MONTHYEARIR 05000250/20240102024-01-0505 January 2024 Focused Engineering Inspection 05000250/2024010 and 05000251/2024010 IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 IR 05000250/20234022023-06-12012 June 2023 Security Baseline Inspection Report 05000250/2023402 and 05000251/2023402 IR 05000250/20233012023-05-17017 May 2023 NRC Operator License Examination Report 05000250/2023301 and 05000251/2023301 IR 05000250/20230012023-05-12012 May 2023 Integrated Inspection Report 05000250/2023001 and 05000251/2023001 IR 05000250/20220062023-03-0101 March 2023 Annual Assessment Letter for Turkey Point, Units 3 & 4 (Report 05000250/2022006 and 05000251/2022006) IR 05000250/20220042023-01-27027 January 2023 Integrated Inspection Report 05000250/2022004 and 05000251/2022004 IR 05000250/20220112022-12-20020 December 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000250/2022011 and 05000251/2022011 IR 05000250/20220102022-11-29029 November 2022 Triennial Fire Protection Inspection Report 05000250/2022010 and 05000251/2022010 IR 05000250/20224022022-11-0707 November 2022 Security Baseline Inspection Report 05000250 2022402 and 05000251 2022402 IR 05000250/20220032022-10-31031 October 2022 Integrated Inspection Report 05000250/2022003 and 05000251/2022003 ML22286A1262022-10-28028 October 2022 Review of the Fall 2021 Steam Generator Tube Inspections During Refueling Outage No. 32 IR 05000250/20234012022-10-19019 October 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000250/2023401 and 05000251/2023401 IR 05000250/20220052022-08-26026 August 2022 Updated Inspection Plan for Turkey Point Units 3 & 4 Report 05000250 2022005 and 05000251 2022005-Final ML22229A5332022-08-18018 August 2022 Notification of Target Set Inspection and Request for Information (NRC Inspection Report No. 05000250 2022402 and 05000251 2022402) IR 05000250/20220022022-08-12012 August 2022 Integrated Inspection Report 05000250/2022002 and 05000251/2022002 IR 05000250/20220012022-05-11011 May 2022 Integrated Inspection Report 05000250/2022001 and 05000251/2022001 L-2022-072, Steam Generator Tube Inspection Report2022-05-0606 May 2022 Steam Generator Tube Inspection Report IR 05000250/20224012022-03-0808 March 2022 Security Baseline Inspection Report 05000250/2022401 and 05000251/2022401(U) IR 05000250/20210062022-03-0202 March 2022 Annual Assessment Letter for Turkey Point, Units 3 and 4 (Report No. 05000250/2021006 and 05000251/2021006) IR 05000250/20210042022-02-0202 February 2022 Integrated Inspection Report 05000250/2021004 and 05000251/2021004 IR 05000250/20210032021-11-0303 November 2021 Integrated Inspection Report 05000250/2021003 and 05000251/2021003 IR 05000250/20210072021-11-0303 November 2021 Follow-Up Assessment Letter Report 05000250/2021007 IR 05000250/20210402021-09-30030 September 2021 95001 Supplemental Inspection Report 05000250/2021040 and 05000251/2021040 IR 05000250/20210052021-08-25025 August 2021 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2021005 and 05000251/2021005) IR 05000250/20210022021-08-0404 August 2021 Integrated Inspection Report 05000250/2021002 and 05000251/2021002 IR 07200062/20210012021-07-21021 July 2021 Operation of an Independent Spent Fuel Storage Installation Report 07200062/2021001 IR 05000250/20214012021-06-11011 June 2021 Security Baseline Inspection Report 05000250/2021401, 05000251/2021401, and 07200062/2021401 IR 05000250/20210012021-05-0707 May 2021 Integrated Inspection Report 05000250/2021001 and 05000251/2021001 and Assessment Follow-Up Letter IR 05000250/20210122021-05-0505 May 2021 Biennial Problem Identification and Resolution Inspection Report 05000250/2021012 and 05000251/2021012 IR 05000250/20214202021-04-29029 April 2021 Security Baseline Inspection Report 05000250/2021420 and 05000251/2021420 Cover Letter IR 05000250/20213012021-04-10010 April 2021 NRC Operator License Examination Report 05000250/2021301 and 05000251/2021301 IR 05000250/20210902021-04-0606 April 2021 Notice of Violation and Proposed Imposition of Civil Penalty $150,000, NRC Inspection Report Nos.05000250/2021090 and 05000251/2021090; Investigation Report Nos. 2-2019-011 and 2-2019-025 Exercise of Enforcement Discretion IR 05000250/20200062021-03-0303 March 2021 Annual Assessment Letter for Turkey Point Nuclear Plant, Unit 3 and Unit 4 Report 05000250/2020006 and 05000251/2020006 IR 05000250/20210102021-02-26026 February 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000250/2021010 and 05000251/2021010 IR 05000250/20204022021-02-12012 February 2021 Material Control and Accounting Program Inspection Report 05000250/2020402 and 05000251/2020402 Public Version (Cover Letter Only) IR 05000250/20200042021-02-11011 February 2021 Integrated Inspection Report 05000250/2020004 and 05000251/2020004 and Independent Spent Fuel Storage Installation Inspection (ISFSI) 07200062/2020002 IR 05000250/20210112021-02-0404 February 2021 NRC Inspection Report 05000250/2021011 and 05000251/2021011, and Investigation Report 2-2019-025; and Apparent Violations IR 05000250/20204012020-12-14014 December 2020 Security Baseline Inspection Report 05000250/2020401 and 05000251/2020401 IR 05000250/20200502020-12-0909 December 2020 Special Inspection Report 05000250/2020050 and 05000251/2020050 IR 05000250/20200032020-11-0404 November 2020 Integrated Inspection Report 05000250/2020003 and 05000251/2020003 IR 05000250/20200022020-08-10010 August 2020 Integrated Inspection Report 05000250/2020002, 05000251/2020002, and Independent Spent Fuel Storage Installation Inspection (ISFSI) 07200062/2020001 IR 05000250/20200112020-07-23023 July 2020 NRC Inspection Report 05000250-2020011 and 05000251-2020011 and Investigation Report 2-2019-011; and Apparent Violation Final IR 05000250/20200012020-05-0707 May 2020 Integrated Inspection Report 05000250/2020001 and 05000251/2020001 IR 05000250/20204112020-04-17017 April 2020 Cyber Security Inspection Report 05000250/2020411 and 05000251/2020411 IR 05000250/20200102020-03-30030 March 2020 Design Basis Assurance Inspection (Teams) Inspection Report 05000250/2020010 and 05000251/2020010 IR 05000250/20190042020-01-30030 January 2020 Integrated Inspection Report 05000250/2019004 and 05000251/2019004 and Independent Spent Fuel Storage Installation Inspection (ISFSI) Report 07200062/2019001 2024-01-05
[Table view] |
Text
February 17, 2004 INSPECTION SUMMARY - TRIENNIAL FIRE PROTECTION INSPECTION AT TURKEY POINT NUCLEAR PLANT Report Number: 50-250, 251/2004007 Onsite Inspection Dates: 1/26-30/04 and 2/9-13/04 Inspection Team: Charlie Payne (team lead, operations); Gerry Wiseman (fire protection); Paul Fillion (electrical)
Accompanying Personnel: Kathleen O'Donohue, Team Leader; Necota Staples (electrical-training); Esperanza Espana, Visiting Inspector (Spain)
Scope: Routine Triennial Fire Protection Inspection, per IP 71111.05, focusing on selected fire areas/zones listed below. Selected fire areas included: Fire Zone 63 (Fire Area T) - Unit 3 Rod Control Equipment/3B MCC Room, +18 f level. Fire barriers in this area consist of 3-hour rated fire walls, the floor and the ceilin Fire detection includes ionization smoke detectors. Manual suppression is provided by the fire brigade. A severe fire in this area would involve a shutdown of Unit 3 from the main control room. Fire Zone 67 (Fire Area U) - Unit 4 Train B 4160V Switchgear Room, +18 ft. leve Fire barriers in this area consist of 3-hour rated fire walls, the floor and the ceiling. Fire detection includes ionization smoke detectors. Manual suppression is provided by the fire brigade. A severe fire in this area would involve a shutdown of Unit 4 from the main control room. Fire Zones 106 and 106R (Fire Area MM) - Unit 3 and Unit 4 Main Control Room, +42 ft. level. Fire barriers in this area consist of 3-hour rated fire walls, the floor and the ceiling. Fire detection includes ionization smoke detectors. This is a normally occupied space with manual suppression initially provided by the control room operators and later by the fire brigade. A severe fire in this area would involve a shutdown of both Unit 3 and Unit 4 from the main control room.
There were six inspection findings and five other issues identified.
FINDINGS 1) Failure to periodically test the auto start feature (on loss of power) for the TD fire pump.
2) Height of the curbs for some oil-retention basins are not sufficient to contain the entire contents of storage tanks.
3) Failure to identify that the RWST suction valve (LCV-3/4-11 5B) was subject to spurious operation. Applies to both FZ 63 and FZ 6 ) Failure to prevent spurious operation of thermal barrier cooling suction valve (MOV-4-626). Applies to FZ 67. (Licensee identified, but failed to take timely corrective action)
5) Failure to maintain adequate fire detector capability to ensure fire detection at the incipient stage. Applies to FZ 6 ) Local manual operator action to prevent spurious operation of a thermal barrier cooling water containment isolation valve (MOV-3/4-71 6A) was not timely to preclude RCP seal package damage. Applies to FZ 106.
7) Failure to install detection and fixed suppression in FZ 97. Part of the MCR envelop OTHER ISSUES 1) Assured operator access through security doors to various rooms and compartments during performance of local manual operator actions.
2) Assured operator access through specific locked security doors (no key card access available) during MCR evacuation local manual operator actions.
3) Unapproved local manual operator actions that were found to be feasible. (Licensee identified)
4) Procedure guidance allowing 20 minutes to complete local manual operator actions to restore RCP seal package cooling rather than 13 minutes as specified for similar condition during SBO events. (Licensee identified, but failed to take timely corrective action)
Inspection Successes:
1) Continue to experience a good synergistic working relationship between inspectors.
2) Developed new line of inquiry regarding operator access controls during fires.
Inspection Challenges:
1) Understanding the licensing basis in fire protection still continues to be problemati Licensee is arguing that the are only committed to select sections of NFPA codes but have no record as to which sections they are.
2) Scope of inspection is greater than inspection resources. Reducing sample size (included in new revision to IP 71111.05) will assure thorough review of area(s) selected.
3) The licensee is committed to using the EOPs as overall operating guidance during response to fire. Fire response procedures are lower tier documents (off-normal procedures) used as guidance only. Where conflicts between these procedures occur, the EOPs would have priority - despite the need to take some actions to protect safe
- .
shutdown at the cost of reducing normal redundancy and reliability of ECCS equipmen This leaves the licensee vulnerable to actions contrary to SSD analysis and places high reliance on operator training and decision-making. The team found no basis to refute the licensee's approach but noted it was contrary to nearly all the rest of the industr ) The licensee's Ignition Source Data Sheets (ISDS) from the IPEEE contain skimpy information and are not adequate to support an SDP analysis in the fire protection are The licensee's risk analyst was aware of this and stated improvement plans would be implemented, within budget constraint Suggested areas of routine inspection focus:
Consider effects of room and compartment access controls when evaluating an operator's ability to successfully perform local manual operator action