IR 05000315/1979019
| ML19254C584 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 09/28/1979 |
| From: | Hind J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J AMERICAN ELECTRIC POWER CO., INC. |
| Shared Package | |
| ML19254C585 | List: |
| References | |
| NUDOCS 7910170013 | |
| Download: ML19254C584 (1) | |
Text
fa aro,v yf o,
UNITED STATES MQ
- ,
NUCLEAR REGULATORY COMMISSION
/
n i.ig a Ed REGION ill
o, 799 ROOSEVELT ROAD
%..+
~
GLEN ELLYN. ILLINOIS 0o137
SEP23 h
.
Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation ATTN:
Mr. John E. Dolan, Senior Vice Chairman, Engineering 2 Broadway New York, NY 10004 Gentlemen:
Thank you for your letter dated September 14, 1979, informing us of the steps you have taken to correct the noncompliance identified in our letter dated August 24, 1979. We will examine your corrective action during a future inspection.
Your cooperation with us is appreciated.
Sincerely, h.&h-c MJ. A. Hind, Chief Safeguards Branch cc:
Mr. D. V. Shaller, Plant Manager cc w/ltr dtd 9/14/79, w/
(2.790(d) Information)
attachment:
Central Files Reproduction Unit NRC 20b cc w/ltr dtd 9/14/79, w/o (2.790(d) Information)
attachment:
,
/
1155 340 c)Q 792o170
___.