IE Insp 50-309/80-02 on 800121-25.Noncompliance Noted: Failure to Establish,Review & Implement Procedure for Baling Machine
ML19318A608
Person / Time
Site: Maine Yankee
Issue date: 02/14/1980
From: Knapp P, Thonus L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19318A568 List:
References
50-309-80-02, 50-309-80-2, NUDOCS 8006230452
Download: ML19318A608 (8)


Text

r,

'

.

.

,

(U U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No. 50-309/80-02 Docket No. 50-309 License No. DPR-36 Priority Category C

--

Licensee:

Maine Yankee Atomic Power Compan L 20 Turnpike Road Westborough, Massachusetts 01581 Facility Name:

Maine Yankee Nuclear Generatina Station Inspection at:

Wiscasset, Maine Inspection conducted:

January 21-25, 1980 Inspectors:

s

-

-

O

'

L.' H. Thonus, Radiation Specialist date signed date signed g

~K date signed

-

O Ek Dym 14 klo \\Clf(O Approved by:

,,

P. J. Knapp, Chief, Radiation Sl1 date signed

,

Section, FF&MS Branch l

_Ipspection Summary:

Inspection on January 21-25, 1980 (Report No. 50-309/80-02)

Areas Inspected:

Routine, unannounced inspection by a regional based inspector of radiation protection during refueling including licensee action on IE circulars, procedures, advanced planning and preparation, training, exposure control, respiratory protection, posting and control, facility tours, and surveys.

Upon arrival, a tour of the radiation control area was performed to observe radiation safety practices. The inspection involved 36 inspector-hours on site by one NRC regional based inspector.

Results: Of the nine areas inspected, one item of noncompliance was identified in one area (failure to establish procedures - paragraph 3).

.

Region I Form 12 (Rev. April 77)

800625 gg

.

__

._

_ _ _. _ - ~

_

. _ _

_-

- - _ -.

'

.o

.

,

,

B

-DETAILS

.l.

Persons Contacted The inspector contacted the following licensee technical and supervisory

'

personnel.

' Mr. R. ' Arseneult, Assistant Operations Department Head

  • Mr. G. Cochrane, Radiological Controls Supervisor Mr. F. Erskine, Radiological Controls Foreman Mr. R. Forrest, Fire Protection and Plant Services Supervisor Mr. R.-Hanley, Shift Supervisor
  • Mr. C. Frizzle, A3sistant Plant Superintendent Mr. W. Paine, Operations Department Head Mr. G. Pillsbury, Health and Safety Director
  • Mr. S. Sadosky, Quality Assurance Coordinator (YAEC)
  • Mr. J. Stevens, Chemistry Supervisor

.

  • Mr. D. Sturniolo, Technical Assistant to the Plant Superintendent Mr; M.'Swartz, Training Supervisor Mr. E. Wood, Plant Superintendent The inspector also interviewed several other licensee and contractor employees including maintenance, security, operations and radiation

.

protection personnel.

i

  • denotes those individuals present at the exit interview on January 25, 1980.

2.

Licensee Action on IE Circulars

'

The inspector reviewed licensee actions taken in response to IE Circulars 79-09 and 79-15.

70-09 - The licensee does not use the models of self-contained

--

breathing apparatus (SCBA) described in the circular.

The licensee

'

-does useother models of SCBA's made by.another manufacturer; the licensee examined these and found nc malfunctions with regulator diaphragms. The inspector had no further questions.

79-15 - The licensee does not use the equipment described in the

--

circular or analogous equipment of another manufacturer. The inspector had no further questions.

11o items of_ noncompliance or deviations were identified.

l l

l

.

,-.

-

...

_ - _ _ _,

-

. -,. -,, -

,

-

-

-

- -

-

_.

_, - _

a

~c.,

.

'3.

Procedures TechnicalSpecification(TS)

5.8.1 requires, in part, that " Written

. procedures shall be established, implemented and maintained covering...the applicable procedures recommended in Appendix "A" of Regulatory Guide

,

1.33,~ November, 1972."

TS 5.8.2 states that, "Each procedure of 5.8.1 above, and changes

~thereto, shall be reviewed by'the PORC and approved by the (Plant

'

' Superintendent) prior to implementation and reviewed periodically as

!

set _forth in administrative procedures."

~

TS 6.11 states that, " Procedures for personnel radiation protection shall be preparea~ consistent with the requirements of 10 CFR Part 20 and shall be approved, maintained and adhered to for all operatians involving personnel radiation exposure."

-

The inspector reviewed several licensee procedures against the above

_ criteria including:

,

Radiation Protection Procedure 9.1.2, " Respiratory Protection

--

Program."

-

Radiation Protection Procedure 9.1.10 " Radiation Work Pennits."

--

Radiation Protection Procedure 9.1.11, " Health Physics Procedure

--

for Refueling and Outages."

Radiation Protection Procedure 9.1.12, "Use of Personnel Monitoring

--

Devices."

,

The inspector made several tours 'of the radiation control area (RCA)

.to observe adherence to the above procedures. While in the waste processing area, the inspector noted that the licensee had installed a new baling machine used to compact baleable waste (shoe covers, rags, paper items, etc.) in 4 ft. by(number 4 ft. by 8 ft. wooden boxes. The most recent radiation work permit 80-1-191) used to provide radio-i logical controls on work on this machine was reviewed.

The inspector

,

discussed procedural control of the apparatus with several licensee representatives and found that the licensee had no procedure governing its use.. The inspector noted that since a procedure for the operation of such equipment was listed in Appendix "A" of Regulatory Guide 1.33, November,1972 an approved procedure had to be implemented in order to fulfill the requirements of Technical Specifications (TS) 5.8.1 and 5.8.2.

The Faling machine was in use during the period.lanuary 14-18, i

1980. Tiie inspector identified the failure to establish, review and implement a procedure-for the baling machine as noncompliance with TS 5.8.1'and 5.8.2.

(50-309/80-02-01)

i n

(

, -,.

.

,. - - -

,.... - - - - _..,.,.

-

,

., -, -. _.

'

,

.

4.

Advanced Planning and Preparations a.

Increased Staffing The licensee increased the radiation protection staffing for the refueling outage with the addition of approximately 20 contractor personnel. The inspector interviewed several contractor senior radiation protection technicians who were in responsible positior.s and reviewed their training and qualifications.

b.

Access and Control Points The licensee had established several control points for the outage, e.g. at the entrance to the containment.

These points were used for access control, radiation work permit posting, logging of dosimeter results and as protective clothing check points.

c.

Job and Exposure Planning The inspector reviewed the licenseek plans for steam generator primary side inspection includir.g, exposure control and airborne activity control. The inspector also reviewed some of the licensee's installation and planning of temporary and permanent shielding.

,

The licensee had also put up temporary fences to exclude access

'

to areas of the containment which would have exposure rates greater than 1 R/hr during fuel movement.

No items of noncompliance or deviations were identified.

5.

Training The inspector attended a course given to workers to fulfill the require-ments of 10 CFR 19.12, " Instructions to Workers." The course consisted of video tapes followed by a lecture and a question and answer period.

A written examination was then administered.

Training records of 17 contractor workers who had entered the radiation control area (RCA) or were allowed access to the RCA were examined.

No items of noncompliance or deviations were identified.

!

.

.

h

. _,

.n

__

-

-

_ _ _ _ _ _ _ _ _ -

...

.

,

,

.

'

6.

Exposure Control The ' inspector. reviewed the licensee's method of complying with 10 CFR

,

'20.202(a) which requires the licensee to provide personnel monitoring equipment to and require the use of such equipment by certain classes

'

of personnel..The licensee routinely issues and requires the use of thermoluminescent dosimeters (TLD's) and self-reading (dosimeters (SRD)

by all personnel entering the radiation control area RCA) except tour groups.

j

.The licensee is required by 10 CFR 20.102 to obtain exposure estimates of their current calendar quarter exposures from all incoming employees and contractors prior to their first entry into the restricted area if the employee is likely to exceed 25% of the 10 CFR 20.101(a) exposure limits. The inspector examined the exposure estimates of 11 contractors

-

who had entered the licensee's RCA during the current refueling outage.

Whole body exposures of individuals are limited to 1.25 rems per calendar quarter by 10 CFR 20.101(a) unless the requirements of 10 CFR

!

20.101(b) and 10 CFR 20.102 are fulfilled.

These include limiting exposure to 3 rems per quarter, limiting lifetime exposure and deter-

>

mining previous exposure on Forrr NRC-4 or equivalent. As of January 24, 1980, the exposures of two workers had exceeded 1.25 rem for the-quarter. The inspector determined that the rcquirements of 10 CFR 20.101(b) and 10 CFR 20.102 hed been fulfilled prior to the exposures of these individuals exceedir.g 1.25 rem.

No exposures had exceeded

-

the limits of 10 CFR 20.10ll,b).

No items of noncompliance or deviations were identified.

7.

Respiratory Protection a.

Use of Engineering' Controls A variety of engineering controls including fuel integrity; oxygen addition to the primary coolant and extensive recirculation,

,

demineralization, and filtration of primary coolant; and use of air filters in plant ventilation kept airborne activity concentra-

tions below the values in 10 CFR 20, Appendix B, Table I, Column

I.

b.

~ Bioassay I

The licensee maintains a chair type whe~ie body counter onsite which has a 3" by 3" NaI crystal for counting the whole body and a tl" by lh" NaI crystal ~ for counting the thyroid.

A multi-

.

.

-

-

. -.

,.. _ -..

...

.

_.

_ _ _.. _ _..,, -

.

--

,

  • .

o

channel analyzer and minicomputer are used for peak search and radionuclide analysis. The licensee routinely counts all incoming personnel prior to work assignment in the RCA and all personnel at_ the termination of their work assignments in the RCA.

The inspector reviewed the whole body count results of 6 individuals who had terminated in January, 1980.

No body burdens were observed which would exceed 2% of the 10 CFR 20.103(a)(1) limits.

c.

' Air' Sampling The inspector reviewed results of particulate and iodine air surveys taken during January,1980 on all levels of the auxiliary building, fuel handling building and containment building. Beta-gama counting indicated results less than 10% of the concentra-tions listed in 10 CFR 20, Appendix B, Table I, Column I.

At the time of the inspection, alpha spectral analysis of January, 1980 E3h"ndtherehadbeen air samples had not been performed.

I

    • ""

P" **##

coolant samples had shown traces of Np a

other indicators of fuel leakage, the inspector noted that there was the possibility of transuranic elements contributing to airborne activity, particularly when the primary coolant system was opened for maintenance. The licensee's onsite counting system can count gross alpha but does not have the capability for alpha spectroscopy. The licensee normally sends samples for alpha spectroscopy to a vendor who provides approximately 10 day turna-round for analysis. On January 23, 1980, the licensee sent several samples including air samples and a disc smear of the inside of the reactor head to another cct.nting facility which could provide rapid turnaround. On January 24, 1980, the results were received by teghone$4ghey. indicated that small quantities of transuranics (Pu

, Cu

) were present 'n the head and in air samples. The quantities present in the air samples were below the concentrations listed in 10 CFR 20., Appendix B, Column I, Table I.

The inspector stated that the adequacy of the licensee's air survey program would be unresolved pending the evaluation of the results of quantitative isotopic analyses of air samples and evaluation of the licensee's ability to obtain quantitative isotopic analyses in a timely fashion with regard to work which would involve the potential for airborne transuranics.

(50-309/80-02-02)

l l

_,. -.

- - -.

- - _.

_

_

_ _ - _ _ _ - _ _ - _ _ _ _ - _ _

.

.

.

d.

Respirator Training, Fitting and Usage The inspector reviewed the portion of the licensee's training program dealing with full facepiece filter masks. The licensee's man-fit program was examined; it includes fit testing in an aerosol test booth. At the time of the inspection, very few respirators were in use due to low levels of general airborne activity and the nature of the jobs in progress was such that few had significant potential for producing airborne activity.

-No items of noncompliance or deviations were identified.

,

8.

Posting and Control The inspector examined posting and control of radiation areas, high radiation areas, contaminated areas, and radioactive material areas against the criteria in Technical Specification (TS) 5.12,10 CFR 20.203 and licensee procedures. Administrative control of keys to certain high radiation areas is required by TS 5.12.2.

The inspector examined the keys under the control of the shift supervisor and the key issue log book. Approximately 20 locked high radiation doors were checked and found satisfactory.

No' items of noncompliance or deviations were identified.

9.

Fa:ility Tour The inspector made several tours of the radiation control area and examined several control points where dosimetry devices were stored and issued, radiation work permits prepared and personnel checked in and out of the containment and refueling building.

The inspector also toured the licensee's counting facilities; and observed and interviewed technicians operating the equipnient. Approximately 20 radiation and contamination survey meters were examined for calibration dates, as were approximately 50 self-reading dosimeters.

Housekeeping and storage and labeling of radioactive materia! was observed.

Personnel were observed for adherence to licensee procedures and radiation work permit (RWP) requirements.

Independent measurement were made of selected licensee radiation surveys and area postin;;

No items of noncompliance or deviations were identified.

i

.

<

-

.

.

10. Surveys The inspector reviewed licensee surveys of the containment building for the period January 14-25, 1980 including radiation, contamination, and airborne activity surveys against the criteria in the licensee's survey procedures and 10 CFR 20.201.

Surveys taken in support of several outage activities including inservice inspection (ultrasonic testing) of the primary loop piping and the inspection of secondary

' side of the steam generators were also reviewed.

No items of noncompliance or deviations were identified.

11. Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items, items of noncompliance, or deviations. An unresolved item disclosed during the inspection is discussed in Paragraph 7.

12.

Exit ~ Interview

.

The inspector met with licensee management representatives (denoted in Paragraph 1) at the conclusiois of the inspection on January 25, 1980.

The inspector summarized the purpose and scope of the inspection and the findings.

Licensee representatives stated that either onsite alpha analytical capability or a nearby laboratory with rapid turnaround time would be used for alpha analys'is during the outage.

The representa-tives also stated that air samples would be analyzed for alpha activity prior to steam generator eddy current testing.

,