Forwards Insp Repts 50-315/92-03 & 50-316/92-03 on 920203-0306.No Violations Identified.Several Weaknesses & Vulnerabilities,Including Errors in Recent Design Calculations,Noted
ML17329A481
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/21/1992
From: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML17329A482 List:
References
NUDOCS 9205050075
Download: ML17329A481 (7)


See also: IR 05000315/1992003

Text

Qf'R 2 1 1992

Docket No. 50-315

Docket No. 50-316

Indiana Michigan Power

Company

ATTN:

Hr.

E.

E. Fitzpatrick

Vice President

Nuclear Operations

Division

1 Riverside

Plaza

Columbus,

OH

43216

Dear Mr. Fitzpatrick:

This refers to the special electrical distribution system functional

inspection

(EDSFI) conducted

by Hr. Rolf A. Westberg

and others of this office

on February

3 through

March 6,

1992.

The inspection evaluated activities at

the

D.

CD

Cook Nuclear

Power Plant,

Units

1 and 2, authorized

by

NRC Operating

License

Nos.

DPR-58

and DPR-74.

We discussed

our inspection findings with you

and

members of your staff at the exit interview on March 6,

1992.

The enclosed

copy of our inspection report identifies areas

examined during

the inspection.

The team assessed

the design,

implementation,

and engineering

technical

support relative to the electrical distribution system.

The

inspection consisted

of a selective

review of design calculations,

relevant

procedures,

representative

records,

installed equipment,

and interviews with

engineering

and technical

support staff..

The team considered

the design

and operation of the-electrical distribution

system at

D.

C.

Cook to be acceptable.

However, the team identified several

weaknesses

and vulnerabilities.

Examples

included errors in recent design

calculations;

lack of design basis

information relative to equipment ratings

and relay settings;

lack of 'protection

on the

120Vac control circuits;

and

battery

room temperature

fluctuations.

With respect

to design control, which

has

been identified as

a problem area

in inspections

over the past several

years,

the

team

saw improvement.

However, design control deficiencies

in

recent work identified by the team indicate that continued

management

attention is warranted

in this area.

Several

strengths

were identified.

Host significant were

an experienced

and

competent

engineering staff; strong capacity

and capability of off-site power

sources;

well defined engineering

guidelines for cable sizing

and voltage drop

calculations;

and the training program for system

and project engineers.

We

view your Design Basis

Documentation

Reconstition

Program to be

a very

significant effort since

a number of the weaknesses

noted

by the team involved

missing or incomplete design basis

documentation.

Ggg 050003

g007 g P20421

PDR

  • D

.

@~p

G

(

P

I

I

Indiana Michigan Power

Company

APR 21 lpga

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of

this letter and the enclosed

inspection report will be placed in the

NRC

Public Document

Room.

We will gladly discuss

any questions

you have concerning this inspection.

r

Sincerely,

S<iQ)

'-iJ B( ji-ig'i')ll I ~

>As'-LLi+l

H. J. Hiller, Director

Division of Reactor Safety

Enclosures:

l.

Inspection

Report

Nos.

50-315/92003(DRS))

50-316/92003(DRS)

2.

Appendix

A - Personnel

Contacted

3.

Appendix

B - Requests

for Information

cc w/enclosure:

A. A. Blind, Plant Manager

DCD/DCB (RIDS)

OC/LFDCB

Resident

Inspector,

RIII

James

R. Padgett,

Michigan Public

Service

Commission

EIS Coordinator,

USEPA

Region

5 Office

Michigan Department of

Public Health

D.

C.

Cook,

LPM,

NRR

W. Hodges,

RI

J. Durr,

RI

A. Gibson,

RII

C. Julian,

RII

S. Collins,

RIV

T. Steka,

RIV

R.

Zimmerman,

RV

L. Hiller,

RV

4/g/92

4/j6 /92

4/lo /92

4/

> 0/92

4/~

92

4/io/92

4/io /92

RIII

RIII

Hartin

Hiller

4/

/92

4/

/92

Indiana Michigan Power

Company

APR 211992

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of

this letter

and the enclosed

inspection report wi,ll be placed in the

NRC

Public Document

Room.

We will gladly discuss

any questions

you have concerning this inspection.

Sincerely,

<..~

"..0

B'l

H'i'~>g,ll J.

jv)l LQi

'nclosures:

1.

Inspection

Report

Nos.

50-315/92003(DRS);

50-316/92003(DRS)

2.

Appendix

A - Personnel

Contacted

3.

Appendix

B - Requests

for Information

cc w/enclosure:

A.

A.= Blind, Plant Manager

DCD/DCB (RIDS)

OC/LFDCB

Resident

Inspector,

RIII

James'R.

Padgett,

Michigan Public

Service

Commission

EIS Coordinator,

USEPA

Region

5 Office

Michigan Department of

Public Health

D.

C.

Cook,

LPM,

NRR

W. Hodges,

RI

J. Durr,

RI

A. Gibson,

RII

C. Julian,

RII

S. Collins,

RIV-

T. Steka,

RIV

R.

Zimmerman,

RV

L. Hiller,

RV

E.

Imbro,

NRR

H. J. Hiller, Director

Division of Reactor Safety

RIII

RIII

RIII

RIII

RIII

[ -------- SEE

PREVIOUS

CONCURRENCE

PAGE ----- ]

Westberg/lc

Burgess

Gardner

Jorgensen

Ring

4/ /92

4/

/92

4/

/92

4/

/92

4/

/92

[-SEE

PREVIOUS

PAGE-]

Niesler

Scott

4/

/92

4/

/92

RIII

RIII

Hartin

Hiller

4/

/92

4/

/92

/

lq

Indiana Hichigan

Power

Company

APR

2 1 1992

Various commitments

were

made

as documented

in the enclosed

report to address

the concerns of the inspection

team.

In addition,

a number of unresolved

and

open'items

are identified in the'eport.

These

items

and commitments will be

reviewed during

a follow up inspection.

No violations of NRC requirements

were identified during the course of this

inspection.

In accordance

with 10 CFR 2,790'of the Commission's

regulations,

a copy of

this letter

and the enclosed

inspection report will be placed in the

NRC

Public Document

Room.

We will gladly discuss

any questions

you have concerning .this inspection.

Sincerely,

Enclosures:-

1.

Inspection

Report

Nos.

50-315/92003(DRS);

50-316/92003(DRS)

2.

Appendix

A - Personnel

Contacted

3.

Appendix

B - Requests

for Information

H. J. Hiller, Director

Division of Reactor Safety

See attached distribution

RIII

RIII

RIII

RIII

[ -------- SEE

PREVIOUS

CONCURRENCE

PAGE

Westberg/lc

Burgess

Gardner

Jorgensen

4/ /92

4/

/92

4/

/92

4/

/92

[-SEE

PREVIOUS PAGE-)

Niesler

Scott

4/

/92

4/

/92

RIII

RIII

RIII

Ri

,~

Hartin

'er

4/y)/92

4+< /92

p)/92

Indianan Hichigan

Power

Company

APR 21 1992

Distribution

cc w/enclosure:

A. A. Blind, Plant Hanager

DCD/DCB (RIDS)

OC/LFDCB

Resident

Inspector,

RIII

James

R. Padgett,

Hichigan

Service

Commission

EIS Coordinator,

USEPA

Region

5 Office

Hichigan Department of

Public Health

D.

C.

Cook,

LPH,

NRR

W. Hodges,

RI

J. Durr,

RI

A. Gibson,

RII

C. Julian,

RII

S. Collins,

RIY

T. Steka,

RIV

R.

Zimmerman,

RV

L. Hiller,

RV

E.

Imbro,

NRR

Public