SUBJECT:
SURRY POWER STATION - SECURITY BASELINE INSPECTION REPORT 05000280/2025403 AND 05000281/2025403
Dear Eric Carr:
On September 18, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Surry Power Station and discussed the results of this inspection with Geoffrey Hill and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket Nos. 05000280 and 05000281 License Nos. DPR-32 and DPR-37
Enclosure:
As stated,
Inspection Report
Docket Numbers:
05000280 and 05000281
License Numbers:
Report Numbers:
05000280/2025403 and 05000281/2025403
Enterprise Identifier:
I-2025-403-0012
Licensee:
Virginia Electric & Power Company
Facility:
Surry Power Station
Location:
Surry, VA
Inspection Dates:
September 15, 2025, to September 18, 2025
Inspectors:
M. Denman, Physical Security Inspector
D. Egelstad, Physical Security Inspector
J. Tornow, Physical Security Inspector
Approved By:
Jannette G. Worosilo, Chief
Nuclear Security Branch
Division of Fuels, Radiological Safety, and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Surry Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
The inspector evaluated the access control program through completion of the following
inspection elements: Access Control
- (1) Tier I: 02.01 (a,c,d,e), 02.02 (a - g), 02.04 (a,b,d,e), 02.05 (a), 02.06
- (c) Tier II: 02.08
- (e) Tier III: 02.09
71130.05 - Protective Strategy Evaluation
The inspectors evaluated the licensee's protective strategy through completion of the following
procedure elements: Protective Strategy Evaluation
- (1) Tier I: 02.01 (b - d); 02.02 (a - f); 02.04 (b, d, e).
Tier II: 02.06 (a, b, d, f, g, i, n); 2.07
- (a) Tier III: 02.08; 02.09 (a, b).
- (2) Observed two licensee conducted force-on-force exercises
71130.09 - Security Plan Changes
The inspector evaluated the security plan changes through completion of the following
procedure elements: Security Plan Changes
- (1) Since the last NRC baseline inspection of this program area, Security Plan Revision 37 to 38 was implemented. Based on Virginia Electric & Power Company evaluation, and in accordance with 10 CFR 50.54(p)(2), the changes resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan changes continue to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of those changes. Therefore, the changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification The inspector verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)
- (1) April 2024 - August
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified that no proprietary information was retained or documented in this report.
- On September 18, 2025, the inspectors presented the security baseline inspection results to Geoffrey Hill and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
CR1270401
CR1295161
CR1288148
CR1294422
CR1295204
CR1297260
CR1297441
CR1298053
CR1298330
CR1298678
Security Core and Key Rotation
04/13/2022
Visitor Log
09/25/2025
Miscellaneous
Projected On-Site
09/01/2025-
09/30/2025
Control of Safeguards Information, Security-Related
Information, and Controlled Unclassified Information
Revision 22
Search Programs
Revision 5
Owner Controlled Area Access Control
Revision 3
Protected Area Access Control
Revision 7
Procedures
SY-AA-SCPIP-024
Compensatory Measures
Revision 3
Self-Assessments
Audit 25-01
Audit of Security
3/19/2025
Miscellaneous
Annual FOF & Quarterly TRD Documentation
Surry Physical Security Plan
Revision 38
Alarm Response
Revision 2
Security Threat Assessment
Revision 1
SY-AA-SCPIP-017
Waterborne Threat
Revision 1
SY-AA-SCPIP-018
Coordinated Land Vehicle Bomb Attack
Revision 1
SY-AA-TR-201
Security Drill and Exercise
Revision 17
Procedures
SY-AA-TR-204
Security Challenge Drill and Evaluations
Revision 2
Self-Assessments
Nuclear Oversight
Audit
Dominion Energy Audit 25-01-Security
3/19/2025
Nuclear Fleet Physical Security Plan (Surry)
Revision 37
Procedures
Nuclear Fleet Physical Security Plan (Surry)
Revision 38
71151
Miscellaneous
Physical Protection Cornerstone Data Sheet (samples)
25