ust 28, 2018

SUBJECT:

SALEM GENERATING STATION UNITS 1 AND 2 UPDATED INSPECTION PLAN (INSPECTION REPORTS 05000272/2018005 AND 05000311/2018005)

Dear Mr. Sena:

The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for Salem Generating Station Units 1 and 2 (Salem). The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. In addition to baseline inspections, the NRC will also be performing Inspection Procedure (IP) 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, and IP 71003, Post-Approval Site Inspection for License Renewal, on Unit 2. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-5200 with any questions you have regarding this letter.

Sincerely,

/RA/

Fred L. Bower, III, Chief Project Branch 3 Division of Reactor Projects Docket Nos. 50-272 and 311 License Nos. DPR-70 and DPR-75 Enclosure:

Salem 1 and 2 Inspection Plan cc: Distribution via ListServ

ML18228A565 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME CLally/CML via email PFinney/PWF via email FBower DATE 8/15/18 8/15/18 8/28/18

IP 22 Inspection Activity Plan Report Salem 07/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count Salem REMP 1 1, 2 08/27/2018 08/31/2018 IP 71124.07 000731 Radiological Environmental Monitoring Program RETS & PI VERIFICATION 1 1, 2 09/10/2018 09/14/2018 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 09/10/2018 09/14/2018 IP 71151 000746 Performance Indicator Verification License Renewal - Phase 1 - Unit 2 1 2 10/22/2018 10/26/2018 IP 71003 000687 Post-Approval Site Inspection for License Renewal 2 10/29/2018 11/02/2018 IP 71003 000687 Post-Approval Site Inspection for License Renewal UNIT 2 INSERVICE INSPECTION 1 2 10/22/2018 11/02/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR BASELINE HP 1 1 10/29/2018 11/02/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 10/29/2018 11/02/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 10/29/2018 11/02/2018 IP 71124.04 000728 Occupational Dose Assessment SALEM INITIAL OL EXAM 4 1, 2 11/26/2018 11/30/2018 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 01/14/2019 01/25/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

ISFSI OPERATIONAL INSPECTION 2 1, 2 01/07/2019 01/11/2019 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants PI&R BIENNIAL 4 1, 2 01/28/2019 02/01/2019 IP 71152B 000747 Problem Identification and Resolution 1, 2 02/11/2019 02/15/2019 IP 71152B 000747 Problem Identification and Resolution HP 1 1, 2 02/04/2019 02/08/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 02/04/2019 02/08/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls EP PROGRAM INSPECTION 2 1, 2 02/11/2019 02/15/2019 IP 71114.02 000717 Alert and Notification System Testing 1, 2 02/11/2019 02/15/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.

8/15/2018 7:14:28 AM

IP 22 Inspection Activity Plan Report Salem 07/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count EP PROGRAM INSPECTION 2 1, 2 02/11/2019 02/15/2019 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 02/11/2019 02/15/2019 IP 71151 001397 Performance Indicator Verification INSERVICE INSPECTION - UNIT 1 1 1 04/15/2019 04/26/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR HP 1 1 04/15/2019 04/19/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls ACCESS CONTROL, PROTECTIVE STRATEGY, TSR 4 1, 2 06/17/2019 06/21/2019 IP 71130.02 000734 Access Control 1, 2 06/17/2019 06/21/2019 IP 71130.05 000737 Protective Strategy Evaluation 1, 2 06/17/2019 06/21/2019 IP 71130.14 000743 Review of Power Reactor Target Sets 1, 2 06/17/2019 06/21/2019 IP 71151 001338 Performance Indicator Verification License Renewal - Phase 2 - Unit 2 2 2 07/15/2019 07/19/2019 IP 71003 000687 Post-Approval Site Inspection for License Renewal EQ PROGRAM 3 1, 2 08/19/2019 08/23/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

1, 2 09/09/2019 09/13/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

SALEM REQUAL INSP WITH P/F RESULTS 2 1, 2 09/16/2019 09/20/2019 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance (Annual)

1, 2 09/16/2019 09/20/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

HP 1 1, 2 09/23/2019 09/27/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 09/23/2019 09/27/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 09/23/2019 09/27/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/23/2019 09/27/2019 IP 71124.04 000729 Occupational Dose Assessment 1, 2 09/23/2019 09/27/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.

8/15/2018 7:14:28 AM

IP 22 Inspection Activity Plan Report Salem 07/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count Radwaste 1 1, 2 10/07/2019 10/11/2019 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Triennial Heat Sink 1 1, 2 11/18/2019 11/22/2019 IP 71111.07T 000700 Heat Sink Performance -Triennial HP 1 1, 2 01/27/2020 01/31/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 01/27/2020 01/31/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 01/27/2020 01/31/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 01/27/2020 01/31/2020 IP 71124.04 000729 Occupational Dose Assessment 1, 2 01/27/2020 01/31/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation FORCE-ONFORCE PLANNING AND EXERCISE WEEKS 7 1, 2 02/24/2020 02/28/2020 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 03/16/2020 03/20/2020 IP 71130.03 000735 Contingency Response - Force-On-Force Testing ISI - UNIT 2 1 2 04/27/2020 05/08/2020 IP 71111.08P 000702 Inservice Inspection Activities - PWR HP 1 1, 2 04/27/2020 05/01/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/27/2020 05/01/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls SALEM INITIAL OL EXAM 4 1, 2 05/11/2020 05/15/2020 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 06/08/2020 06/19/2020 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

SALEM EP EXERCISE INSPECTION 5 1, 2 05/18/2020 05/22/2020 IP 71114.01 000716 Exercise Evaluation 1, 2 05/18/2020 05/22/2020 IP 71151 001397 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.