IR 05000315/1979014

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-315/79-14 & 50-316/79-11
ML17318A302
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/13/1979
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
INDIANA MICHIGAN POWER CO.
Shared Package
ML17318A303 List:
References
NUDOCS 7910050195
Download: ML17318A302 (2)


Text

Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Power Company ATTN:

Mr. John E. Dolan, Vice Chairman Engineering and Construction 2 Broadway New York, NY 10004 Gentlemen:

Thank you for your letter dated July 24, 1979, informing us of the steps you have taken to correct the noncompliance identified in our letter dated June 25, 1979.

We will examine your corrective action during a future inspection.

I Your cooperation with us is appreciated.

Sincerely, cc w/ltr dtd 7/24/79:

D. V. Shaller, Plant Manager Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Citizens for a Better Environment A. B. Davis, Chief Fuel Facility and Materials Safety Branch RIII Grege RI R II)

RII Masse 8/6/79 9yoo5o /'FS

J