March 1, 2017
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR SALEM NUCLEAR GENERATING STATION (SALEM), UNIT NOS. 1 AND 2 (REPORTS 05000272/2016006 AND 05000311/2016006)
Dear Mr. Sena:
The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Salem Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at Salem Unit 1 during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Salem Unit 1.
The NRC determined the performance of Salem Unit 2 during the most recent quarter was within the Regulatory Response Column (Column 2) of the NRCs ROP Action Matrix. This conclusion was based on all inspection findings having very low safety significance (i.e., Green)
and a single White PI for Unplanned Scrams per 7,000 Hours Critical. Specifically, Salem Unit 2 crossed the Green-White threshold in the second quarter of 2016 due to four unplanned scrams that occurred on August 5, 2015, February 2 and 14, 2016, and June 28, 2016. This PI remains White because the supplemental inspection in accordance with Inspection Procedure (IP) 95001, Supplemental Inspection Response to Action Matrix Column 2 Inputs, has not been completed and an additional unplanned scram occurred on August 31, 2016. As previously noted in the 2016 mid-cycle letter (Reports 05000272/2016005 and 05000311/2016005; ML16242A0991), the NRC plans to conduct this supplemental inspection after you notify the NRC of your readiness for it.
1 The designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS. The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to baseline inspections, the NRC will perform Temporary Instruction 2515/192, Inspection of the Licensees Interim Compensatory Measures Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems.
The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Fred Bower at (610) 337-5200 with any questions you have regarding this letter.
Sincerely,
/RA/
Michael L. Scott, Director Division of Reactor Projects
Docket Nos.: 50-272 and 50-311 License Nos.: DPR 70 and DPR 75
Enclosure:
Salem Inspection/Activity Plan
cc w/encl: Distribution via ListServ
SUNSI Review
Non-Sensitive Sensitive
Publicly Available Non-Publicly Available
OFFICE RI/DRP RI/DRP RI/DRP
NAME RBarkley FBower MScott
DATE 2/22/17 2/27/17 2/27/17
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Salem Inspection / Activity Plan 01/01/2017 - 12/31/2018 Page 1 of 2 02/02/2017 15:51:37 71124
- RAD PROTECTION
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 01/09/2017 01/13/2017 1, 2 IP Occupational ALARA Planning and Controls 71124.02 01/09/2017 01/13/2017 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 01/09/2017 01/13/2017 1, 2 IP Radiation Monitoring Instrumentation 71124.05 01/09/2017 01/13/2017 EP
- EP PROGRAM INSPECTION
1, 2 IP Alert and Notification System Testing 7111402 06/05/2017 06/09/2017 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 06/05/2017 06/09/2017 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/05/2017 06/09/2017 1, 2 IP Performance Indicator Verification 71151 06/05/2017 06/09/2017 7111108P
- U2 INSERVICE INSPECTION
2 IP Inservice Inspection Activities - PWR 7111108P 04/24/2017 05/05/2017 71124
- RAD PROTECTION
2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/01/2017 05/05/2017
IP Occupational ALARA Planning and Controls 71124.02 05/01/2017 05/05/2017 7111121M
- DESIGN BASES ASSURANCE INSPECTION (TEAM)
1, 2 IP Component Design Bases Inspection (Teams)
7111121M 06/26/2017 06/30/2017 1, 2 IP Component Design Bases Inspection (Teams)
7111121M 07/10/2017 07/14/2017 7111111B
- SALEM REQUAL INSP WITH P/F RESULTS
1, 2 IP Licensed Operator Requalification Program - Annual Review 7111111A 09/12/2017 09/16/2017 1, 2 IP Licensed Operator Requalification Program 7111111B 09/12/2017 09/16/2017 71152B
- PI&R BIENNIAL
1, 2 IP Problem Identification and Resolution 71152B 08/14/2017 08/18/2017 1, 2 IP Problem Identification and Resolution 71152B 08/28/2017 09/01/2017 1/22EXM
- SALEM INITIAL EXAM
1 FY18-SALEM INITIAL OPERATOAR LICENSING EXAM U01949 12/11/2017 12/15/2018
FY18-SALEM INITIAL OPERATOAR LICENSING EXAM U01949 01/22/2018 02/02/2018 71124.06
- RETS
1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/28/2017 09/01/2017 71124
- RAD PROTECTION
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/23/2017 10/27/2017
IP Occupational ALARA Planning and Controls 71124.02 10/23/2017 10/27/2017 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Salem Inspection / Activity Plan 01/01/2017 - 12/31/2018 Page 2 of 2 02/02/2017 15:51:37 7111108P
- U1 INSERVICE INSPECTION
1 IP Inservice Inspection Activities - PWR 7111108P 10/23/2017 11/03/2017 71124.08
- RADWASTE
1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 12/04/2017 12/08/2017 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 12/04/2017 12/08/2017 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 12/04/2017 12/08/2017 7111105T
- TRIENNIAL FIRE PROTECTION
1, 2 IP Fire Protection [Triennial]
7111105T 02/12/2018 02/16/2018 1, 2 IP Fire Protection [Triennial]
7111105T 02/26/2018 03/02/2018 71124
- BASELINE HP
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/26/2018 03/02/2018 1, 2 IP Occupational ALARA Planning and Controls 71124.02 02/26/2018 03/02/2018 1, 2 IP Occupational Dose Assessment 71124.04 02/26/2018 03/02/2018 EP
- EP EXERCISE INSPECTION
1, 2 IP Exercise Evaluation 7111401 05/21/2018 05/25/2018 7111117T
- 50.59 PROCESS
1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 04/30/2018 05/04/2018 71124
- BASELINE HP
1, 2 IP Occupational ALARA Planning and Controls 71124.02 05/21/2018 05/25/2018 1, 2 IP Occupational ALARA Planning and Controls 71124.02 05/21/2018 05/25/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/21/2018 05/25/2018 71124.07
- REMP
1, 2 IP Radiological Environmental Monitoring Program 71124.07 06/25/2018 06/29/2018 71124.06
1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 09/10/2018 09/14/2018 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 09/10/2018 09/14/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 09/10/2018 09/14/2018 U2 ISI
- UNIT 2 INSERVICE INSPECTION
2 IP Inservice Inspection Activities - PWR 7111108P 10/22/2018 11/02/2018 71124
- BASELINE HP
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/29/2018 11/02/2018
IP Occupational ALARA Planning and Controls 71124.02 10/29/2018 11/02/2018 1, 2 IP Occupational Dose Assessment 71124.04 10/29/2018 11/02/2018 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.