IR 05000250/2025402
| ML25147A242 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 05/29/2025 |
| From: | Jannette Worosilo NRC/RGN-II/DFRSS |
| To: | Coffey R Florida Power & Light Co |
| References | |
| IR 2025402 | |
| Download: ML25147A242 (1) | |
Text
SUBJECT:
TURKEY POINT NUCLEAR GENERATING, UNITS 3&4 - SECURITY BASELINE INSPECTION REPORT 05000250/2025402 AND 05000251/2025402
Dear Robert Coffey:
On May 22, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Turkey Point Nuclear Generating, Units 3&4 and discussed the results of this inspection with Roger Montgomery and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket Nos. 05000250 and 05000251 License Nos. DPR-31 and DPR-41
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000250 and 05000251
License Numbers:
Report Numbers:
05000250/2025402 and 05000251/2025402
Enterprise Identifier:
I-2025-402-0024
Licensee:
Florida Power & Light Company
Facility:
Turkey Point Nuclear Generating, Units 3&4
Location:
Florida City, FL
Inspection Dates:
May 19, 2025 to May 22, 2025
Inspectors:
J. Justice, Senior Physical Security Inspector
J. Stovall, Physical Security Inspector
D. Egelstad, Physical Security Inspector
Approved By:
Jannette G. Worosilo, Chief
Nuclear Security Branch
Division of Fuels, Radiological Safety, and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Turkey Point Nuclear Generating,
Units 3&4, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
inspection elements: Access Control
- (1) Tier I: All Requirements Tier II: 02.06(b,c), 02.07(a), 02.08(a,c,e,f,i)
Tier III: 02.09
71130.04 - Equipment Performance, Testing, and Maintenance
The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from IP:
Equipment Performance, Testing, and Maintenance (1 Sample)
- (1) Tier I: All Requirements Tier II: 2.09(a,b), 2.11(d), 2.12(a) Tier III: 2.14, 2.15(a,c)
71130.07 - Security Training
The inspectors evaluated the security training program through completion of the following
procedure elements: Security Training
- (1) Tier I: All Requirements Tier II: 02.05(b,c), 02.06(a,b), 02.07(a), 02.09(b)
Tier III: 02.10, 02.11(a), 02.12(a), 02.13(a), 02.14(a)
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following procedure elements:
Security Plan Changes (1 Partial)
(1)
(Partial)
The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2) since the last performance of this IP.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)
- (1) May 2024 - April
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On May 22, 2025, the inspectors presented the security baseline inspection results to Roger Montgomery and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
2501224
2513500
2513937
2506069
Corrective Action
Documents
Resulting from
Inspection
2515868
2515910
2515911
2515816
2515817
2515819
0-ADM-406
Security Key and Lock System
Revision 1
PTN-SY-001
Emergency Evacuation and Accountability
Revision 3
PTN-SY-003
PA Access Control
Revision 15
PTN-SY-032
PA Access During Drills and Emergencies
Revision 3
PTN-SY-033
Containment Access Control
Revision 4
PTN-SY-034
Control, Issue, and Display of Badges
Revision 1
Safeguards Information Program
Revision 22
Security Badge Issue Control and Use
Revision 6
Conduct of Personnel Searches
Revision 18
Vehicle and Material Searches
Revision 16
Visitor Access Control
Revision 13
Escorting Vehicles and Material
Revision 5
Procedures
Controlling Gates and Vehicle Barriers
Revision 5
Corrective Action
Documents
2497700
2502547
2498827
2513500
2499512
2513937
Corrective Action
Documents
Resulting from
Inspection
2515862
Operability
Evaluations
PTN-SY-000-F07
Door Operability Testing
05/20/2025
PTN-0-OP-100
Security Diesel Operation
Revision 13
PTN-SY-002
Site Specific Security Equipment Testing
Revision 28
PTN-SY-017
Vehicle Barrier System
Revision 14
Procedures
Safety Security Interface
Revision 18
Self-Assessments
PTN-23-005
Security Audit Report
2/02/2024
2515820
2515865
Corrective Action
Documents
2515814
2nd Quarter 2024 TRD Documentation
1st Quarter 2025 TRD Documentation
4th Quarter 2024 TRD Documentation
25 Annual Force on Force Documentation
NRA Qualification Course Approval
Armed Responder Tactical OJT Worksheet (40 Hours
Protective Strategy)
03/07/2023
3rd Quarter 2024 TRD Documentation
Security Reportability - Supervisory Awareness Training
Revision 00
NVC IMN CYBR
27
Fleet Specific Cyber Security, Tampering
Miscellaneous
Vision / Gas Mask
/ Hearing
Assistance
Requirements
05/08/2025
Security Training
Revision 8
New Hire Training and Qualification
Revision 6
Firing Range Operations
Revision 11
Security Drill and Exercises
Revision 16
Drill and Exercise Controller Training
Revision 2
Procedures
Adversary Force Training
Revision 4
Weapons Maintenance
Revision 8
Procedures
Conduct of OJT / TPE / Mentoring
Revision 25
Self-Assessments
PI-AA-101-1001-
F01
Level 1 Core Business Assessment Report Guideline
Revision 4
Procedures
Physical Security Plan Revisions
Revision 18
71151
Engineering
Changes
0000298086
71151
Procedures
Security Performance Assessment Program
Revision 13