IR 05000219/2013006

From kanterella
Jump to navigation Jump to search
ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000219/2013006
ML13240A364
Person / Time
Site: Oyster Creek
Issue date: 09/03/2013
From: Hunegs G
NRC/RGN-I/DRP/PB6
To: Pacilio M
Exelon Nuclear, Exelon Generation Co
hunegs, gk
References
IR-13-006
Download: ML13240A364 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ber 3, 2013

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

OYSTER CREEK NUCLEAR GENERATING STATION (REPORT 05000219/2013006)

Dear Mr. Pacilio:

On August 15, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Oyster Creek Nuclear Generating Station. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2012 through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Oyster Creek operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Oyster Creek during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e, green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2014.

Routine inspections performed by resident inspectors are not included in the inspection plan.

In addition to baseline inspections, the NRC will perform Temporary Instruction (TI) 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks and Inspection Procedure 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants. The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5046 with any questions you have regarding this letter.

Sincerely,

/RA/

Gordon K. Hunegs, Chief Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-219 License Nos.: DRP-16 Enclosure: Inspection Plan cc w/encl: Distribution via ListServ

ML13240A364 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME mmt JKulp/ JK via email BBickett/ BB GHunegs/ GKH DATE 08/ 25/13 08/ 26/13 09/03 /13

Page 1 of 2 Oyster Creek 08/05/2013 06:42:37 Inspection / Activity Plan Report 22 07/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - OCC RAD SAFETY 1 1 07/08/2013 07/12/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls EP EX - EP EXERCISE EVALUATION 6 1 08/05/2013 10/11/2013 IP 7111408 Exercise Evaluation - Scenario Review 1 10/07/2013 10/11/2013 IP 7111401 Exercise Evaluation 7111121 - CDBI 6 1 09/09/2013 09/13/2013 IP 7111121 Component Design Bases Inspection 1 09/23/2013 09/27/2013 IP 7111121 Component Design Bases Inspection 1 10/07/2013 10/11/2013 IP 7111121 Component Design Bases Inspection TI-182 - DEGRADED UNDERGROUND PIPING - PHASE 2 1 1 10/28/2013 11/01/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 71124 - IP 71124.01 06 RAD CLEANU & HP PI VERIFY 1 1 11/04/2013 11/04/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 11/04/2013 11/04/2013 IP 71151 Performance Indicator Verification 1 11/04/2013 11/07/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 5/19EXAM - OYSTER CREEK INITIAL EXAM 4 1 04/21/2014 04/25/2014 U01893 FY14-OYSTER CREEK INITIAL OPERATOR LICENSING EXAM 1 05/19/2014 05/23/2014 U01893 FY14-OYSTER CREEK INITIAL OPERATOR LICENSING EXAM 71124.08 - RADWASTE 1 1 02/03/2014 02/07/2014 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation TRI FI - TRIENNIAL FIRE PROTECTION 4 1 03/24/2014 03/28/2014 IP 7111105T Fire Protection [Triennial]

1 04/07/2014 04/11/2014 IP 7111105T Fire Protection [Triennial]

ISFSI - ISFSI ROUTINE INSPECTION 2 1 04/07/2014 04/11/2014 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 71124 - HP INSPECTION RAD HAZARD ALARA PRE R25 1 1 08/11/2014 08/14/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 08/11/2014 08/14/2014 IP 71124.02 Occupational ALARA Planning and Controls 7111108G - INSERVICE INSPECTION 1 1 09/15/2014 09/19/2014 IP 7111108G Inservice Inspection Activities - BWR 71124 - HP INSPECTION IP 71124.01 .02 .03 04 R25 1 1 09/22/2014 09/26/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 09/22/2014 09/26/2014 IP 71124.02 Occupational ALARA Planning and Controls This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Oyster Creek 08/05/2013 06:42:37 Inspection / Activity Plan Report 22 07/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - HP INSPECTION IP 71124.01 .02 .03 04 R25 1 1 09/22/2014 09/26/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 09/22/2014 09/26/2014 IP 71124.04 Occupational Dose Assessment EP PROG - EP PROGRAM INSPECTION 1 1 09/22/2014 09/26/2014 IP 7111402 Alert and Notification System Testing 1 09/22/2014 09/26/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 09/22/2014 09/26/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 71152B - PI&R BIENNIAL 4 1 11/04/2014 11/09/2014 IP 71152B Problem Identification and Resolution 1 11/18/2014 11/23/2014 IP 71152B Problem Identification and Resolution This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.