IR 05000295/1982015

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 50-295/82-15 on 820615-18.No Noncompliance Noted.Major Areas Inspected:Facility Organization & Operation,Measurements & Control,Shipping & Receiving.Details Withheld (Ref 10CFR2.790)
ML20055A045
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 07/02/1982
From: Creed J, Finley A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19262G496 List:
References
50-295-82-15, NUDOCS 8207150424
Download: ML20055A045 (1)


Text

k'

.

.

.

U.S. NUCLEAR REGULATORY C0 Fit!ISSION

REGION III

Report No. 50-295/82-15(DETP)

Docket No. 50-295 License No. DPR-39 Safeguards Group IV Licensee: Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name:

Zion Nuclear Power Station, Unit 1

nspection At:

Zion Site, Zion, IL

/

Inspection Conducted:

June 15-18, 1982 Date of Last ?!aterial Control and Accounting Inspection:

tiay 29-31, 1979 Type of Inspection: Unannounced Blaterial Control and Accounting ff J

Inspector:

'

.

A/ G. Fuiley

/ bate abditor

W Approved By:

.

R. Creed, Chief

/ /Date fcguards Section Inspection Summary:

Inspection on June 15-18, 1982 (Report No. 50-295/82-15(DETP))

Areas Inspected:

Facility Organization and Operation, tieasurements and Control, Shipping and Receiving, Internal Controls, Records and Reports, and Blanagement of Flaterial Control System. The inspection involved 28 inspection-hours onsite by one NRC inspector and was begun during regular hours.

Results: The licensee was found to be in compliance with NRC requirements in the six areas examined during the inspection.

(Details - 2.790(d) Information)

fhhhK05000295 EA 820702 G

PDR

,