IR 05000306/1980014
| ML19339B046 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 09/18/1980 |
| From: | Finley A, Hind J, Patterson J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML19339B041 | List: |
| References | |
| 50-306-80-14, NUDOCS 8011060218 | |
| Download: ML19339B046 (1) | |
Text
rm N]
.
-
U.S. NUCLEAR REGULATORY COMMISSION
,
OFFICE OF INSPECTION AND ENFORCEMENT
,
REGION III
Report No. 50-306/80-14 Docket No. 50-306 License No. DPR-60 Safeguards Group IV Licensee: Northern States Power Company 414 Nicollet Mall Minneapolis, MN 55401 Fatility Name: Prairie Island Nuclear Generating Plant, Unit 2 Inspection At: Prairie Island Nuclear Generating Plant, Red Wing, MN Inspection Conducted: September 3-5, 1980 Type of Inspection: Unannounced Material Control and Accountability Inspectors:
/g 80
- *
7 M G. Finley Auditor Date Q.G M 9)r/ro W. P. Patterson Chemist Date Appre/ed By:
[
/D
.
K A. Hind, Chief, Safeguards Branch Date Inspection Summary Areas Inspected: Nuclear material control and accountability requirements of module 85102. The seven areas inspected were Facility Organization and Operation, Measurements and Controls, Shipping and Receiving, Storage and Internal Control Inventory. Records and Reports and Management of Material Control System. The inspection involved 40 inspection-hours onsite by two NRC inspectors and was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirements in the seven areas examined during the inspection.
(Details Part 2.790(d) Information)
8011oeoplT