IR 05000278/1985022

From kanterella
Jump to navigation Jump to search
Summarizes Enforcement Conference Detailed in Insp Rept 50-278/85-22 on 850621.Major Areas Inspected:Possibility of Licensed Operator Asleep on 850610.No Enforcement Action Planned.Actions Required within 30 Days
ML20128K964
Person / Time
Site: Peach Bottom 
Issue date: 07/17/1985
From: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
EA-85-075, EA-85-75, NUDOCS 8507240253
Preceding documents:
Download: ML20128K964 (2)


Text

_ _.

N

-

-

..

.

,-

d JUL 171985

-

'

e Docket No. 50-278 Licen'se No. DPR-56 EA 85-75

' Philadelphia Electric Company ATTN:

Mr.-S. L.-Daltroff Vice President Electric Production 2301 Market Street

' Philadelphia, Pennsylvania <19101 Gentlemen:

Subject:

Enforcement Conference (Inspection 50-278/85-22)

On June 21, 1985, an enforcement conference was conducted with you, members of your staff, one of your-licensed operators at Peach Bottom, and members of the NRC Regional and Headquarters staff to discuss events which occurred on June 10, 1985 at Peach Bottom, Unit 3.

On that day, an NRC inspector observed the licensed' reactor operator at the controls of Unit 3 with his eyes apparently

- closed, thereby giving the appearance of being inattentive to his duties as a licensed reactor operator. These events are documented in NRC Inspection Report No. 50-278/85-22 dated June 18, 1985.

At the enforcement conference, the operator maintained that he was not asleep and not inattentive to his duties, but only relaxing his eyes. However, he acknowledged that he exercised poor judgment in maintaining his appearance once he-was aware of the NRC inspector in the control room. During the enforcement conference, you described your investigation of these events, and your actions taken to prevent recurrence. We were impressed by the candor of the operator and your thorough investigation and initiation of corrective actions. Accordingly,

no enforcement action is planned against you or the licensed operator regarding these events.

However, based upon conversations with my staff, I concur with your finding that a negative attitude toward the NRC by some of the licensed operators at Peach Bottom may have contributed to these events. Although you acknowledged the importance of your personnel maintaining a positive attitude in dealings

__ ' -

with the NRC, PEco apparently has not been totally successful in fostering such can attitude. We expect the actions that you described at the enforcement conference should improve this attitude.

Please document these actions in a written response to Region I within 30 days of the date of this letter.

8507240253 850717 PDR ADOCK 05000278.

s PDR OFFICIAL RECORD COPY CP PKG PB 85/75 2 - 0005.1.0 07/15/85

'

,s

.

-, _ - -

. _ _

_

--

.

,

-o Philadelphia Electric Company

The response requested by this office is not subject to the clearance procedures of the Office of Management and Budget, as required by the Paperwork Reduction Act of 1980, PL 96-511.

Sincerely,

Thomas E. Murley Regional Administrator cc:

R. S. Fleischmann, Station Superintendent John S. Kemper, Vice President, Engineering and Research Troy B. Conner, Jr., Esquire A. J. Pietrofitta, General Manager, Power Production Engineering, Atlantic

,

Electric Eugene J. Bradley, Esquire, Assistant General Counsel-(Without Report)

Raymond L. Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

,

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania Distribution Docket 55-8685 (with concurrences)

{

Section Chief, DRP JMTaylor, IE RVo11mer, IE JAAxelrad, IE TPoindexter, IE JLieberman, ELD

-

TMurley, RI Enforcement Coordinators RI RII, RIII, RIV, RV

->

IE:ES File IE:EA File

'

hC-

.

%

ES:Ri $ DRSS:RI

RI RI D:DRP:RI RC(k i

DHolody DFlorek Collins o

RStarostecki JGul 'i Mrez J

1,pn 6/g3/85 6/7.d85 6/ d'85 6/

6/1E/85 6s?,h/85 6/@/85 IE:ES SGI ELD ES:D IE:DD IE:D

/lWurley JLieberman JAAxelrad RVo11mer JMTaylor j

TPoindexter 7/ /85

/85 7/ /5 7/

7/ /85 7/

8f;

'

0FFICIAL REC OPY CP P,G PB 85/75 2 - 0006.0.0 07j15/85

.

da 's 9 p4~ f

"

7/7 sjy

._