IR 05000267/1980022

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-267/80-22 on 801020-22.No Noncompliance Noted.Major Areas Inspected:Security Program & Organization, Protected Area Physical Barriers & Access Control.Details Withheld (Ref 10CFR2.790)
ML20002B525
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 11/25/1980
From: Caldwell R, Kelly J F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20002B523 List:
References
50-267-80-22, NUDOCS 8012110784
Download: ML20002B525 (1)


Text

-_

. _ _ -

,

.

,

O U. S. NUCLEAR REGULATORY COR'4ISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION IV

Report No. 50-267/80-22 License No. CPR-34 Licensee:

Public Service Company of Colorado Facility Name:

Fort St. Vrain Nuclear Generating Station Inspection at:

Platteville Colorado Inspection Conducted: October 20-24, 1980 Date of Last Physical Security Inspection: August 18-22, 1980 Type of Inspection:

Unannounced Physical Security Inspector:

.(h. (dhw b - 77A V KNov &b R. A. Caldwell J

'

Date Physical Security / Investigation Specialist M

Adeo $c)

Approved by:

/

'

.

J mes'A. F. Kelly A

Date C.. _ ~, Physical Security Branch Insoection Summary Areas Inscected:

Iacluded a review of the Security Program Audit; Security Organization, Protected Area Physical Barriers; Vital Area Physical Barriers; Access Control (Identification, Authorization and Badging); Access Control (Search); Access Control (Escorting); Access Control (Vital Areas); Alarm Stations; Assessment Aids; Testing and Maintenance; Power Supply; Response; Locks, Keys and Comoinations; Records and Reports.

l The inspection involved sixty-eight (68) inspector-hours by two (2) NRC inspectors including 12.5 inspection hours accomplished during off-shift periods.

The inspection began during the off shift.

Results:

The licensee was found to be in compliance with NRC requirements i.

witnin the areas examined during the inspection.

i e

    • 12 11 o 7t$