I DESIGNATED ORIGINAL
,
s
'
N vtified By
"
.
U. S. NUCLEAR REGULATORY COMMISSION Region I Report No. 50-220/83-11 Docket No. 50-220 License No. DPR-63 Licensee:
Niagara Mohawk Power Corporation 300 Erie Boulevard West Syracuse, New York 13202 Facility Name:
Nine Mile Point, Unit 1 Inspection At:
Scriba, New York Inspection Conducted: May 9-13, 1983 Date of Last Physical Security Inspection:
November 15-18, 1982 Type of Inspection:
Routine, Unannounced, Physical Protection Inspector:
O
-
-
d'o2/-83 RolandJ.Baig,'Physica0fSecurity date signed Inspector Approved By:
[
8 83 A. T. Gody, effieE S rds Section date/ signed Inspection Summary:
Routine, Unannounced Physical Protection Inspection on May 9-13, 1983 (Report No. 50-220/83-11)
Areas Inspected:
Physical Barriers (Protected and Vital Are;,.; Security
-
System Power Supply; Lighting; Assessment Aids; Access Cont m (Personnel, Packages, and Vehicles); Detection Aids (Protected and Vital Areas); Alarm Stations, Communications, and Inspector Followup Items. The inspection involved a total of 37 inspector hours onsite by one region-basri inspector. The inspection began during regular hours and involved a total of 5 inspection hours during off shift periods.
Results: The licensee was found to be in compliance with NRC requirements in the areas examined.
8307110469 830624 PDR ADOCK 05000220
-
.
- -. -
I
.
.
.
REPORT DETAILS 1.
Key Persons Contacted R. Orr, Supervisor, Nuclear Security u
D. MacVittie, Assistant Supervisor, Nuclear Security W. Chambers, Security Investigator, Nuclear Security S. Hudson, Senior Resident Inspector, NRC, Region I All were present during the exit interview.
The inspector also interviewed other licensee personnel and members of the proprietary guard force.
2.
30703 - Exit Interview The inspector met with licensee representatives at the conclusion of the inspection on May 13, 1983. At that time, the purpose and scope of the inspection were reviewed and the findings presented.
3.
92701 - Followup on Inspector-Identified Problems (Closed) (Inspector Followup) (81-20-01) There was no indication that all security systems could be supported by the site emergency diesel generators. A review of security records revealed that on February 7, 1982, March 27 and April 12, 1983, the security system was supported by the site emergency diesel generators.
4.
92702 - Action on Previous Inspection findings
.
(Closed) (Violation) (78-22-03) Failure to maintain the metal and a
explosive detectors in operable condition.
The licensee purchased more reliable equipment.
The metal and explosive detectors were tested and observed to be in operable condition.
b.
(Closed) (Violation) (79-11-01) Failure to establish a portion of a bullet resistant barrier in the Control Room. The inspector observed that the licensee had reinforced the barrier with bullet resisting material.
The entire Control Room was now protected with bullet resisting material.
c.
(Closed) (Violation) (79-11-03) The licensee was utilizing an inadequate test procedure for the metal detector.
The licensee established a new procedure and purchased a more reliable metal detector. The metal detector was tested against the new procedure
,
l during the inspection and functioned properly.
l I
l
'
f
.
.
5.
92703 - IE Information Notice Followup IE Inforsation Notice No. 83-27, Subject: Operational Response to Events Concerning Deliberate Acts Directed Against Plant Equipment.
A review of the Physical Security. Plan, the Security Contingency Plan, and implementing procedures, revealed that the licensee had developed adequ te security procedures to provide sufficient response to events concerning deliberate acts directed against plant equipment.
'
6.
81114 - Site Orientation A site orientation tour was performed to familiarize the inspector with the site, observe any major changes since the last inspection, and identify areas requiring evaluation.
7.
81152 - Physical Barriers (Protected Area)
No violations were noted. The licensee maintained the physical barriers surrounding the protected area in accordance with the physical security plan. The barriers were adequate and appropriate for the intended functicn.
8.
81154 - Physical Barriers (Vital Areas)
THIS PARAGRAPH CONTAlt!S SAFEGUARDS INFORMAT!0!! M!D IS NOT FOR Pli3LIC DISCLOSURE,IIiS llHEliT10NALLY LEfT BLANK.
_
9.
81158 - Security System Power Supply No violations were noted. The licensee maintained an adequate power supply system to provide emergency power to physical security equipment in accordance with security plan commitments.
10.
81162 - Lighting No violations were noted. The licensee's lighting of the isolation zones and protected area met the minimum illumination requirement contained in the security plan and was appropriate for its intended function. The lighting was sufficient to monitor and observe persons and activities within the protected area and isolation zones via closed circuit television or direct visual surveillance for existence of a threat or unauthorized i
activities.
!
l l
,
.
f
.
.
- "
11. 81166 - Assessment Aids No violations were noted. The licensee controlled personnel access to the protected area and vital areas in accordance with security plan requirements.
Search. equipment was adequate and appropriate for detection of firearms, explosives, and incendiary devices during searches of personnel entering the protected area.
12. 81170 - Access Control (Personnel)
No violations were noted. The licensee controlled personnel access to the protected area and vital areas in accordance with security plan requirements.
Search equipment was adequate and appropriate for detection of firearms, explosives, and incendiary devices during searches of personnel entering the protected area.
,
13. 81172 - Access Control (Packages)
No violations were noted. The licensee controlled the entry of packages and material to the' protected area in conformance with the physical security plan. The search equipment used was adequate and appropriate for the intended function.
14. 81174 - Access Control (Vehicles)
- No violations were noted. The licensee controlled access of vehicles to the protected area and vital areas in conformance with the security plan
,
and regulatory requirements.
15. 81178
_ Detection Aids (Protected Area)
No violations were noted. The perimeter intrusion alarm system detected penetration tests of the protected area and isolation zones, as required
by the security plan.
16. 81180 - Detection Aids (Vital Areas)
'
No violations were noted.
The licen.see's' intrusion detection system detected penetration tests of vital areas in accordance with the physical security plan.
17. 81184 - Alarm Stations No violations were noted. The onsite central and secondary alarm stations (CAS/SAS) established by the licensee were maintained in conformance with security plan requirements.
.
-w
-
,
f'
..
.
18, 81188 - Communications No violations were noted. The internal and external communications links established by the licensee conformed to security plan requirements and were adequate and appropriate for their intended functions.
,
19. 81501/2 - Training and Qualification Plan No violations were noted. The licensee's Training and Qualification Plan was adequate and appropriate to meet the general performance requirements and objectives of personnel selection, training and qualification features and standards, and administrative controls.
20. 81601 - Security Contingency Plan No violations were noted. The licensee's Security Contingency Plan (SCP)
was adequate and appropriate to meet the general performance requirements and objectives.
The licensee's responses to contingencies were consistent with responses detailed in the approved SCP and its implementing procedures.
-
,..