IR 05000275/1988004

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/88-04 & 50-323/88-03 on 880208-22 & Notice of Violation.Addl Mgt Attention Required on Procedure Compliance & Fulfillment of Commitment to NRC
ML16342B421
Person / Time
Site: Diablo Canyon  
Issue date: 03/11/1988
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341E585 List:
References
NUDOCS 8803290010
Download: ML16342B421 (6)


Text

ACCELERATED DISHUBUYION DEMONSTRATION SYSTEM REGULATORY INFORMATION DXSTRIBUTION SYSTEM (RIDS)

CESSION NBR:8803290010 DOC.DATE: 88/03/11 NOTARIZED: NO DOCKET I ACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit. 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH.NAME AUTHOR AFFILIATION PATE,R.J.

Region 5, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION SHXFFER,J.D.

Pacific Gas

& Electric Co.

SUBJECT:

Forwards Xnsp Repts 50-275/88-04

& 50-323/88-03 on 880208-22

& notice of violation.

DISTRIBUTION CODE:

IEOID COPIES RECEIVED:LTR ENCL J SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES:

D S

RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS DEDRO NRR/DLPQ/PEB11B NRR/DOEA DIR11E NRR/DREP/RPB10A NRR/PMAS/ILRB12 OGC 15-B-18 RES/DRPS DIR ERNAL: LPDR NSIC COPIES LTTR ENCL

1

'2

1

1

1

2

1

1

1

2

1

RECIPIENT ID CODE/NAME ROOD,H AEOD NRR MORISSEAU,D NRR/DLPQ/QAB10A NRR/DREP/EPBlOD NRR/DRIS DIR9A2 OE~IEB, J G

RGN5 FILE

NRC PDR COPXES LTTR ENCL

2

1

1

1

1

1

1

1

1

1

'D D

R S

A

, TOTAL NUMBER OF COPIES REQUIRED:

LTTR

ENCL

MAR i

)ggg Docket Nos.

50-275 and 50-323 Pacific Gas and Electric Company 77 Beale Street Room 1451 San Francisco, California 94106 Attention:

Mr. J.

D. Shiffer, Vice President Nuclear Power Generation Gentlemen:

SUBJECT:

NRC INSPECTION OF DIABLO CANYON NUCLEAR POWER PLANT (DCPP)

This refers to the routine inspection conducted by Mr.

C.

A. Clark of this office on February 8 through February 22, 1988, of activities authorized by NRC License Nos.

DPR-80 and DPR-82, and to the discussions of our findings held by Mr. Clark with members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection report.

Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that two of your activities were not conducted in full compliance with the NRC requirements, as set forth in the Notice of Violation, enclosed herewith as Appendix A.

Your response to this notice is to be submitted in accordance with the provisions of 10 CFR 2.201, as stated in the Notice of Violation.

In addition to the two violations identified in this report, we direct your attention to the discussions in paragraph 2.d.

on procedure compliance and fulfillment of a commitment to the NRC.

These two areas appear to require additional management attention.

In accordance',:with,10 CFR 2.790(a),

a copy of this letter and the enclosure will be placed 'in the NRC Public Document Room.

~,4'

The response%directed by this letter and the accompanying notice is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

88032900i0 88031i PDR ADOCK 05000275

DCD

/LOS

-2" MAR fi 1ssa Should you have any questions concerning this inspection, we will be glad to discuss them with you.

Sincerely, Robert

. Pate, Chief Reactor Safety Branch

Enclosures:

1.

Notice of Violation - Appendix A 2.

Inspection Report Nos.

50-275/88-04 and 50-323/88-03

REGION V==

CCl ark/dot.;;.-, AJohn on 3/ t /88 f778 ', 3/'t 88 MMendonca 3/ c//88 SRichards 3/'5 /88 R ate 3/Il/88 EST COPY )

REQUEST Y )

R EST COPY )

EST COPY )

EST COPY )

YES /

NO YES /

N ES /

NO ES /

NO YES /

NO TO PDR

)

ES NO