SEPARATE?

IF CONNECTED, PROVIDE INFORMATION DESCRIB!NG ARRANAGEMENT.

PROVIDE SWITCHYARD BREAKER MASTER RECLOSER SHEET.

PROVIDE SWITCHYARD BREAKER PHASE TO GROUND MAXIMUM FAULT CURRENT.

PROVIDE CRITERIA FOR THE 4KV, AND THE LOW VOLTAGE CONTAINMENT ELECTRICAL PEHETRATIONS (CEP).

SHOW HOW THE PROTECTIVE DEVICE SETTINGS RELATE TO THE PENETRATION FULL LOAD AHD SHORT CIRCUIT RATINGS AT THE EXPECTED AMBIENT TEHPERATURES UNDER NORMAL AND ACCIDITIONS. PROVIDE ASSOCIATED TIME CURRENT CURVES FOR AN RCP AND FOR REPRESENTATIVE LOADS AT LOWER VOLTAGE LEVELS.

DISCUSS THE IMPLEMENTATION OF DESIGN VS.

THE REQUIREHENTS OF IEEE 317 AND NRC RG 1.63.

PROVIDE ALL DETAILS RELATED TO SURVEILLANCE.

PROVIDE CALCULATIONS OF THE EDG NEUTRAL GROUNDING EQUIPMENT, INCLUDING PERTIHENT MANUfACTURER'S INFORMATIOk FOR THE ACTUALLY INSTALLED EQUIPMEkT.

PROVIDE A REVIE'W COPY OF 1977 TEST REPORT 2PO 050 587.

PROVIDE A REVIEW COPY OF PROCEDURE COVERING OPERATING INSTRUCTION FOR THE EVENT OF OFFSITE PO'WER RESTORATION WHEN MITIGA'TING A LOCA WITH A LOOP.

PROVIDE THE CRITERIA FOR ASCERTAINING THAT THE INTEGRITY OF THE STATION GROUNDING GRID IS NOT DEGRADED BY CORROSION OF BURIED CONDUCTGORS.

INCLUDE RELEVANT DETAILS OF PERIODIC SURVEILLANCE TESTS ON THE VALUE OF RESISTANCE TO REMOTE GROUND.

PROVIDE HARDCOPY ONE LINE AND ELEMENTARY DIAGRAMS FOR MCC 1-EZC-C.

PROVIDE COPIES OF THE FOLLOWING QA AUDITS AND SURVEILLAHCES: QA-91-07( QA-91-15, QA-90-04, QA-90-16) QA-89-20, 12-91.31, 12-90-95, QAO-90-22, 1-89-60, AND QA0.89-39.

PROVIDE CLARIFICATION AS TO WHY THE BATTERY CHARGER OUTPUT AMMETER READINGS (CD = 70A AND AB = 62A) DID NOT MATCH BATTERY AMMETER AND LOAD AMMETER READINGS (BATT = OA AND LOAD = 40A Ok CD AND BATT = OA AND LOAD ~

OA ON AB) THIS WAS NO'IICED DURING THE WALKDOWN ON FEB 5, 1992.

PROVIDE DOCUMENI'ATION TO SHOW AS MEASURED ROOM TEMPERATURES Ik UNIT

BATTERY ROOMS.

PROVIDE A DOCUMENT THAT SHOWS CABLE USED Ik THE DC SYSTEM INDICATING THE CABLE SIZE, CABLE LENGTH, TYPE, ETC FOR BOTH UNITS 1 AND 2. THIS INFORMATION IS REQUESTED FOR ALL OF THE CABLES SHOWN ON ONE-LINE DRAWINGS OP-1-12003 AND OP 2 12003 AND SHOULD INCLUDE THE BOP CABLES.

PROVIDE A COPY OF THE LAST 3 CALIBRATIONS AND MANUFACTURER'S INSTRUCTIONS FOR EDG DIFFERENTIAL RELAYS: DIESEL AB PHASE 1.COMPONENT ¹ 1.87-DGAB-1 AND DIESEL CD PHASE 1-COMPONEkT ¹1.87-DGCD-1.

REFERENCE QUESTION 98.

PROVIDE FOR REVIElJ; MOOIFICATIOH PACKAGE NO. 12-3085,

"TORHADO MODIFICATIONOF VENTILATION INTAKE DUCTWORK TO DIESEL GENERATOR ROOMS".

REFERENCE QUESTION 98.

PROVIDE COPIES OF THE FOLLOWING LERS: 91-002-00,91-005.00, AkD 91-005.01.

PROVIDE ALL PERTINENT DETAILS Ok THE TYPE OF COMPUTER PROGRAM USED FOR VOLTAGE CALCULATIOHS, INCLUDING PROGRAM VALIDATION AND VERIFICATION.

PROVIDE PROTECTIVE RELAYING CRITERIA FOR THE PLANT, IkCLUDING GROUND FAULT PROTECTION AND DETECTION SYSTEM FOR THE 4KV,

e

~

~

'18.

219.

220.

221.

222.

223.

224.

225.

226.

227.

228.

229.

230.

231.

232.

233.

234.

235.

236.

237.

24'3.

244.

245.

246.

247.

248.

249.

250.

251.

252.

253.

254.

255.

256.

257.

258.

9.

600V, AND 480V LEVELS. PROVIDE SETTING CALCULATIOHS FOR UNIT 1 MAIN GEHERATOR, TRANSFORMERS TR4, TR5, TR1, TR1AB, TR1CD, TR101AB, 69/

PROVIDE CALCULATION PS-34KVP.001.

PROVIDE MAIN OHE LINE (METERING AND RELAYING) DIAGRAMS FOR UNIT 1 GENERATOR STEP-UP TRANSFORMER, AND FOR THE 345 KV AND 765 KV SWITCHYARDS.

PROVIDE VENDOR MANUAL AND SPECIFICATION FOR EDG GOVERHOR, EXCITATION, AND VOLTAGE REGULATOR.

PROVIDE VENDOR MANUAL FOR 4KV SWITCHGEAR.

PROVIDE VENDOR MANUAL FOR 600V S'WITCHGEAR.

PROVIDE CALCULATION PS-4KVP-008.

PROVIDE VENDER MANUAL FOR MOTOR CONTROL CENTERS (MCCS).

PROVIDE CALCULATION PS-4KVP-009.

PROVIDE CALCULATIOH PS 600VD-001 FOR 4KV/600V TRANSFORMER DIFFERENTIAL PROTECTION.

'ROVIDE CALCULATION PS600VD-003.

PROVIDE CALCULATION PS 600VD-004.

PROVIDE CALCULATIONS PS 600VP-001'002,

-006.

PROVIDE CALCULATION PS-AUXM1-001.

PROVIDE CALCULATION PS-GRID-001.

PROViDE CALCULATION PS-EDGP-003.

PROVIDE VENDOR SPEC FOR 5 KV AND 600 V CABLES.

PROVIDE FUSE COORDINATION STUDY FROM BATTERY/CHARGER FUSES TO ALL DOWNSTREAM FUSES INCLUDIHG THE FUSES BETWEEN TRAIN

"A" AND TRAIN "8".

PLEASE PROVIDE A

COPY OF THE FOLLOWING PROBLEM REPORTS:

PR 91-1318, PR-90.1486i PR 90.1816, PR-90-1903i PR-91-0087, PR 91 0153)

PR 91 0516 PR 91 0587)

PR 91 0601 )

PR 91 1501 (

PR 91 PR 89 0069i PR 89 0268)

PR 89 0281

~

PR 89 0428 PR.89.0430, PR-89.0641, PR-89-0663, PR-90-0688, PR-89-0734, PR-89-1006, PR-90-0016, PR.90-0081, PR-90-0239, PR-90-0584, PR-90.0715, PR.89.0470, PR.90-1001, PR-90-1204, PR.90-1291 PROVIDE MANUFACTURER S DATA FOR DC OPERATED EQUIPMENT AND DEVICES ( IE Al L LARGE MOTORSi COMPONENTS OF CIRCUI T BREAKERS i MOVS, SOLENOID VALVES.ONLY ONE OF EACH TYPICAL EQUIPMENT OR DEVICE.)

DATA SHOULD COHTAIN HORSEPOWER (FOR LARGE MOTORS),

FULL LOAD CURRENT, STARTING CURREkT, MAXIHUM AND MINIHUH OPERATING VOLTAGES.

PROVIDE MODIFICATION PACKAGES FOR EDG BEARING TEMPERATURE MONITOR.

ARE THE FOLLOWING ITEMS IN THE SQUG PROGRAM:

1) EDG STARTING AIR RECEIVER SAFETY VALVES (E.G.

1 SV-78-AB2) 2) LIGHI'IHG Ik THE BATTERY ROOMS. 3)

PA Ik THE BATTERY ROOMS?

PROVIDE A COPY OF THE DOCUMENTS REFERENCED ON ATTACHHENT-A.

PROVIDE OR HAKE AVAILABLETHE FOLLOWING RFCS:

12-2474, 12-2501, 12-2927, 12-2788, 12-2862, AND 12-2870..

PROVIDE A COPY OF IEEE 308, 1971.

PROVIDE A COMPLIANCE ANALYSIS FOR IEEE 308, 1971 AND IEEE 279-1971.

WHAT ARE THE MAXIMUM FLOAT VOLTAGE AND EQUALIZING VOLTAGE RECOMMEHEDBY THE MANUFACTURER FOR AB, CO, AND N BATTERIES?

ALSO, WHAT ARE THE CHARGER SETTINGS FOR FLOAT VOLTAGE AND EQUALIZIHG VOLTAGE FOR AB, CD, AND N BATTERIES?

PROVIDE CALIBRATION DATA SHEETS FOR THE LAST 3 TIMES UV RELYS WERE CALIBRATED PER 1HP 6030 IMP.309 AND 1HP 6030 IMP.250.

, WHY ARE tHE MISO.

LOADS THAT ARE AUTOMATICALLYSEQUENCED ONTO THE DIESEL BUS OHMITTED FROM SECTION 8.4 OF THE FSAR (PG 8.4.2).

DEFINE EACH MISC.

LOAD AND THEIR TOTAL KlJ CONTRIBUTION?

IS THE AIR SUPPLY TO THE FUEL OIL TANK BUBBLER FROM SAFETY RELATED AND SEISMICALLY QUALIFIED SOURCES?

PROVIDE THE FOLLOWING COMPLETED JOB ORDER PACKAGES:

A15156, A15178, 22683, A9442, 810969.

REFERENCE QUESTION 88.

PER DIESEL FUEL DAY TANK ECP ¹1-2 L1-06 P 7 OF 17, THE AVAILABLEDAY TANK OIL VOLUME BETWEEN "TOP OF OUTLET PIPE (MIH LEVEL)" TO "HIGH LEVEL ALARM TO TURk OFF PUMP (MAX LEVEL)" IS 373.81 GAL, WHICH IS EQUAL TO 87. 14 MINUTES OF DIESEL OPERATION.

THE FSAR STATED 2 HOURS.

PLEASE EXPLAIN THE DIFFERENCE.

PROVIDE FLOW DIAGRAMS 1-5113 AND 2 5113.

PROVIDE THE ENGIHEERING ANALYSES TO SUPPORT THE SEISMIC QUALIFICATIONOF THE DIESEL BEARING THERMOCOUPLE MODIFICATION, RFC.01.2921.

THE FABRICATION SKETCH NUMBER IS C0-1-2-5633-10-1.1 (REV 10.1.1).

PROVIDE SEISMIC CALCULATIONS FOR RFC DC 0'l-2753,

"DIESEL ENGINE THERHOCOUPLE AND MONITOR".

ARE PLAN'I PROCEDURES Ik PLACE TO CONTROL OR PROHIBIT WORK IH THE SWITCHYARD OR Ok REDUNDANT SYSTEMS WHEN ONE EDG IS

'NOPERABLE BECAUSE OF MAINTENANCE OR TESTING?

PROVIDE COPIES OF COMPLETED DATA SHEETES FOR LAST 2 CALIBRATIONS FOR PROCEDURES 1IHP6030 IMP.250 AND 1IHP6030 IMP.309.

PLEASE PROVIDE A COPY OF THE DRAWING FOR CONTROL SWITCH 101-AM-1 AND101-AM-2 CONTACT DEVELOPMEHT (REF:

RFC-2872 AMSAC

'ONTROL CIRCUIT).

ARE THE SAFETY RELATED BATTERY CHARGERS TESTED TO VERIFY: 1.

OPERATION AT DESIGN RATING. 2.

OPERATION OF THE CURRENT LIMITING FEATURE.

PROVIDE BACKGROUND INFO USED TO WRITE THE NS&L SAFETY REVIEW FOR RFC 2921.

SPECIFICALLY PROVIDE A COPY OF THE NS&L 7 PROCEDURES Ik EFFECT AT THAT TIME.

REFERENCE RFC NO.

294 (N.

MAIN BEARING REPLACEMEN'I ON EDGS)

HAVE THERE BEEk ANY BEARING FAILURES AFTER THE MODIFICATION?

REFERENCE QUESTION 204.

WALK DR. MAZZONI THRU THE OPS REPOWERIHG PROCEDURES. SPECIFICALLY EXPLAIN THE POWER RESTORATION FRE OM A Sl/LOOP.WHEk DO WE SYHCHROHIZE TO THE GRID AND HOW DO WE KNOW WHEN IT IS STABLE?

PROVIDE ADDITIONAL INFORMATION RELATING TO RFC NO. 2921.

SPECIFICALLY HOW DID THE RFC PICK UP THE THERMOCOUPLE SIGNAL AND WHAT CIRCUIT CHANGES WERE COMPLETED?

WHAT ARE THE VOLTAGE RANGES (ACCEPTABLE) Ok 600V RATED CABLE?

LICENSING INFORMATION IS NEEDED TO SUPPORT THE EDG BEING TESTED AT 1/2 LOADING OURIHG MONTHLY SURVEILLANCE. SPECIFICALLY, WHY DO WE FULLY LOAD THE EDGS ONLY DURING REFUELING OUTTAGES?

PROVIDE THE FOLLOWI NG CAPAC I TY AND PERFORMANCE TEST RESULTS FOR UNIT 1 AND Uk I T 2 BATTERI ES 18 MONTH 2AB 2CD 1k~

AND 2N. 60.MONTH 1AB, 2AB, 1CD, 2CD, 2N.

NOTE:

INFO WAS PREVIOUSLY REQUEST Ik QUESTION 166, BUT NOT PROVIDE.

265.

266.

267.

269.

270.

271.

272.

273.

274.

275.

276.

277.

278.

81.

282.

283.

284.

285.

286.

287.

288.

'289.

290.

291.

292.

293.

REFERENCE QUESTION 90.

PROVIDE SEISMIC CALCULATIOHS FOR THE FOLLOWING:

1) 60,000 GAL HAIN FUEL OIL TANK. 2)

FUEL OIL PIPING FOR UNDERGROUND PORTIOH, IHCLUDING:

PIPING, PIPE CHASE, AND INSTRUMEHT AIR TUBING.

PLEASE PROVIDE THE LAST TWO CALIBRATION DATA SHEETS FOR INSTRUMENTS:1CPI 302( 1CPI-220(

1LPI-200, 1LTI-220( 1LTI-242/

1CTI.301, 1CTI-3021CTI-321, 1XTI-301, 1XTI-302, 1LPI-230, 1LPI-231,1LPI-241, 1LPI-2421LLI-120, 1LTR-201 THRU 207.

PROVIDE DOCUMENTATION SHOWING SEISMIC QUALIFICATIOH OF EDG DIFFERENTIAL RELAYS.

CALCULATION PS 00VD-001, PROVIDE THE FOLLOWING: (1)

SOURCE DOCUMENTATION (NOT REFEREHCED)

FOR IMPEDAHCE VALUES (ATT ~

5, SH.11),

FOR THE BREAKER RATINGS (SH.2),

FOR THE CALCULATION BREAKER RESISTANCES, AND FOR LRA VALUES Ok SH.9 OF ATT.2?

(2) TYPICAL ONELINE SKETCH FOR THE AHALYSIS OF ATT.4; (3) BASIS FOR FORMULA FOR RPU, ON SH.6, ATT.4; (4)

CONCLUSIONS OF ATT. 2; (5)BASIS FOR NOT INCLUDING 1'184 lAZ-BC lk ATT. 2 STUDIES (SH

OF ATT.2)g (6) BASIS FOR ELIMINATING THE POSSIBILITY OF BOLTED FAULTS.

PROVIDE SHORT CIRCUIT WITHSTAND RATINGS FOR THE CABLES USED IH THE DC SYSTEM.

PROVIDE 60 MONTH TEST REPORT FOR AB AND CD BATTERIES. PROVIDE 18 MONTH TEST REPORT FOR N BATTERIES.

WHAT IS THE MAXIMUM DOWNTIME ALLOWED FOR THE AB, CD, AND N

BATTERIES?

PROVIDE THE DOCUHENTATION SUPPORTING THE ALLOWABLE DOW N TIME.

ESSENTIAL SERVICE WATER SYSTEM-PROVIDE BIO FOULING COHTROL PROGRAM FOR REVIEW.

ESW SUPPLY TO EDG (AFTER COOLERS, LUBE OIL COOLERS, AND JACKET WATER COOLERS)

ARE ONLY REQUIRED

'WHEN THE EDG IS OPERATING.'WHEN THE ENGINES ARE OH STAND-BY, WHAT PROVISIONS ARE AVAILABLETO PROTECT THE HEAT EXCHANGERS FROM SCALING.

ESSENTIAL SERVICE WATER SYSTEM - PROVIDE SYSTEM DESCRIPTION DCC-HV-103 AND ASSOCIATED GEHERAL ARRAHGEMENT DRAWINGS FOR PUMP HOUSE AHD EDG JIELATED PIPIHG SYSTEMS.

PROVIDE THE SUMMARY TABLE FOR CALCULATION BY K.J.MUNSON, DATED 6/8/90 (WHICH DOES NOT HAVE ANY IDEHTIFYING HUMBER). THE SUMMARY TABLE WAS NOT RECEIVED 'WITH THE COPY OF THE CALCULATION.

PROVIDE CLEAR IDENTIFICATION OF THE WORST CONDITION OF SHORT CIRCUIT AND RELATE TO RATINGS Ok EQUIPMENT.

PROVIDE THE CRITERIA FOR GROUND DETECTIOH, DETAIL SPECIFICATION FOR HARDWARE AND SET POIkl'S, AND ALARM RESPONSE PROCEDURE PROVIDE FAULT DETECTIOH AND FAULT ISOLATION CRITERIA FOR CONTROL CIRCUIT FAULTS, INDICATING THE SENSITIVITY OF THE PROTECTION FOR WORST CASE CIRCUIT IMPEDANCE.

IS D.C.

COOK COMITTED TO THE FOLLOWING REG.

GUIDES OR IEEE STANDARDSIEEE-338, RG-1.9, IEEE-450 AND IEEE-387.

PLEASE PROVIDE A COPY OF THE LASTEST EXECUTED COPY OF PROCEDURE 1-OHP 4030.STP.027AB INCLUDING COMPLETED DATA SHEETS.

PLEASE PROVIDE A COPY OF PROCEDURE IMP.087 AND DATA SHEETS FOR INSTRUMENT 1-LLI-120 CALIBRATION PERFORMED OF JULY 30, 1989.

ADDITIONALLY,PROVIDE A COPY OF THE WORK DOCUMENT FOR REPAIR OF THE INSTRUMENT AND THE CALIBRATION FREQUENCY.

WHY WAS ASTM C94 PART OF THE ORIGINAL DESIGH INSTALLATION AND WHY WAS IT DELETED FROM THIS MODIFICATION?

WHAT WAS MEANT BY THE WORST CASE LOAD AT 290 AMPS FOR THE NEW CHARGERS, WHICH ARE RATED AT 300 AMPS?

GE'

DEFINITION OF A DE ENERGIZED DIFFERENTIAL RELAY IN THE RESPONSE TO QUESTION 263 IS A DIFFERENTIAL RELAY WITH 50 PERCENT OF. PICKUP CURRENT OR VOLTAGE APPLIED.

WHAT IS THE ACTUAL CURRENT/VOLTAGE APPLIED TO THE DIFFERENTIAL RELAYS IH THE DE ENERGIZED STATE?

WAS THIS CURRENT/VOLTAGE USED FOR SEISMIC QUALIFICATION?

PLEASE PROVIDE THE LAST TWO CALIBRATIONDATA SHEETS AND CALIBRATION PROCEDURE FOR THE FOLLOWING INSTRUMENTS:

1I.LI-100AB, 1XPI-211, IXPI-212, 1-XPI-231, 1.XPI-232, 1-XPI-201, 1-XPI-202, 1-XPI-223 AND 1.SV-81.AB1/AB2.

PLEASE PROVIDE THE WIRING DIAGRAMS FOR THE EAST/WEST MDAFP CONTROL CABINET, AHD STEAM GEN.

AFW CONSERVATION CABINET (TRAIN A/8).

IN REFERENCE TO Ak EDG PRELIMIHARY LOAD STUDY (DATED 1/15/92),

PROVIDE REFERENCE 10, FROM SH. 3, WHICH IS NOT LISTED Ik SH.11.

ALSO PROVIDE RECOMMENDATION 5, REFERENCED BUT NOT GIVEN IN THE STUDY. CLARIFY THE DRY TYPE TRANSFORMER LOAD LOSS TAKEN AS 20 KW, BUT LISTED Ik TEST REPORTS AS 24 KW. CLARIFY IF TRAHSF. TEST REPORTS INCLUDED (FOR BBC AND SORGEL)

ARE IHDEED APPLICABLE, BEING THAT THE STUDY REFERES TO THEM AS "WESTINGHOUSE".

MODIFICATION 12 2788 INSTALLED NOk-SAFETY RELATED HEATERS IN THE CD BATTERY ROOMS. 1) ARE THE HEATERS PERFORMING A SAFETY FUNCTION? IF SO, WHY NOT USE A QUALIFIED SAFETY RELATED COMPOHENT?

2) ARE THERE OTHER HEATING SYSTEMS (SAFETY RELATED)

THATMAINTAINBATTERY TEMPERATURES AT THE REQUIRED OPERABILITY TEMPERATURE LEVELS?

PLEASE PROVIDE A COPY OF THE LAST TWO CD DIESEL GENERATOR OPERABILITY TESTS WITH COMPLETED DATA SHEETS.

ALSO PROVIDE A COPY OF ISI DATA FROM THE TECH DATA BOOK FIGURE 15.2.

DURING A PLANT WALKDOWN, THE HAMEPLATE FOR THE EDG ENGINE COULD NO'I BE FOUHD AT ANY PLACE AFIXED TO THE ENGINE.

PLEASE ADVISE WHETHER SUCH NAMEPLATE HAS BEEN PROVIDED AND FURNISH A COMPLETE COPY OF THE ENGINE CERTIFIED RATINGS.

NO EVIDENCE WAS FOUND Ik THE PROTECTIVE DEVICE SET POINT CALCULATIONS THAT THE SHORT CIRCUIT CAPABILITY OF THE CABLE INSULATION/SHIELDING.HAD BEEN TAKEN INTO ACCOUNT. PROVIDE SUCH EVIDENCE IF IT CAN BE OTHERWISE FURNISHED.

PROVIDE LER(S)

FOR ANY AND ALL STATION BLACKOUT EVENT(S)

PROVIDE AN EVALUATION OF THE PLANT VOI.TAGE REGULATION REQUIREMENTS AGAIHST THE US HRC REQUIREMENTS CONTAINED IH BTP.1, INCLUDING FIELD VERIFICATION OF CALCULATED BUS VOLTAGES.

PROVIDE LER(S)

FOR AkY AND ALL TRAHSFORMER FAULTS IH THE 345 KV AND THE 765 KV SWITCHYARD.

PLEASE DESCRIBE THE SQUG PROGRAM PLANHED FOR THE EDG SYSTEM.

PROVIDE COPIES OF THE FOLLOWING PROCEDURES:

'12-1HP-6030.IMP.317 FOR UklT 1 AB AND CD DIESELS (LAST 3 TIMES PERFORMED);

1-62-1-DGAB CALIBRATION (LAST 2)I 1-AB-DSL DPM CARD 1-AB-1 (LAST 3)I 1-62 DOAB (LAST 2 CALIBRATIONS)~

REFERENCE QUESTION 95:

A)

LICENSEE RESPONSE PERTAINED TO PER-OPERATIONAL TEST CONDUCTED lk MAY OF 1977 'AS THERE BEEN ANY SUBSEQUEN'ITESTING TO VERIFY THE STARTING AIR CAPABILITY OF 2 STARTS?

b)

PROVIDE THE DURATION FOR THE COMPRESSOR TO BRING THESTARTING AIR RECEIVER FROM THE DEPLETED STATE TO FULL PRESSURE. c)

PROVIDE STARTING AIR SYSTEM TEST PROC EDURE.

N.BATTERY HAS BEEN SIZED FOR 120V END OF DISCHARGE VOLTS (CALC. PS-250VL-004)

SERVICE TEST HAS BEEN PERFORMED TO Ak END OF DISCHARGE VOLTAGE OF 204.75V.

A BATTERY CAPACITY OF 94.38 PERCENT HAS BEEH CALCULATED. THE CAPCACITY TO 210 PERCEN'I WHOULD HAVEBEEN 92 PERCEN't.

PLEASE EXPLAIN WHY THE BATTERY WAS NOT TESTED AT THE DESIGNED END OF DISCHARGE.

REFERENCE QUESTIOk 7-PROVIDE THE FOLLOWING DOCUMENTS:

A) CALCULATIONS FOR

"CALCULATED MOTOR INPUT AT MAX EXPECTED FLOW, KW, ETC. 8) CALCULATIONS FOR

"CALCULATED MOTOR INPUT AT TEST FLOW, KW, ETC "

C) CALCULATIONS FOR CORRECTION FACTOR)

AND D)

TEST REPORTS FOR CONTAINMENT SPRAY AHD CENI'RIFUGAL CHARGING PUMPS.

PROVIDE A COPY OF AEP WRC 106 Xi

8:

299.

300.

301.

302.

303.

304.

305.

WHAT IS THE 600 V UNDERVOLTAGE RELAY SERIES?

WHAT ARE THE VOLTAGE TOLERANCES ON THE VARIOUS 600V MCC ITEHS?

SPECIFICALLY MOLDED CASE CIRCUIT BREAKERS, THE MCC BUSES, AND THE LOAD CONTACTORS ~

THE 2 SECOND TIME DELAY OH THE UHDERVOLTAGE RELAY CIRCUIT, IS IT ANALYZED AND ACCEPTABLE?

PROVIDE THE TECHNICAL VENDOR INFORMATION PERTAINING TO THE UNDERVOLTAGE AND DEGRADED VOLTAGE RELAYS.

PROVIDE A COPY OF THE PROCEDURE FOR CALIBRATING THE UNDERVOLTAGE AND DEGRADED GRID VOLTAGE RELAYS ON THE 4KV SAFETY BUSES.

REGARDING QUESTION 271, HOW SENSITIVE IS THE SETTINGS(I.E.

HIGH IMPEDANCE GROUHDS D BOLTED). ALSO, PROVIDE TECHHICAL INFORMATION ON GE IAV RELAY.

WHAT ADMINISTRATIVE CONTROLS ARE IN PLACE TO MONITOR THE DIESEL ROOM TEMPERATURE FOR EOG OPERABILITY?

PLEASE PROVIDE THE ELECTRICAL SCHEMATIC FOR THE EDG ROOM DAMPERS.

'WHAT IS THE DAMPER FAIL SAFE POSITION WITH LOSS OF POWER.

PLEASE PROVIDE A COPY OF PROCEDURE STP.027AB AND COHPLETED DATA SHEETS FOR JUNE/JULY 1989.

REF:

JOB ORDER ¹ADI2059 DATED 4/3/89 1.

WAS THE INDICATOR NEEDLE FOUND OFF AT THE TIME OF CALIBRATION, OR WAS IT IDENTIFIED BY OPERATIONS DURING ROUNDS CHECK?

2.

WHAT ACTION WAS TAKEN TO VERIFY ADEQUATE DAY TANK LEVEL FOR EDG OPERABILITY REQUIREMENTS?

REFERENCE QUESTION 97:

1)

IN THE HEAT GAIN PORTION OF THE CALCULATION, ONLY ONE FAN IS CONSIDERED.

ISN'T BOTH INTAKE AND EXHAUST FANS MUST OPERATE FOR THE WORST CASE SCENARIO. ALSO REVIEW THIS CALCULATION. 2)

WERE THESE FANS EVER TESTED TO VERIFY THE 4500 CFM?

IF SO, SUBMIT TEST PLAN AND RESULTS FOR REVIEW. 3)

THE LAST TWO FANS CURVES 00 NOT APPEAR TO BELONG.