IR 05000263/1977020

From kanterella
Jump to navigation Jump to search
Insp Rept 50-263/77-20 on 771025-26.No Noncompliance or Deviations Noted.Major Areas Inspected:Turnover Insp
ML20024G575
Person / Time
Site: Monticello 
Issue date: 11/03/1977
From: Choules N, Harpster T, Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20024G571 List:
References
50-263-77-20, NUDOCS 9102120687
Download: ML20024G575 (2)


Text

_

__

_

.-.- -..

-

- - _.

.- __-

..

L

,

,

  • (

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REC 10N III Report No. 50-263/77-20

.

Docket No. 50-263 License No. DPR-22 Licensee Northern States Power Company 414 Nicollet Mall Minneapolis, MS $5401 Tacility Name Monticello Nuclear Power Plant inspection at:

Monticello Site, Monticello, MN Inspection Conducted: October 25-26, 1977

-

Inspectors:

N.

ul

// 3._22._

RFtO fn-T. L. Harpster

_/ / 7)

<

wa Approved by:

R. T. k'arnick, Chief

_M 8/72

'

Reactor Projects Section 2 In,spection Summary In spec t ion on _0c t ober_25 _2_6, 19_7_7_,(Report No. 50-263/77-2R A_r,eas Inspected _ Special, announced turnover inspection by two NRC inspectors onsite October 25-26, 1977, and at the corporate office on October 26, 1977. The inspection involved 20 inspector-hours by two NRC inspectors.

Results: No items of noncompliance or deviations were identified.

9102120687 771104 PDR ADOCK 05000263 o

PDR

.

.

..

__

. _ _... _

..

...

...

. -.. -

.. ~.

,

_ _ _ _ _ - _ - - - - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _

_

-

_ _ _ _ _ _ _ _ _ _ _ _ - _.

_.

_ - _ - - _ - _ _.

_ _. _

_ _ _ _ _ _ _ _

.

l

.

,'(

DETAILS i

1.

Persons Contacted Onsite L. R. Eliason, Plant Superintendent M. H. Clarity, Superintendent, Plant Engineering and Radiation Protection

.

W. E. Anderson, Superintendent. Operations and Maintenance H. E. Himo, Maintenance Supervisor S. L. Pearson, Operations Supervisor D. D. Antony, P3 ant Engineer, Operations W. A. Shamla, Plant Engineer Technical F. L. Fey, Radiation Protection Engineer H. H. Kendall, Plant Office Supervisor P. A. Pochop, Quality Assurance Engineer R. L. Scheinost, Quality Assurance Engineer The inspectors also talked with several other licensee site employees and members of the Safety Audit Committee.

i 2.

Persons._ Con _ tact _ed_at Corpo, rate Office L. J. Wachter, Vice President - Power Production D. Cf1berts, General Manager of Power Production (

T. McFadden, General Superintendent, Quality Assurance l

R. S. Leddick, Manager, Nuclear Plant Services The inspectors also talked with several other licensee employees at the corporate office.

3.

Mr. Terry L. Harpster was introduced to the site and corporate office personnel as the newly assigned project inspector.

4.

The inspectors observed a portion of the setup of the feedwater nor:1e milling machine. The licensee had removed the stainless steel cladding from three nozzles at the time of the inspection and was wetting up on the fourth and last nozzle.

.

-2-i

_

_

.