IR 05000255/2005012

From kanterella
Jump to navigation Jump to search
Errata to Palisades Nuclear Plant NRC Integrated Inspection Report 05000255-05-012
ML060340294
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/02/2006
From: Christine Lipa
NRC/RGN-III/DRP/RPB4
To: Harden P
Nuclear Management Co
References
IR-05-012
Download: ML060340294 (6)


Text

ary 2, 2006

SUBJECT:

ERRATA TO PALISADES NUCLEAR PLANT NRC INTEGRATED INSPECTION REPORT 05000255/2005012

Dear Mr. Harden:

On January 25, 2005, the U. S. Nuclear Regulatory Commission (NRC) issued integrated Inspection Report 05000255/2005012 (ML060300256). Several paragraphs were inadvertently omitted from the original report. The enclosed errata contains the missing information and should be inserted where appropriate into Integrated Inspection Report 05000255/2005012.

We apologize for any inconvenience to you and your staff.

Sincerely,

/RA/

Christine A. Lipa, Chief Projects Branch 4 Division of Reactor Projects Docket No. 50-255 License No. DPR-20 Enclosure: Errata to Inspection Report 05000255/2005012 See Attached Distribution

DOCUMENT NAME:E:\Filenet\ML060340294.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME CLipa:dtp DATE 02/02/06 OFFICIAL RECORD COPY cc w/encl: J. Cowan, Executive Vice President and Chief Nuclear Officer R. Fenech, Senior Vice President, Nuclear Fossil and Hydro Operations D. Cooper, Senior Vice President - Group Operations L. Lahti, Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel and Secretary A. Udrys, Esquire, Consumers Energy Company S. Wawro, Director of Nuclear Assets, Consumers Energy Company Supervisor, Covert Township Office of the Governor L. Brandon, Michigan Department of Environmental Quality -

Waste and Hazardous Materials Division Michigan Department of Attorney General ADAMS Distribution:

HKN LMP RidsNrrDirsIrib GEG KGO JAL3 JAE CAA1 C. Pederson, DRS (hard copy - IRs only)

DRPIII DRSIII PLB1 JRK1 ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)

ERRATA TO NRC INTEGRATED INSPECTION REPORT 05000255/2005012 1. On Page 19, below the line that reads 4. OTHER ACTIVITIES (OA) insert the following:

4OA1 Performance Indicator Verification (71151)

Cornerstones: Occupational and Public Radiation Safety

.1 Radiation Safety Strategic Area a. Inspection Scope The inspectors sampled the licensees Performance Indicator (PI) submittals for the periods listed below. The inspectors used PI definitions and guidance contained in Revision 3 of Nuclear Energy Institute Document 99-02, Regulatory Assessment Performance Indicator Guideline, to verify the accuracy of the PI data. The following PIs were reviewed:

  • Occupational Exposure Control Effectiveness:

The inspectors reviewed the licensees assessment of the PI for occupational radiation safety, to determine if indicator related data was adequately assessed and reported during the previous four quarters. The inspectors compared the licensees PI data with the condition report database, reviewed radiological restricted area exit electronic dosimetry transaction records, and conducted walkdowns of accessible locked high radiation area entrances to verify the adequacy of controls in place for these areas. Data collection and analysis methods for PIs were discussed with licensee representatives to determine if there were any unaccounted for occurrences in the Occupational Radiation Safety PI as defined in Revision 3 of Nuclear Energy Institute Document 99-02, Regulatory Assessment Performance Indicator Guideline. This sample was credited in Integrated Report 50-255/2005-006.

  • Radiological Environmental Technical Specification/Offsite Dose Calculation Manual (RETS/ODCM) Radiological Effluent Occurrences:

The inspectors reviewed data associated with the RETS/ODCM PI to determine if the indicator was accurately assessed and reported. This review included the licensees condition report database for the previous four quarters, to identify any potential occurrences such as unmonitored, uncontrolled or improperly calculated effluent releases that may have impacted offsite dose. The inspectors also selectively reviewed gaseous and liquid effluent release data and the results of associated offsite dose calculations and quarterly PI verification records generated over the previous four quarters. Data collection and analyses methods for PIs were discussed with licensee representatives to determine if the process was implemented consistent with industry guidance in Revision 3 of Nuclear Energy Institute Document 99-02, Regulatory Assessment Performance Indicator Guideline. This review represented one sample.

b. Findings No findings of significance were identified.