IR 05000293/1990011

From kanterella
Jump to navigation Jump to search
Exam Rept 50-293/90-11OL on 900423-24.Exam Results:All Operators Passed Reexam
ML20042G796
Person / Time
Site: Pilgrim
Issue date: 05/04/1990
From: Conte R, Todd Fish
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20042G795 List:
References
50-293-90-11OL, NUDOCS 9005160105
Download: ML20042G796 (4)


Text

-

.

.

.

.

>

.

U. S. NUCLEAR REGULATORY. COMMISSION

REGION I

Report No.

50-293/90-11(OL)

Docket No.

50-293

,

License No.

-DPR-35

,

Licensee:

Boston Edison Company RFD #1 Rocky Hill Road Plymouth, Massachusetts 02360 Facility Name:

Pilgrim Nuclear Power Station

.i

Examination Date: April 23-24, 1990 Requalification Re-examination Chief Examiner:

A b

U

n Todd H. Fish, Sr. Operations Engineer ate ba r/t//d?o Reviewed by:

m f Kichard Jf Conte, Chief BWR Section

'date

~

1 "yOperations Branch, DRS i

EXAMINATION SUMMARY:

Examination on April 23-24, 1990 Examination Report

'

50-293/90-11(0L)

!

.

I Requalification re-examinations were administered to one crew, one Senior Reactor Operator (SRO) (dynamic simulator portion), one Reactor Operator (RO)

(dynamic simulator portion) and one R0 (written exam portion).

These operators had failed those portions of the requalification examinations

,

administered during the weeks of December 4 and 11, 1989. All. operators passed the re-examinations.

The facility was effective in remediating the operators with respect to their previous examination results.

l

'

,

,

O 90031601g:5900509ADOK0500$3

'

{DR

r

>

.

.

,

.

b

!

DETAILS e

1.

Introduction

One SRO and one RO were re-examined in the dynamic: simulator portion of the requalification examination and one RO was re-examined in the written W

portion. These operators had failed those portions of'the examinations administered during the weeks of December 4 and 11, 1989.. The examiner

'

used the procer.s described in NUREG 1021, " Operator Licensing Examiner Standard," Rev 5., Section ES-601, " Administration of.NRC Requaliciation

.

Program Evaluations." The personnel contacted during the examination are

!

listed in Attachment 1.

,

2.

Examination Results

'

.The following is a summary of the individual examination' NRC results:

TYPE OF EXAMINATION:

Requalification

.

,

l NRC l

R0 l

SR0 l

TOTAL l

!

l Grading l

Pass / Fail-l Pass / Fail l Pass / Fail I!

l I

l I

.

l l Written l

1-/ 0 l

N/A l

1- / 0

,

I i

1

!

l I

l l

l Simulator l 1/0 l

1/0 l

2/0 I

I

.

I

'

i-I Walk l

l l

l l Through l

N/A l-N/A l

N/A

-

l l

l l

l l

l-t l Overall l

2/0 l

1/0 l-3/0 l

l l

l

i No generic strengths or weaknesses were noted.

!

3.

Exit Meeting An exit meeting was held at the conclusion of the examination on April 24, 1990. The personnel in attendance are-listed in Attachment

1.

The NRC preliminary results of the examinations were presented.-

l Requalification Examination administration was discussed as indicated

'

in this report.

(

.

ATTACHMENTS 1.

Persons contacted e

2.

Written re-examination test items

,

(;

-

.

t

.

.

.

ATTACHMENT 1 Persons Contacted Boston Edison Company K. Highfill, Station Director (2)

L. Olivier, Operations Manager..

(1,2)

T. Sullivan, Chief Operating. Engineer (2)

F. Famulari. Quality Assurance Manager (2)

J. Kelly, Sr. Compliance Engineer

_

.(2)

J. Alexander, Training Department Manager (1,2)

. H. Balfour, Operator Training Manager (1,2)

T. Swan, Operations Training Supervisor (1,2)

M. Santiago, Sr. Training Instructor (1,2)

E. Olson, Training' Instructor (1,2)

R. Bolduc, Training Instructor (1,2)

G. Sherman, Training Instructor (1)

Notes l

(1) attended entrance meeting (2) httended exit meeting i

i

'

.I /(g,

.

..

,

.

.

~~',

,f,

. ~(

.

'

  • .

p

.,

,

,

<,

-

j p

'l

.

~ ATTACHMENT 2'

'i

Dynamic simulator'Re-examination Test Items:

SES-001A-

' Loss of RPS Bus /Gp I isolation SES-009A.

Loss of all high pressuie injecti'n'

.

-

o f

F Written Re-examination Test Items -

J Part A j

-

-

%

,,

Static Simulator #1

QNUM QVAL'

i

2.0-t

2.0

2.0

'

l

.4 2.0-

!

5-2.0

'i

.

2.0 1'

Total-12.0 i

.

Static Simulator #2

.

'

QNUM QVAL

2.0

-

,

2.0

'j

-

2.0

2.0

!

2.0

~.

. 2.0

'l Total 12.0

.- t Part B i

j Open Reference Questions

't QNUM QVAL r

=

2.0

2.0

-

~3 2.0

-2. 0

2.0

2.0

2.0-8-

2.0

2.0

2.0

2.0

2.0

2.0

2.0'

-2.0

2.0 Total D

"

.,-