ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000272/2013006 and 05000311/2013006
ML13240A089
Person / Time
Site: Salem  
Issue date: 09/03/2013
From: Glenn Dentel
Reactor Projects Branch 3
To: Joyce T
Public Service Enterprise Group
DENTEL, GT
References
IR-13-006
Download: ML13240A089 (5)


Text

September 3, 2013

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 (REPORT 05000272/2013006 AND 05000311/2013006)

Dear Mr. Joyce:

On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Salem). The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2012 through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Salem operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Salem during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e, green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2014.

Routine inspections performed by resident inspectors are not included in the inspection plan.

In addition to baseline inspections, the NRC will perform Temporary Instruction 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. We note that on July 26, 2013, the NRC issued a letter to PSEG on the potential impact of a U.S. District Court jury finding of retaliation on the work environment at Salem and Hope Creek.

We are currently in the process of reviewing your August 22, 2013, response to that letter and will notify you of the results of that review.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5233 with any questions you have regarding this letter.

Sincerely,

/RA/

Glenn T. Dentel Chief Projects Branch 3 Division of Reactor Projects

Docket Nos.: 50-272, 50-311 License Nos.: DPR-70, DPR-75

Enclosure: Inspection Plan

cc w/encl: Distribution via ListServ

ML13240A089 SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP

NAME mmt PFinney/ PF via email MDraxton/ MD GDentel/ GTD

DATE 08/ 26/13 08/ 26/13 09/ 03 /13

Page 1 of 2 08/05/2013 11:35:12 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Salem Inspection / Activity Plan 07/01/2013 - 12/31/2014 PI&R

- PI&R

1, 2 IP Problem Identification and Resolution 71152B 07/15/2013 07/19/2013 1, 2 IP Problem Identification and Resolution 71152B 07/29/2013 08/02/2013 7111111B

- SALEM REQUAL INSPECTION WITH P/F RESULTS

1, 2 IP Licensed Operator Requalification Program 7111111B 09/16/2013 09/20/2013 HP

- RADIATION SAFETY INSPECTION

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 08/12/2013 08/16/2013 1, 2 IP Occupational ALARA Planning and Controls 71124.02 08/12/2013 08/16/2013 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 08/12/2013 08/16/2013 1, 2 IP Occupational Dose Assessment 71124.04 08/12/2013 08/16/2013 1, 2 IP Radiation Monitoring Instrumentation 71124.05 08/12/2013 08/16/2013 7111117

- PERMANENT PLANT MODIFICATIONS

1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 11/04/2013 11/08/2013 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 11/18/2013 11/22/2013 7111107T

- TRIENNIAL HEAT SINK

1, 2 IP Heat Sink Performance 7111107T 12/02/2013 12/06/2013 71124.08

- RADWASTE

1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 12/02/2013 12/06/2013 HP

- RADIATION SAFETY INSPECTION

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 12/09/2013 12/13/2013 1, 2 IP Occupational ALARA Planning and Controls 71124.02 12/09/2013 12/13/2013 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 12/09/2013 12/13/2013 1, 2 IP Occupational Dose Assessment 71124.04 12/09/2013 12/13/2013 1, 2 IP Radiation Monitoring Instrumentation 71124.05 12/09/2013 12/13/2013 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 12/09/2013 12/13/2013 71124

- RAD SAFETY INSPECTION

2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/03/2014 03/07/2014

IP Occupational ALARA Planning and Controls 71124.02 03/03/2014 03/07/2014

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/03/2014 03/07/2014

IP Occupational Dose Assessment 71124.04 03/03/2014 03/07/2014 1, 2 IP Radiation Monitoring Instrumentation 71124.05 03/03/2014 03/07/2014 71124

- RAD SAFETY INSPECTION

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/21/2014 04/25/2014 1, 2 IP Occupational ALARA Planning and Controls 71124.02 04/21/2014 04/25/2014 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 08/05/2013 11:35:12 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Salem Inspection / Activity Plan 07/01/2013 - 12/31/2014 71124

- RAD SAFETY INSPECTION

1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/21/2014 04/25/2014 1, 2 IP Occupational Dose Assessment 71124.04 04/21/2014 04/25/2014 1, 2 IP Radiation Monitoring Instrumentation 71124.05 04/21/2014 04/25/2014 7111108P

- U2 INSERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 04/21/2014 05/02/2014 71124

- REMP

1, 2 IP Radiological Environmental Monitoring Program 71124.07 05/19/2014 05/23/2014 EP EXER

- EP EXERCISE INSPECTION

1, 2 IP Exercise Evaluation - Hostile Action (HA) Event 7111407 05/19/2014 05/23/2014 TI-182

- DEGRAD UNDERGROUND PIPING - PHASE 2

1, 2 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 06/02/2014 06/06/2014 CDBI

- CDBI

1, 2 IP Component Design Bases Inspection 7111121 07/07/2014 07/10/2014 1, 2 IP Component Design Bases Inspection 7111121 07/21/2014 07/25/2014 1, 2 IP Component Design Bases Inspection 7111121 08/04/2014 08/08/2014 12/8EXAM

- SALEM INITIAL EXAM

1 FY15-SALEM INITIAL OPERATOR LICENSING EXAM U01894 11/10/2014 11/14/2014

FY15-SALEM INITIAL OPERATOR LICENSING EXAM U01894 12/08/2014 12/19/2014 INSP

- RADIATION PROTECTION

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/29/2014 10/03/2014 1, 2 IP Occupational ALARA Planning and Controls 71124.02 09/29/2014 10/03/2014 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/29/2014 10/03/2014 1, 2 IP Occupational Dose Assessment 71124.04 09/29/2014 10/03/2014 1, 2 IP Radiation Monitoring Instrumentation 71124.05 09/29/2014 10/03/2014 7111108P

- U1 INSERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 10/20/2014 10/31/2014 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.