IR 05000298/1980003
| ML19309F219 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 04/07/1980 |
| From: | Caldwell R, Evans C, Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML19309F214 | List: |
| References | |
| 50-298-80-03, 50-298-80-3, NUDOCS 8004290011 | |
| Download: ML19309F219 (2) | |
Text
O~-
8o0429o du
U. S. NUCLEAR RECULATORY COMMISSION OFFICE OF INSPECTIJ AND ENFORCEMENT
REGION IV
Report No. 50-298/80-03 License No. DPR-46 Docket No. 50-298 Safeguards Group IV Licensee:
Nebraska Public Power District P. O. Box 499 Columbus, Nebraska 68601 Facility Name:
Cooper Nuclear Station Inspection at:
Brownsville, Nebraska Inspection Conducted: March 17-20, 1980 Date of Last Physical Security Inspection Visit: October 16-19, 1979 Type of Inspection: Unannounced Physical Seciruty Inspectors:
/w/M 4/7 /F4 R. A. Caldwell, Security / Investigation Date Specialist 0 ObiOb10 bnLMA-.
4l'7/20-C. Abigafl Evans, Security / Specialist (Intern)
/ Ddte
//w/
y/7/['d Approved by:
G. L. Madsa.n, Chief, Reactor Operations and Date Nuclear Support Branch Inspection Summary Areas Inspected:
Included review of Security Plan; Security Organization; Physical Barriers (Protected Area); Physical Barriers (Vital Areas); Access Control (Search); Access Control (Escorting); Alarm Station; Communications, Assessment Aids; Compensatory Measures; Power Supply; Records and Report,
..
The inspection involved 62 inspector hours onsite by two NRC inspectors.
The inspection was begun during a regular shift with two inspector hours being accomplished offsite and six inspector hours were completed during offshift periods.
Results: The licensee was found to be in compliance with NRC requirements within the 12 areas examined during the inspection.