IR 05000267/1982005

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-267/82-05
ML20052G750
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 05/18/1982
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lee O
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20052G751 List:
References
NUDOCS 8205180636
Download: ML20052G750 (1)


Text

.

.

$$ N/a Fo Docket:

50-267/82-05 Public Service Company of Colorado ATTN:

Mr. Oscar R. Lee, Vice President Electric Production P. O. Box 840 Denver, CO 80201 Gentlemen:

Thank you for your letter dated April 15, 1982, in reply to our letter and Notice of Violation dated March 17, 1982.

We have no further questions at this time and will review your corrective actions during a future inspection.

Sincerely, signed by:

C. L. M A D S EN" P

G. L. Madsen, Chief Reactor Project Branch 1 D. W. Warembourg, Nuclear Production Manager Fort St. Vrain Nuclear Station P. O. Box 368 Platteville, CO 80651 J. Gahm, Quality Assurance (Same address)

bcc to DMB (IE01)

bcc distrib. by RIV:

BC T. Westerman PM W. Dickerson AE00 G. Plumlee ELD E. Johnson IE FILE TPB IE/RPRIB RPB2 NRR/DHFS INFO SYSTEMS NRR/0LB J. Collins RAD ASMT BR RIV File RESEARCH COLORADO STATE DEPT. HEALTH POR:HQ LPDR NSIC D/IESh

-

RPB1 DRRP

/RIV 5/ft 5/lb /82

_l bO/

lia do EHJohnson T Y.

TWes an/dsm GMafs n JGag/8E l

5/4.'52 5/)/82 q

-

s Yf1Y jj

'

!

820s 18 0 G 36

l C