U. S. NUCLEAR REGULATORY COMMISSION CFFICE OF INSPECTION AND ENFORCEFEIR

REGION V

50-312/79-16 Report No.

50-312 DPR-54 License No.

Safeguards Group Docket No.

Sacramento Municipal Utility District Licensee:

P. O. Box 15830 Sacramento, California 95813 Rancho Seco Facility Name:

Inspection at:

Clay Station, California Inspection conducted, mJuly 13 to August 3,1979 Inspectors:

de# [d

//

H. L. Ca t.

eactor Inspector

/ Da'te Signed

,

fr

}Y l' 99 P.'Johnso / eactor ns 'ctor

/ Dale 5 gn d

!

sf v -

S /S 7/

i G.Joh/st.;-(ReactorInspector Dat'e Signed Approved By:

i

.7 w/

7/r7/79

.m B. J. Faulkenberry, ChJef-Real3or Projects Section 2, Date Signed Reactor Operations ahd Nuclear Support Branch Summary:

Insoection between July 13 7.nd Auaust 3,1979 (Report No. 50-312/79-16)

Areas Inspected:

Inspection of plant operations; the fire protection program; and independent effort.

The inspection involved 120 inspector-hours onsite by three NRC inspectors.

Results: No items of noncompliance or deviations were identified.

RV Form 719(?)

1503 045 79120502,8 0)

.

... _.

DETAILS 1.

Persons Contacted R. Rodriguez, Manager, Nuclear Operations

  • P. Oubre, Plant Superintendent
  • W. Ford, Supervisor of Nuclear Operations J. McColligan, Supervisor, Engineering and Quality Control
  • R. Colombo, Technical Assistant R Wichert, Plant Mechanical Enoineer T. Tucker, Shift Supervisor J. Mau, Training Supervisor
  • H. Heckert, Enoineering Technician R. Low, Electric Engineer N. Brock, E/I&C naintenance Suoervisor J. Sullivan, Quality Assurance Engineer
  • G. Coward, Maintenance Supervisor D. Gardiner, Instructor The inspectors also interviewed several other licensee employees, including members of the engineering and reactor operations staffs.
  • Denotes those attending the exit interview.

2.

Fira Protection / Prevention Prooram The inspector verified that the licensee has implemented a picaram for fire protection and prevention.

This verification included interviews with plant personnel and review of procedures applicable to the referenced program.

The following documents were examined:

AP 500, Emergency Plan AP 34, Fire Safety Inspection Guide AP 29 VSE and Control of Combustible Materials and Incition Sources AP 605, General Warehousing AP 3, Work Request AP 700, Rancho Seco Training Proaram AP 4, Administrative Clearance Procedure, Technical Specifications, Sections 3.14 and a.18 The examination included a facility tour of yard valves to verify proper lineup and a review of records of fire inspections performed by the licensee and fire insurance inspectors. Also, records of the previous emergency drill were examined to ascertain whether identified deficiencies had been resolved.

1503 0dS

.

' N 6e

.

-2-During the examination of the Fire Fighting Procedures section of the Emergency Plan (AP 500), the inspector noted that on page C29 the control room is listed as the location of two self-contained-breathing-devices for use by plant personnel for fire fighting purposes only.

Actually, the devices were located across the hall from the control room in a Xerox This is contrary to the Emergency Plan,Section III.l.c, page C29, room.

but is considered by the licensee to be a more accessible location. A licensee representative stated that the Emergency Plan will be changed to include the accurate locations of the self-contained-breathing devices.

The inspector observed that there are no self-contained-breathing-devices located in the control room. Neither the licensee's emergency plan, nor NRC requirements prescribe that self-contained-breathing-devices must be located in the control room for use by the control room operations personnel.

No items of noncompliance or deviations were identified.

3.

Independent Effort The inspectors provided three-shift surveillance at Rancho Seco during a portion of the period covered by this report.

On July 30,1979, a Resident Inspector was assigned to the plant and the three-shift coverage was terminated.

The independent inspection effort consisted primarily of on-shift surveillance of plant operations.

Also, on inspector sat in on a four-hour indoctrination lecture on security and health physics practices.

No items of noncompliance or deviations were identified.

4.

Plant Operations Over the period covered by this report, various shift logs, operating records, data sheets, instrument traces and records of equipment malfunc-tion were examined.

Tours of accessible areas were performed to make independent assessments of equipment and plant conditions. Specifically, the inspectors observed the proper monitoring of instrumentation by operators, that proper radiation controls were established, that plant housekeeping conditions were adequate, and proper disposal of contaminated clothing.

Also, the inspectors observed properc^ontrol room manning, including the two licensed operators in the control room at all times as required by IE Bulletin 79-05C/06C. Shift turnovers were observed to be conducted i-compliance with licensee procedures.

No items of noncompliance or deviations were observed.

1503 047

.

.

-3-S.

Exit Interview The inspector met with licensae representatives (denoted in Paragraph 1)

on August 3,1979, to discus:, the scope and findings of the inspection.

No items of noncompliance were identified during this interview.

The licensee committed to change the Emergency Plan to include accurate loca-tions of self-contained-breathing-devices (see Paragraph 2).

The change will be completed by September 15, 1979.

(79-16-01)