Security Baseline Inspection Report 05000250/2025401 and 05000251/2025401 (Public)
ML25050A506
Person / Time
Site: Turkey Point  
Issue date: 02/20/2025
From: Jannette Worosilo
NRC/RGN-II/DFRSS
To: Strope M
Florida Power & Light Co
References
IR 2025401
Download: ML25050A506 (1)


Text

SUBJECT:

TURKEY POINT NUCLEAR PLANT, UNIT 3 & 4 - SECURITY BASELINE INSPECTION REPORT 05000250/2025401 AND 05000251/2025401

Dear Michael Strope:

On January 30, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Turkey Point Nuclear Plant, Unit 3 & 4 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low security significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Turkey Point Nuclear Plant, Unit 3 & 4.

The following cross cutting aspect was assigned to a finding using Inspection Manual Chapter 0310 Aspects Within Cross Cutting Areas: [H.12] - Avoid Complacency.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Turkey Point Nuclear Plant, Unit 3 & 4.

February 20, 2025 This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket Nos. 05000250 and 05000251 License Nos. DPR-31 and DPR-41 Enclosure:

As stated cc w/o encl: Distribution via LISTSERV cc w encl: OUO-SRI recipients per the NRR Roster of Licensees Signed by Worosilo, Jannette on 02/20/25