SUBJECT:
PALISADES NUCLEAR PLANT - CYBER SECURITY INSPECTION REPORT 05000255/2025405
Dear Mike Mlynarek:
On September 10, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palisades Nuclear Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
Due to the temporary cessation of government operations, which commenced on October 01, 2025, the NRC began operating under its Office of Management and Budget-approved plan for operations during a lapse in appropriations. Consistent with that plan, the NRC operated at a reduced staffing levels throughout the duration of the shutdown.
However, the NRC continued to perform critical health and safety functions and make progress on other high-priority activities associated with the ADVANCE Act and Executive Order 14300.
On November 13, 2025, following the passage of a continuing resolution, the NRC resumed normal operations. However, due to the 43-day lapse in normal operations, the Office of Nuclear Reactor Regulation granted the Regional Offices an extension on the issuance of the calendar year 2025 inspection reports that should have been issued by November 13, 2025, to December 31, 2025. The NRC resumed the routine cycle of issuing inspection reports on November 13, 2025.
No findings or violations of more than minor significance were identified during this inspection.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
December 18, 2025 The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).
The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely, Jasmine A. Gilliam, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket No. 05000255 License No. DPR-20 Enclosure:
As stated cc: S. Summers, Site Security Manager Palisades Nuclear Plant T. R. Wentworth, State Liaison Officer, State of Michigan cc w/o encl: Distribution via LISTSERV Sanchez Santiago, Elba signing on behalf of Gilliam, Jasmine on 12/18/25
ML25351A274 (Cover letter w/ enclosure(s))
ADAMS ACCESSION NUMBER: ML25351A275 (Cover letter)
Entire Report:
SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter Only:
SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RIII RIII NAME KFay for ADahbur:sw ESanchez Santiago for JGilliam DATE 12/18/2025 12/18/2025