September 18, 2003
SUBJECT:
INSPECTION OF NUCLEAR REACTOR SAFEGUARDS INTERIM COMPENSATORY MEASURES, TEMPORARY INSTRUCTION 2515/148, REVISION 2, AT THE GINNA NUCLEAR POWER PLANT INSPECTION REPORT NO. 05000244/2003011
Dear Mr. Mecredy:
On August 7, 2003, the U.S. Nuclear Regulatory Commission (USNRC) completed a special inspection at the Ginna Nuclear Power Plant, in accordance with Temporary Instruction 2515/148, Revision 2, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures. The enclosed report documents the inspection findings which were discussed on August 7, 2003, with Mr. Robert Popp, Acting Plant Manager, Mr. Ronald Teed, Security Manager, and other members of your staff.
This inspection examined activities conducted under your license as they relate to safety and to compliance with the Commissions rules and regulations, and with the conditions of your license. The specific purpose of this inspection was to verify that Rochester Gas and Electric Corporation, Inc., (RG & E) effectively implemented the interim compensatory measures (ICMs)
at the Ginna Nuclear Power Plant (Ginna) imposed by the Order Modifying License issued February 25, 2002; and that the ICMs were successfully incorporated into your site physical protection strategy and security program. Additionally, the objective of the inspection was to ensure that relevant procedures were developed and implemented, and that interface agreements with offsite organizations were developed and coordinated, as required. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Dr. Robert Based on the results of this inspection, no findings of significance were identified. The inspection team verified and confirmed that RG & E had effectively implemented the specifications of the Order Modifying License issued February 25, 2002 at the Ginna Nuclear Power Plant (Ginna).
In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter, without enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/
Wayne D. Lanning, Director Division of Reactor Safety Docket No.
50-244 License No.
DPR-18 Enclosure:
NRC Inspection Report No. 05000244/2003011 (CONTAINS (SGI))
cc w/o encl w/o SGI:
J. Laurito, President, Rochester Gas and Electric P. Eddy, Electric Division, Department of Public Service, State of New York C. Donaldson, Esquire, State of New York, Department of Law N. Reynolds, Esquire P. Smith, Acting President, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority D. Stenger, Ballard Spahr Andrews and Ingersoll. LLP T. Wideman, Director, Wayne County Emergency Management Office M. Meisenzahl, Administrator, Monroe County, Office of Emergency Preparedness T. Judson, Central New York Citizens Awareness Network
Dr. Robert