IR 05000313/1976006

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-313/76-06
ML19326C609
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 06/28/1976
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
Shared Package
ML19326C610 List:
References
NUDOCS 8004230710
Download: ML19326C609 (1)


Text

.

.

.

.. _

.

/

.

'

, g.......

~

.*

15 FILE COPY

.

UNITED STATES NUCLEAR REGULATORY CoMMISSloN OFFICE oF INSPFmCN.4ND ENFORCEMENT

RECloN IV 611 RYAN PLAZA ORIVE, SUITE 1000 ARLINGTON, TEXAS %Bi 76011 June 28, 1976 I...

Arkansas Power and Light Company Docket No. 50-313 ATTN:

Mr. J. D. Phillips Senior Vice President Sixth and Pine Streets Pine Bluff, Arkansas 71601 Gentlemen:

Thank you for your letter of June 23, 1976, in respcuse to our letter

'

dated June 2, 1976.

We have no further questions at this time and will review your corrective action during a future inspection.

v

Sincerely,

.

$ Woh W G. L. Madsen, Chief Reactor Oper2tions and Nuclear Support 3 ranch t

c

-

.

o

-

.

,

8004230 7 N

.

--.

--

..

. -

.

- -.

_

__. _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _

e

.

,

..

^'

rr

=

H ELPING B UIL O ARKANSAS ARK ANS AS POWER & LIGHT COMPANY

'

STM & LOUISlANA STRE ETS LITTLE AOCK. A AKANSAS 72E C3. (5C13 371-4000 June 23, 1976

.

Mr. Glen L. Madsen Reactor Construction & Operations Branch U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 Subject: Arkansas Power & Light Company Arkansas Nuclear One-Unit 1 Docket No. 50-313 License No. DPR-51 f\\

IE Inspection Report No.

l (j 50-313/76-06 Gentlemen:

In reply to your letter of June 2,1976, we are providing the following information:

NRC Position

'

Criteria XI and XVII of Appendix B to 10 CFR 50 requires that test records shall be documented. This requirement is further amplified by Section 11.4.2 of the licensee's Quality Assurance Manual which requires that the test records shall include the test data.

Contrary to the above requirements, the licensee had been recording only the resultant boron concentration which was determined in the boron analysis of vessel and spent fuel storage water samples.

This is a deficiency.

l AP&L Resoonse In an effort to create a more detailed auditable and inspectable d

program for the surveillance of baron concentration in the vessel-l

)

'

m 0(- 7)c>6 75 fL9SoufH UTILITIES SYST

.

TAX A AvtNG INVESTO A OWNEO MEMBER MI

.

.

.:

..

.

..

...<

.

..

.

Mr. Glen ' L. Mm_sen

- 2-June 23, 1976

\\

and spent fuel storage samples, we have instituted a laboratory method to record the milliliters of titrant and the milliliters of samples used to derive the boron concentrations.

~

We trust that the corrective action taken will resolve the above deficiency.

Very truly yoursr s-

-/

,w -

..

William Ca naugh III Assistant Director Power Production WC:lt

.

t

k t

d

6

, _,

. _ - _.

.s

_-..,..a

,,. _,.,,

_.. - - _ ~,.. _,,,,

-_.,.,_,,.....,..,r.~-.--

,,.e.---,.

,,.,,,_.,,,....,%

.,--n..,.-.,.w.,_,,,

,.,r,,,--,,...~r-