.N-NUCLEAR REGULATORY COMMISSION c-j,s
.
.{
! *[!
i,0GION IV o
Gli RYAN PLAZA DRIVC, SUliE 400
?,
AHLINGT ON, TE X AS 76011 0064 y
JAN I i 1994 Docket:
50-285 i.icense:
.
Omaha Public Power District ATTN:
T. L. Patterson, Division Manager Nuclear Operations Fort Calhoun Station' FC-2-4 Adm.
P.O. Box 399, Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399 SUBJECT:
SERVICE WATER SYSTEM OPERATIONAL PERFORMANCE INSPECTION -
REPORT NO. 50-285/94-04 As stated in our December 17, 1992, letter, we are planning to conduct a
,
Service Water System Operational Performance Inspection (SWSOPI) at your Fort Calhoun Station.
We have scheduled this inspection for the period from May 10 through June 10, 1994.
The inspection schedule was discussed with Mr. R. Short of your staff on January 6, 1994.
-
The inspection will be conducted in accordance with Temporary Instruction 2515/118, " Service Water System Operational Performance
Inspections (SWSOPI)," Revision 1.
The inspection team will consist of the
'
team leader, three inspectors, and a mechanical design consultant.
In order to implement an efficient inspection, the team would like to conduct a short entrance meeting with those involved members of your staff on May 10,
<
1994. The team would appreciate a short (1-hour) presentation on the design, operation, and history of the service water system at the conclusion of the entrance meeting.
The team will spend the remainder of the first week in meetings with members of your staff to identify documentation needs and in.
completing the necessary training to support unescorted access to the facility for the NRC personnel.
The team. leader will request an escort for the consultant.as necessary.
Attached to this letter is a list of materials that the team will require for the inspection.
We request that the material be available for the team on~
'
May 10, 1994.
..
1300:.'d i
l 9401140020 940111 I
PDR ADOCK 05000285
G PDR
'
,
-.-
-
_.. _.
-. -..
.
-
-
..
_ _
_ _ _ _ _ _ - _
.u,
.
Omaha Public Power District-2-
,
Should you have any questions on the inspection or the requested material, I
please contact Mr. P. Wagner at (817) 860-8127.
Sincerely, Director i
.
Division of Reactor Safety
.
I Attachment: As stated cc w/ attachment:
LeBoeuf, Lamb, Leiby & MacRae
>
ATTN: Mr. Michael F. McBride 1875 Connecticut Avenue, NW Washington, D.C.
20009-5728 Washington County Board of Supervisors ATTN: Jack Jensen, Chairman Blair, Nebraska 68008 Combustion Engineering, Inc.
ATIN: Charles 8. Brinkman, Manager Washington Nuclear Operations 12300 Twinbrook Parkway, Suite 330
,
Rockville, Maryland 20852 Nebraska Department of Health ATTN:
Harold Borchert, Director Division of Radiological Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007 Fort Calhoun Station ATTN: James W. Chase, Manager P.O. Box 399 Fort Calhoun, Nebraska 68023
l i
-
...
..
.
-.-
.
-
. -. -
-
.
..
-1
'
o.5
Omaha Public Power District-3-JAN I i 1994 E-Mail report to D. Sullivan (DJS)
bcc to DMB (IE01)
bcc distrib. by RIV:
J. L. Hilhoan Resident Inspector DRP Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNFB 4503 MIS System DRSS-FIPS RIV File Project Engineer (DRP/D)
Section Chief (DRP/TSS)
P. Wagner T. Westerman J. Pellet G. Imbro, NRR, MS: 9Al C. McCracken, NRR, MS: 801 DRS
..
!
RIV:It:DRSh DD.:DRSd D:DRP h D: PRS 3
/
-
-
~
.
PCWagner:dlf ATHowell ABBeachku
[JCdllins 1/g/94 1/h94 1/ \\\\/94 b[
i i
- }
.-
l
=,
,
Omaha Public Power District-3-JAN I i 1994 I
!
E-Mail report to D. Sullivan (DJS)
bec to DMB (IE01)
bec distrib. by RIV:
J. L. Milhoan Resident Inspector
'
DRP Section Chief (DRP/D)
_;
Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS RIV File
,
Project Engineer'(DRP/D)
Section Chief (DRP/TSS)
P. Wagner T. Westerman J. Pellet G. Imbro, NRR, MS: 9Al C. McCracken, NRR, MS: 801 DRS
-
.
!
i
!
,
!
?
I i
i
-
i
,
.
~_ I
'
_ _ _, -
. -
RIV:TL:DRSh DD:DRSrd D: DRPH D:%
l
/'Cdllins PCWagner:dlf ATHowell ABBeachko/
J i
1/;t/94 1/h94 1/ \\\\/94 b4 i
?
i
,
, _. -
,..
,
_
_____-.
.
,
,
]
ATTACHMENT LIST OF MATERIALS TO SUPPORT THE SWSOPI l
1.
Service Water System (SWS) descriptions and associated P& ids;
,
2.
Design basis and other design documents (procurement specifications and
vendor manuals for pumps, valves, heat exchangers, etc.; thermal and
'
hydraulic calculations and analyses);
,
3.
Pump curves and test results data; l
4.
Flow and heat transfer test results. data;
,
t 5.
Licensing basis, Technical Specifications, and commitments; l
'
6.
Water hammer and surge pressure protection information and analyses; 7.
A copy of the completed preoperational testing program results and copies of any subsequently completed system tests not included in the above requests; e
8.
Descriptions of all modification to the SWS; 9.
Documentation relevant to the analyses, testing, procedure changes, and
,
inspections of the SWS credited for satisfying the actions requested by Generic Letter 89-13;
,
10.
Normal, off-normal, and emergency operating procedures;
>
,
11.
Maintenance and surveillance (including ISI and IST) procedures;
,
12.
Information on the SWS training provide for maintenance and operations l
personnel including lesson plans, task performance measures, etc.;
13.
Maintenance histories of major SWS components, the status of maintenance
!
and surveillance that were overdue, and a listing of all such activities that are scheduled to be conducted during the inspection period;
,
14.
Drs.;iiptions of the programs for the control of biofouling, silting, and corrosion, including the involved implementing procedures; and
,
t 15.
A description of the scope, findings, and conclusions of any service
water system QA audits and any other self-assessment activities.
l I
'